Löydä täydellinen sopimuksesi.
Hae tarjouskilpailuja yritysten kautta välittömästi
TOBIN Consulting Engineers
Rakentaminen
Vastaavat tarjouskilpailut
Multi-Party Framework Agreement for Energy Efficient Design Services as part of an Architect Led Design Team to deliver multiple Enabling Works Projects at University Hospital Galway
●Health Service Executive (HSE)
●Health Service Executive (HSE)
Multi-Party Framework agreement for Energy Efficient Design (EED) on an established design team framework for services awarded on a cascade or mini competitions at sole discretion of the Client for Enabling Works projects an indicative value of typically €1.5m to €20m at University Hospital Galway and off campus.
Sijainti
Galway, Irland
Palvelujakso
4 Monate
Enimmäisarvo
15.000.000 €
Määräaika
21.08.2026 • 15:00
22
Päivää
Donegal County Council -The Two Rivers - Catchment, Community and Climate Project, Carndonagh, Co. Donegal
●Donegal County Council_1193
●Donegal County Council_1193
Professionelle Dienstleistungen zur Umsetzung des Projekts über einen Zeitraum von 13 Monaten. Das Projekt umfasst Einzugsgebietsbewertungen und GIS-Kartierung, Planung und Durchführung von Bildungs- und Sensibilisierungsaktivitäten, die Einrichtung einer lokalen Einzugsgebiets-Stewardship-Gruppe, die Entwicklung und Koordination eines Citizen-Science-Monitoring-Programms von der Quelle bis zum Meer sowie die Umsetzung eines Pilotprojekts zur Wiederherstellung von Uferlebensräumen. Das übergeordnete Ziel ist die Verbesserung der Biodiversität, der Wasserqualität und der Klimaresilienz.
Sijainti
Donegal, Irland
Palvelujakso
13 Monate
Määräaika
14.08.2026 • 10:00
15
Päivää
TR5679 - Mechanical and Electrical Professional Services
●Electricity Supply Board ( ESB )
●Electricity Supply Board ( ESB )
Mechanical and Electrical Professional Services to support the delivery of capital and minor works projects in Dublin region in the Republic of Ireland.
Sijainti
Dublin, Ireland
Palvelujakso
84 Months
Enimmäisarvo
1.200.000 €
Määräaika
24.08.2026 • 10:00
25
Päivää
Refurbishments and Extension at Cape Clear Heritage Centre at Oileán Chléire, Co. Corcaigh
●Údarás Na Gaeltachta_289
●Údarás Na Gaeltachta_289
Refurbishments and Extension at Cape Clear Heritage Centre at Oileán Chléire, Co. Corcaigh, Athchóirithe agus Síneadh ar Ionad Oidhreachta Oileán Chléire, Oileán Chléire, Co. Chorcaí
Sijainti
Cape Clear, Ireland
Palvelujakso
18 Months
Enimmäisarvo
300.000 €
Määräaika
28.08.2026 • 11:00
29
Päivää
HSE Estates SW: Regional Design Team Major Framework (€50M - €400M) 2025 for HSE South West Region
●Health Service Executive (HSE)
●Health Service Executive (HSE)
Regionales Rahmenabkommen für HSE Design Team Services 2025 für Hauptkapitalmaßnahmen mit Projektwerten zwischen 50 Mio. und 400 Mio. EUR (exkl. MwSt.). Rahmen für Architektenleistungen (einschließlich Planer und BIM-Information Manager), Mengenverwalter, Gebäudeingenieur, Bauingenieur für zivil- und strukturelle Arbeiten, Brandschutzberater, Projektüberwachungs-Design-Prozess (PSDP), Auftraggebervertreter, energieeffizientes Design-Facilitator und Zuweisender Zertifikatgeber.
