Löydä itsellesi sopivin tarjouspyyntö.

Etsi yrityksiä tai tarjouspyyntöjä.

Asiantuntijahaku
WA

WayLoader

Rakentaminen

WayLoader toimii alalla Rakentaminen.

Tarjouspyynnöt toimialalle Rakentaminen

Toimialakohtaiset osumat

Nämä tarjouspyynnöt on yhdistetty yrityksen toimialan ja maan perusteella. Aktiivisen FREE-tilin käyttäjät voivat lunastaa tämän yrityksen ja lisätä puuttuvat tiedot löytääkseen tarkempia osumia. Katso tilausten tiedot

Supply, Installation and Annual Maintenance of EV Chargers for Buses. Turnkey solution for the supply and installation of electric vehicle charging infrastructure including complete project management, electrical and civil works, transformers, chargers and charging points, back-office support protocols and training of relevant Bus Éireann staff. Provision of suitable energy storage systems or other sustainable backup systems. Services provided on a novated basis to a lead contractor for larger depot construction projects. Compliance with all relevant Irish and European statutory regulations and international standards. Charging protocols: 150kW IEC 61851 Mode 4 DC (CCS 2.0 Combo 2), 3 phase DC EV Charger 120kW-180kW (CCS 2.0 Combo 2), 3 phase DC EV Charger 30kW-60kW (CCS 2.0 Combo 2), 3 phase AC EV Charger 22kW (IEC 61851 Mode 3), 1 phase AC EV Charger 22kW (IEC 61851 Mode 3), 1 phase AC EV Charger 7kW (IEC 61851 Mode 3).

Electric Vehicle ChargersInstallationCommissioningBus ServicesQualification Panel

Sijainti

Dublin, Ireland

Palvelujakso

not less than 5 years

Määräaika

29.08.2027 • 15:00

274

Päivää

Commercial advisory services for the procurement and contract management of Liquefied Natural Gas (LNG) and other gas commodities.

LNGProcurementContract ManagementAdvisory ServicesGas Commodities…

Sijainti

Ireland

Palvelujakso

180 Days

Määräaika

05.05.2036 • 12:00

3446

Päivää

Engineering, procurement, and construction works and services to complete infrastructure assets, including but not limited to: marine jetty structure, marine piling, floating pontoon, mooring & breasting dolphins, fender, trestle, HP gas unloading systems, on-shore gas receiving facility, utility systems, metering, odourisation, venting, pipeline and pig traps, high pressure gas grid connection, connection to existing natural gas network, utility connections for power, water and telecom, integration with FSRU, onshore terminal systems, pre commissioning and commissioning services, and management of nominated subcontractor(s).

Marine constructionGas infrastructureEPC worksFSRU integrationPipeline construction…

Sijainti

Ireland

Palvelujakso

28.07.2026 - 27.07.2036

Määräaika

25.07.2036 • 12:00

3527

Päivää

9884 Qualification System for Surveys

●Iarnród Eireann-Irish Rail

Vergabe eines Qualifikationssystems (QS) für intrusive Untersuchungsleistungen zur Überwachung der Eisenbahninfrastruktur, Küstengebiete und Gebäudeanlagen von Iarnród Éireann.

Intrusive SurveysEisenbahninfrastrukturBodenuntersuchungGeophysikQualifikationssystem…

Sijainti

Irland

Palvelujakso

7 Jahre

Määräaika

21.08.2033 • 12:00

2458

Päivää

●Iarnród Eireann-Irish Rail

Qualifikationssystem für Baumfällung und Vegetationsbeseitigung, einschließlich planmäßiger Arbeiten (Baumpflege) und Notfallarbeiten bei sicherheitskritischen Situationen. Ancilläre Dienstleistungen können erforderlich sein.

BaumfällungVegetationsbeseitigungQualifikationssystemNotfallarbeitenBaumpflege

Sijainti

Irland

Palvelujakso

8 Jahre

Määräaika

04.09.2031 • 12:00

1741

Päivää

●Donegal Education and Training Board_368

Dynamic Purchasing System (DPS) for Course Consumables for use in Training Centres and Schools

SteelPipingSuppliesDPSConsumables…

Sijainti

Ireland

Palvelujakso

26.06.2026 - 26.06.2031

Hankinnan arvo

10 000 000 €

Määräaika

26.06.2031 • 14:00

1671

Päivää

●Gas Networks Ireland

Design, Herstellung, Montage, Lieferung und Inbetriebnahme kompletter Paketkesselanlagen (PBU) mit natürlichen Gas-betriebenen Kesseln, natürlichen Gas-betriebenen Generatoren, zugehörigen LPHW-Systemen, Steuerungs- und Automatisierungssystemen, Instrumentierung, Dokumentation, FAT/SAT sowie Inbetriebnahmesupport. Dazu gehört der Kauf von Wärmeübertragern als Teil eines integrierten natürlichen Gas-Vorwärmesystems. GNI kann alle oder Teile der PBU und Wärmeübertrager beschaffen. Während des Rahmenzeitraums können zusätzliche Dienstleistungen, Arbeiten und Lieferungen erforderlich sein, z. B. die Bereitstellung von Kesseln und allen Nebenanlagen zur sicheren und effizienten Betriebsführung der PBU. GNI behält sich das Recht vor, Prüfungen (einschließlich Lieferantenqualitätsprüfungen) durchzuführen.

KesselanlagenGasnetzQualifikationssystemWärmeerzeugerInfrastruktur

Sijainti

Irland

Palvelujakso

120 Monate

Määräaika

15.05.2036 • 12:00

3456

Päivää

●Iarnród Eireann-Irish Rail

Provision of strategic/expert advisory services, professional services secondments, project management deliverables, planning advice, alternative design options, and other consultancy services across multiple fields including architectural, engineering, environmental, financial, HR, and safety consultancy.

