Löydä täydellinen sopimuksesi.
Hae tarjouskilpailuja yritysten kautta välittömästi
McElroy Associates
Rakentaminen
Vastaavat tarjouskilpailut
TR5679 - Mechanical and Electrical Professional Services
●Electricity Supply Board ( ESB )
●Electricity Supply Board ( ESB )
Mechanical and Electrical Professional Services to support the delivery of capital and minor works projects in Dublin region in the Republic of Ireland.
Sijainti
Dublin, Ireland
Palvelujakso
84 Months
Enimmäisarvo
1.200.000 €
Määräaika
24.08.2026 • 10:00
26
Päivää
Celbridge Hazelhatch Mobility Corridor (Phase 5 to 7)
●Kildare County Council_385
●Kildare County Council_385
Detailed Design, Construction Administration and Project Handover of all scheme works, as approved or modified by An Coimisiún Pleanála. Approximately 2.0 km of new single carriageway mobility corridor extending from the R403 Clane Road to the R405 Hazelhatch Road, incorporating high quality active travel provision throughout. A new 66m long clear span bridge crossing of the River Liffey, designed in accordance with relevant Eurocodes and OPW requirements, with no in stream works required. Segregated footpaths and cycle facilities provided along the full length of the route, including: 2.0m wide one way cycle tracks and 2.0 m wide footpaths on both sides of the carriageway for the majority of the corridor; and a 3.0 m wide two way cycle track and footpath on constrained sections approaching Hazelhatch and Celbridge Train Station. New and upgraded junctions including signalised junctions at the R403 Clane Road, Newtown Road and R405 Hazelhatch Road, together with a priority junction at Simmonstown Manor Road and improvements to the Loughlinstown Road roundabout. Public lighting, drainage and SuDS infrastructure, including roadside drainage systems and attenuation features designed to limit discharge to greenfield run off rates and improve existing flood risk conditions. Landscaping, planting and biodiversity measures, including native species woodland and hedgerow planting, tree planting and integration of sustainable drainage features, delivering a net biodiversity gain along the corridor. Utility diversions, protections and accommodation works, including foul and surface water drainage infrastructure, watermains, ESB, Gas Networks and telecommunications assets, as required to facilitate delivery of the scheme. The Consultant shall undertake an Infrastructure Review in conjunction with Kildare County Council, relevant utility providers and other key stakeholders. All environmental mitigation, monitoring and reporting required under the Appropriate Assessment process, Natura Impact Statement, Flood Risk Assessment, and associated environmental and technical assessments accompanying the Section 177AE application.
Sijainti
Ireland
Palvelujakso
39 Months
Enimmäisarvo
300.000 €
Määräaika
25.08.2026 • 14:00
27
Päivää
Piltown Town Centre Regeneration, Co. Kilkenny
●Kilkenny County Council_1185
●Kilkenny County Council_1185
Provision of EV charging and Parking bays and urban renewal enhancement over c.340m of road corridor and 2 no. minor arm approaches. Includes drainage, paving, footpath construction, installation of street furniture, and electrical installation work for EV chargers.
Sijainti
Kilkenny, Ireland
Palvelujakso
12 Months
Määräaika
01.09.2026 • 10:00
34
Päivää
TR5679 - Mechanical and Electrical Professional Services
●Electricity Supply Board ( ESB )
●Electricity Supply Board ( ESB )
Mechanical and Electrical Professional Services to support the delivery of capital and minor works projects in the Dublin Region.
Sijainti
Dublin, Ireland
Palvelujakso
7 Months
Enimmäisarvo
1.200.000 €
Määräaika
17.08.2026 • 10:00
19
Päivää
Bogganfin/Tuam Road Link Road, Monksland Strategic Road Project - Engineering Consultancy Service
●Roscommon County Council_424
●Roscommon County Council_424
Engineering Consultancy Services for the delivery of Stages 1 to 4 of the Monksland Strategic Road Project linking the R362 to the N61 at Monksland, Co. Roscommon
Sijainti
Roscommon, Ireland
Palvelujakso
3 Years
Määräaika
07.08.2026 • 14:00
9
Päivää
Multi-Party Framework for Bridge Rehabilitation Consultancy Services, Assessment, Design and Inspection for Offaly County Council - Initial Contract - Boyne Bridge and Raheenakeeran Bridge Co. Offaly
●Offaly County Council_448
●Offaly County Council_448
Multi-Party Framework for Bridge Rehabilitation Consultancy Services, Assessment, Design and Inspection for Offaly County Council - Initial Contract - Boyne Bridge and Raheenakeeran Bridge Co. Offaly. Design Consultancy Services (Stages ii to v)
Sijainti
Ireland
Palvelujakso
60 Months
Enimmäisarvo
2.000.000 €
Määräaika
14.08.2026 • 14:00
16
Päivää
Request for Tender for Architect Led Multi-Disciplinary Design and Cost Management Team for New Airfield Vehicle Entry Screening Post, Associated Infrastructure and Ancillary Works at Shannon Airport
●Shannon Airport Authority DAC
●Shannon Airport Authority DAC
Architectural and related services, engineering design, cost management for new airfield vehicle entry screening post, associated infrastructure and ancillary works at Shannon Airport.
Sijainti
Shannon, Ireland
Palvelujakso
28 Months
Määräaika
24.08.2026 • 11:00
26
Päivää
Galway City Council - Single Party Framework for the provision of Heat Pump and Ventilation servicing and maintenance of social housing.
●Galway City Council
●Galway City Council
Inspection of ventilation system, Ventilation equipment, Ventilation ducting, Ventilation installation work, Parts of heat pumps, Heat pumps. Single Party Framework for the provision of Heat Pump and Ventilation servicing and maintenance of social housing.
Sijainti
Galway, Irland
Palvelujakso
48 Monate
Enimmäisarvo
500.000 €
Määräaika
10.08.2026 • 10:00
12
Päivää
Air Handling Unit and Chiller Installation at Beaumont Hospital
●Beaumont Hospital_403
●Beaumont Hospital_403
Installation and commissioning of a new air handling unit and chiller within the Hospital's existing V6b plantroom and chiller compound. The appointed contractor will act as PSCS for the project.
Sijainti
Dublin, Ireland
Palvelujakso
24 Months
Määräaika
10.08.2026 • 10:00
12
Päivää
RFT for the Establishment of a Single Party Framework Agreement for Architectural Design Services, including Specialist Skills, for project values of less than €1m for ATU Donegal
●Atlantic Technological University
●Atlantic Technological University
Architectural Design Consultancy Services including Specialist Skills for minor works, maintenance, upgrades and refurbishment projects at its Donegal Campuses.
Sijainti
Donegal, Irland
Palvelujakso
48 Monate
Enimmäisarvo
350.000 €
Määräaika
05.08.2026 • 10:00
7
Päivää
Liittyvät Tarjouspyynnöt alalla Rakentaminen
Löydä muita mahdollisuuksia samalta toimialalta