Löydä täydellinen sopimuksesi.

Hae tarjouskilpailuja yritysten kautta välittömästi

Asiantuntijahaku
JO

John Cradock Ltd

Rakentaminen

Kilcullen, Kildare, Irlanti
Bau- und TiefbauarbeitenStraßeninfrastrukturBrückenbau

Vastaavat tarjouskilpailut

9840 Design and Build Enabling Works at the DART+ and MetroLink Interface at Glasnevin

Iarnród Eireann-Irish Rail

Design and Build of Enabling Works at the DART+ and MetroLink Interface at Glasnevin, Dublin, to facilitate the construction of MetroLink. Includes detailed design and construction of key enabling works such as site preparation, demolition, excavation, earthmoving, drainage, railway construction works, and associated civil engineering tasks.

ConstructionRailwayDesign and Build

Sijainti

Dublin, Ireland

Palvelujakso

5 Years

Enimmäisarvo

200.000.000 €

Määräaika

25.08.202610:00

25

Päivää

Refurbishments and Extension at Cape Clear Heritage Centre at Oileán Chléire, Co. Corcaigh

Údarás Na Gaeltachta_289

Refurbishments and Extension at Cape Clear Heritage Centre at Oileán Chléire, Co. Corcaigh, Athchóirithe agus Síneadh ar Ionad Oidhreachta Oileán Chléire, Oileán Chléire, Co. Chorcaí

RefurbishmentExtensionConstruction

Sijainti

Cape Clear, Ireland

Palvelujakso

18 Months

Enimmäisarvo

300.000 €

Määräaika

28.08.202611:00

28

Päivää

Celbridge Hazelhatch Mobility Corridor (Phase 5 to 7)

Kildare County Council_385

Detailed Design, Construction Administration and Project Handover of all scheme works, as approved or modified by An Coimisiún Pleanála. Approximately 2.0 km of new single carriageway mobility corridor extending from the R403 Clane Road to the R405 Hazelhatch Road, incorporating high quality active travel provision throughout. A new 66m long clear span bridge crossing of the River Liffey, designed in accordance with relevant Eurocodes and OPW requirements, with no in stream works required. Segregated footpaths and cycle facilities provided along the full length of the route, including: 2.0m wide one way cycle tracks and 2.0 m wide footpaths on both sides of the carriageway for the majority of the corridor; and a 3.0 m wide two way cycle track and footpath on constrained sections approaching Hazelhatch and Celbridge Train Station. New and upgraded junctions including signalised junctions at the R403 Clane Road, Newtown Road and R405 Hazelhatch Road, together with a priority junction at Simmonstown Manor Road and improvements to the Loughlinstown Road roundabout. Public lighting, drainage and SuDS infrastructure, including roadside drainage systems and attenuation features designed to limit discharge to greenfield run off rates and improve existing flood risk conditions. Landscaping, planting and biodiversity measures, including native species woodland and hedgerow planting, tree planting and integration of sustainable drainage features, delivering a net biodiversity gain along the corridor. Utility diversions, protections and accommodation works, including foul and surface water drainage infrastructure, watermains, ESB, Gas Networks and telecommunications assets, as required to facilitate delivery of the scheme. The Consultant shall undertake an Infrastructure Review in conjunction with Kildare County Council, relevant utility providers and other key stakeholders. All environmental mitigation, monitoring and reporting required under the Appropriate Assessment process, Natura Impact Statement, Flood Risk Assessment, and associated environmental and technical assessments accompanying the Section 177AE application.

Civil EngineeringHighways ConsultancyBridge Design

Sijainti

Ireland

Palvelujakso

39 Months

Enimmäisarvo

300.000 €

Määräaika

25.08.202614:00

25

Päivää

Piltown Town Centre Regeneration, Co. Kilkenny

Kilkenny County Council_1185

Provision of EV charging and Parking bays and urban renewal enhancement over c.340m of road corridor and 2 no. minor arm approaches. Includes drainage, paving, footpath construction, installation of street furniture, and electrical installation work for EV chargers.

ConstructionEV ChargingRoad Works

Sijainti

Kilkenny, Ireland

Palvelujakso

12 Months

Määräaika

01.09.202610:00

32

Päivää

Multi-Party Framework for Bridge Rehabilitation Consultancy Services, Assessment, Design and Inspection for Offaly County Council - Initial Contract - Boyne Bridge and Raheenakeeran Bridge Co. Offaly

Offaly County Council_448

Multi-Party Framework for Bridge Rehabilitation Consultancy Services, Assessment, Design and Inspection for Offaly County Council - Initial Contract - Boyne Bridge and Raheenakeeran Bridge Co. Offaly. Design Consultancy Services (Stages ii to v)

Bridge rehabilitationStructural engineeringDesign consultancy

Sijainti

Ireland

Palvelujakso

60 Months

Enimmäisarvo

2.000.000 €

Määräaika

14.08.202614:00

14

Päivää

Civil and Structural Engineering Consultancy Services (Design) and PSDP Consultancy for Monaghan Blackwater Sluices Access Design

Office of Public Works (OPW)

To design improved access infrastructure to 22no sluices (non-return valves) located within the Monaghan Blackwater Arterial Drainage Flood Relief Scheme in Co. Monaghan.