ArchitekturIngenieurwesenBeratungProjektmanagementUmwelt

Sijainti

Irland

Palvelujakso

02.03.2026 - 03.03.2031

Määräaika

01.03.2031 • 12:00

1554

Päivää

Supply of, Repair and Maintenance for Body Parts; Supply of Parts, Repair and Maintenance of Chassis; Supply of Parts, Repair and Maintenance of Body Panels and Structure; Supply of Parts, Repair and Maintenance of Glazing; Supply of Parts, Repair and Maintenance of Heating, Ventilation and Air Conditioning Systems; Supply of, Repair and Maintenance of Hoses and Pipes; Supply of, Repair and Maintenance of Exterior and Interior Fittings; Supply of, Repair and Maintenance of Ancillary Onboard equipment; Supply of Wheel Rims; Supply of Parts, Repairs and Maintenance of Braking Systems; Supply of Suspension and Steering Systems; Supply of, Repair and Maintenance for General Driveline Systems; Supply of Filters; Supply of, Repair and Maintenance of Electrical and Electronic Components.

Spare PartsBus FleetQualification PanelVehicle MaintenanceTransport Equipment

Sijainti

Dublin, Ireland

Palvelujakso

60 Months

Määräaika

30.04.2033 • 12:00

2345

Päivää

●Technological University Dublin (TU Dublin)

Lieferung von elektrischen Geräten für Lehrzwecke, insbesondere Prüf- und Messgeräte (Oszilloskope, Generatoren, Aufnahmen, Transformatoren).

PrüfgeräteMessgeräteLehrzweckeElektrische GeräteDPS…

Sijainti

Dublin, Irland

Palvelujakso

07.05.2026 bis 07.05.2031

Hankinnan arvo

8 000 000 €

Määräaika

07.05.2031 • 14:00

1621

Päivää

Liittyvät Tarjouspyynnöt alalla Rakentaminen

Löydä muita mahdollisuuksia samalta toimialalta

St. Dominic’s Park Civil Works Package

Drogheda, County Louth, Ireland

civil worksplayground extensioncar parkdrainagegreen public procurement

Määräaika

15.12.2026

17

Päivää

Invitation to Tender for Architectural Consultancy Services for Climate Action and Toilet Block Upgrades at St.Louis Secondary School, Castletown Road, Dundalk Roll No. 63910U

Dundalk, Ireland

architectural consultancytoilet upgradesclimate actioninsulationbike racks

Määräaika

16.12.2026

18

Päivää

Culvert repair and ancillary works (Phase 2), Peoples Gardens, Phoenix Park, Dublin 8.

Phoenix Park, Dublin, Ireland

culvert repairprecast culvertslandscapingpedestrian pathsplayground reinstatement

Määräaika

14.12.2026

16

Päivää

Request for Expressions of Interest for Purpose-Built Student Accommodation ("PBSA") - Potential On-Campus and Off-Campus Development Opportunities

Ireland

purpose-built student accommodationon-campus developmenthigher educationIrelandoff-campus development…

Määräaika

11.12.2026

13

Päivää

WCCC25 494 Munster Express Development Works

Waterford, Ireland

refurbishmentextensiondemolitionexhibition spacescircular economy

Määräaika

04.12.2026

6

Päivää

Architect Consultancy and PSDP Services with bought in services - Green Devolved Project at Templemore College

Templemore, County Tipperary, Ireland

architect consultancyPSDP servicesbought-in servicesgreen projectfurther education college

Määräaika

15.12.2026

17

Päivää

Croagh to Rathkeale Design and Construction Contract

Limerick and Clare, Ireland

road constructionmotorwaydual carriagewaydrainageretaining walls

Määräaika

19.02.2027

83

Päivää

Domestic Violence Refuge and Social Housing at Evergreen Road, Turner’s Cross, Cork

Turner’s Cross, Cork, Ireland

domestic violence refugesocial housingrenovationapartmentsconstruction

Määräaika

09.12.2026

11

Päivää

Beechlawn Fire Safety Refurbishment and Extension Works

Dublin, Ireland

fire safetyrefurbishmentextension works

Määräaika

11.01.2027

44

Päivää

Clontuskert GWSS Tristaun Extension

Tristaun, Ballinasloe, County Galway, Ireland

water supply pipelinepipeline constructionancillary workswater supply extension

Määräaika

11.12.2026

13

Päivää

Ballyferriter Museum Refurbishment Contract

Ballyferriter, County Kerry, Ireland

museum refurbishmentstructural alterationsroof renewalM&E upgradesexternal works

Määräaika

14.12.2026

16

Päivää

Conservation, refurbishment and adaptive reuse works at the former Tipperary Town Courthouse and Bridewell

Tipperary Town, County Tipperary, Ireland

courthouse restorationrefurbishmentadaptive reuseBridewelladult education centre

Määräaika

18.12.2026

20

Päivää

Claureen Link Road Phase 1

County Clare, Ireland

Claureen Link Roadroad constructiondrainagecycle trackutility diversions

Määräaika

11.12.2026

13

Päivää

Meath Co Co - MH-TRA-26-21 - Single-Party Framework for Architect-led Multi Disciplinary Design Services for the initial project of the Laytown - Bettystown Community Building and Park

Bettystown, County Meath, Ireland

architect-led designmultidisciplinary designcommunity buildingpublic parkframework

Määräaika

07.01.2027

40

Päivää

2026 Architectural Design Consultant for ASA project at Scoil Naomh Cualan Pallas Street Borrisoleigh, Thurles, Co. Tipperary

Borrisoleigh, County Tipperary, Ireland

architectural designschool extensionclassroomssensory gardendemolition

Määräaika

18.12.2026

20

Päivää