Aimsigh do chonradh foirfe.
Cuardaigh tairiscintí trí chuideachtaί go láithreach
Ashgrove Renewables
Fuinneamh, Fóntais agus Cóireáil Dramhaíola
Tairiscintí Meaitseáilte
Piltown Town Centre Regeneration, Co. Kilkenny
●Kilkenny County Council_1185
●Kilkenny County Council_1185
Provision of EV charging and Parking bays and urban renewal enhancement over c.340m of road corridor and 2 no. minor arm approaches. Includes drainage, paving, footpath construction, installation of street furniture, and electrical installation work for EV chargers.
Suíomh
Kilkenny, Ireland
Tréimhse Seirbhíse
12 Months
Spriocdháta
01.09.2026 • 10:00
33
Laethanta
2026 NMBI RFT for Solar Power Panels Installation
●Bord Altranais agus Cnáimhseachais na hÉireann Nursing and Midwifery Board of Ireland
●Bord Altranais agus Cnáimhseachais na hÉireann Nursing and Midwifery Board of Ireland
Conception, fourniture, installation, mise en service et maintenance d'un système photovoltaïque (PV) de 37 kW (environ) à installer sur le toit des bureaux corporatifs à Blackrock, Co. Dublin. Le système doit respecter toutes les normes irlandaises et européennes pertinentes.
Suíomh
Blackrock, Dublin, Irlande
Tréimhse Seirbhíse
24 Months
Uasluach
50.000 €
Spriocdháta
11.09.2026 • 13:00
43
Laethanta
Galway City Council - Single Party Framework for the provision of Heat Pump and Ventilation servicing and maintenance of social housing.
●Galway City Council
●Galway City Council
Inspection of ventilation system, Ventilation equipment, Ventilation ducting, Ventilation installation work, Parts of heat pumps, Heat pumps. Single Party Framework for the provision of Heat Pump and Ventilation servicing and maintenance of social housing.
Suíomh
Galway, Irland
Tréimhse Seirbhíse
48 Monate
Uasluach
500.000 €
Spriocdháta
10.08.2026 • 10:00
11
Laethanta
Air Handling Unit and Chiller Installation at Beaumont Hospital
●Beaumont Hospital_403
●Beaumont Hospital_403
Installation and commissioning of a new air handling unit and chiller within the Hospital's existing V6b plantroom and chiller compound. The appointed contractor will act as PSCS for the project.
Suíomh
Dublin, Ireland
Tréimhse Seirbhíse
24 Months
Spriocdháta
10.08.2026 • 10:00
11
Laethanta
Tairiscintí Gaolmhara in Fuinneamh, Fóntais agus Cóireáil Dramhaíola
Aimsigh deiseanna eile san earnáil chéanna