Sijainti
Irland
Palvelujakso
48 Monate
Enimmäisarvo
800.000.000 €
Määräaika
31.08.2026 • 10:00
32
Päivää
Celbridge Hazelhatch Mobility Corridor (Phase 5 to 7)
●Kildare County Council_385
●Kildare County Council_385
Detailed Design, Construction Administration and Project Handover of all scheme works, as approved or modified by An Coimisiún Pleanála. Approximately 2.0 km of new single carriageway mobility corridor extending from the R403 Clane Road to the R405 Hazelhatch Road, incorporating high quality active travel provision throughout. A new 66m long clear span bridge crossing of the River Liffey, designed in accordance with relevant Eurocodes and OPW requirements, with no in stream works required. Segregated footpaths and cycle facilities provided along the full length of the route, including: 2.0m wide one way cycle tracks and 2.0 m wide footpaths on both sides of the carriageway for the majority of the corridor; and a 3.0 m wide two way cycle track and footpath on constrained sections approaching Hazelhatch and Celbridge Train Station. New and upgraded junctions including signalised junctions at the R403 Clane Road, Newtown Road and R405 Hazelhatch Road, together with a priority junction at Simmonstown Manor Road and improvements to the Loughlinstown Road roundabout. Public lighting, drainage and SuDS infrastructure, including roadside drainage systems and attenuation features designed to limit discharge to greenfield run off rates and improve existing flood risk conditions. Landscaping, planting and biodiversity measures, including native species woodland and hedgerow planting, tree planting and integration of sustainable drainage features, delivering a net biodiversity gain along the corridor. Utility diversions, protections and accommodation works, including foul and surface water drainage infrastructure, watermains, ESB, Gas Networks and telecommunications assets, as required to facilitate delivery of the scheme. The Consultant shall undertake an Infrastructure Review in conjunction with Kildare County Council, relevant utility providers and other key stakeholders. All environmental mitigation, monitoring and reporting required under the Appropriate Assessment process, Natura Impact Statement, Flood Risk Assessment, and associated environmental and technical assessments accompanying the Section 177AE application.
Sijainti
Ireland
Palvelujakso
39 Months
Enimmäisarvo
300.000 €
Määräaika
25.08.2026 • 14:00
26
Päivää
Piltown Town Centre Regeneration, Co. Kilkenny
●Kilkenny County Council_1185
●Kilkenny County Council_1185
Provision of EV charging and Parking bays and urban renewal enhancement over c.340m of road corridor and 2 no. minor arm approaches. Includes drainage, paving, footpath construction, installation of street furniture, and electrical installation work for EV chargers.
Sijainti
Kilkenny, Ireland
Palvelujakso
12 Months
Määräaika
01.09.2026 • 10:00
33
Päivää
TR5679 - Mechanical and Electrical Professional Services
●Electricity Supply Board ( ESB )
●Electricity Supply Board ( ESB )
Mechanical and Electrical Professional Services to support the delivery of capital and minor works projects in the Dublin Region.
Sijainti
Dublin, Ireland
Palvelujakso
7 Months
Enimmäisarvo
1.200.000 €
Määräaika
17.08.2026 • 10:00
18
Päivää
Bogganfin/Tuam Road Link Road, Monksland Strategic Road Project - Engineering Consultancy Service
●Roscommon County Council_424
●Roscommon County Council_424
Engineering Consultancy Services for the delivery of Stages 1 to 4 of the Monksland Strategic Road Project linking the R362 to the N61 at Monksland, Co. Roscommon
Sijainti
Roscommon, Ireland
Palvelujakso
3 Years
Määräaika
07.08.2026 • 14:00
8
Päivää
Architect or Engineer Led Integrated Multidisciplinary Design Team Consultancy services for the National Biorefinery Pilot Project (NBPP) Infrastructure Upgrade and Expansion Works
●Tipperary County Council
●Tipperary County Council
The Project comprises the upgrade and expansion of the NBPP building, including all associated design, coordination, statutory approvals, and construction supervision services. The works will be carried out within an operational (live) facility and shall include the integration of new and existing building elements, services, and systems. The Consultant's Services shall address all relevant site constraints, including continuity of operations, health and safety requirements, phasing of works, and coordination with stakeholders. The scope includes multidisciplinary design services to deliver a compliant, functional, and cost-effective solution in accordance with the Client's requirements and applicable statutory standards.
Sijainti
Mid-West, Ireland
Palvelujakso
18 Months
Määräaika
20.08.2026 • 10:00
21
Päivää
Liittyvät Tarjouspyynnöt alalla Rakentaminen
Löydä muita mahdollisuuksia samalta toimialalta