Civil EngineeringStructural DesignFlood Defences

Sijainti

Border, Ireland

Palvelujakso

18 Months

Enimmäisarvo

145.000 €

Määräaika

17.08.202613:00

17

Päivää

Request for Tender for Architect Led Multi-Disciplinary Design and Cost Management Team for New Airfield Vehicle Entry Screening Post, Associated Infrastructure and Ancillary Works at Shannon Airport

Shannon Airport Authority DAC

Architectural and related services, engineering design, cost management for new airfield vehicle entry screening post, associated infrastructure and ancillary works at Shannon Airport.

ArchitekturIngenieurwesenInfrastruktur

Sijainti

Shannon, Ireland

Palvelujakso

28 Months

Määräaika

24.08.202611:00

24

Päivää

Procurement of an Integrated Design Team for New DV Refuge at Tailteann Drive, Navan, Co Meath for Meath Women's Aid Housing Association CLG

Meath Women’s Aid Housing Association CLG

Beschaffung eines integrierten Design-Teams bestehend aus Projektmanager, Architekt mit Landschaftsdesign-Dienstleistungen, Vertretung des Auftraggebers, Projektüberwacher für den Designprozess, Brandschutz- und DAC-Ingenieur, Design- und Zertifizierungsbeauftragte, Bauingenieur für Zivil- und Tragwerksbau, Gebäudeanlagentechniker und Kostenplaner für ein neues DV-Refugium an der Tailteann Drive, Navan, Co Meath.

ArchitekturBauingenieurwesenDesign

Sijainti

Navan, Irland

Palvelujakso

42 Monate

Enimmäisarvo

750.000 €

Määräaika

14.08.202610:00

14

Päivää

TEN2600112 - cFT for Integrated Design Team for the Development of the Bailieborough Town Centre Regeneration Scheme (Stages (i) to (ii) for Cavan County Council

Cavan County Council

Zivilingenieurberatungsleistungen und architektonische Dienstleistungen für die Entwicklung des Regenerierungsschemas für das Bailieborough Town Centre (Stufen i und ii).

ZivilingenieurwesenArchitekturStadtplanung

Sijainti

Cavan, Irland

Palvelujakso

18 Monate

Määräaika

07.08.202610:00

7

Päivää

Liittyvät Tarjouspyynnöt alalla Rakentaminen

Löydä muita mahdollisuuksia samalta toimialalta

Fire Compliance Works to 82 number apartments over two phases at Rochdale, Claremount Avenue, Honey Park, Dun Laoghaire, Dublin.

Dublin, Irland

FeuerwehrBauarbeitenMehrfamilienhaus

Määräaika

01.09.2026

33

Päivää

Enabling works for new glasshouse at Glenveagh National Park

West, Irland

BauarbeitenNeubauSanierung

Määräaika

03.09.2026

34

Päivää

26/034 - A Qualification System for the provision of Engineering, Procurement, Construction, Operation and Maintenance Services for the Strategic Gas Emergency Reserve

Ireland

Marine constructionGas infrastructureEPC works

Määräaika

25.07.2036

3647

Päivää

Works Contractor PSCS and PSDP - Contractor Design and Build (PWCF2) - Development of 36no. homes and community centre at Mill Lane, Leixlip, Co. Kildare

Leixlip, Irland

BauarbeitenWohnungsbauGemeinschaftszentrum

Määräaika

04.09.2026

35

Päivää

Dublin City Council - Contract for Dodder Greenway Milltown Road - Dodder Walk to Dundrum Road Active Travel Scheme

Dublin, Irland

BauarbeitenRadinfrastrukturFußwege

Määräaika

27.08.2026

28

Päivää

Arranmore/Árainn Mhór Slipway Repairs 2026 - Donegal County Council

Arranmore Island, Ireland

Pier constructionSlipway repairsMarine works

Määräaika

20.08.2026

20

Päivää

Daisy Building Enhancement carried out by Donegal County Council

Carndonagh, Irland

BauarbeitenSanierungZäune

Määräaika

28.08.2026

28

Päivää

Ballycoolin Bus Depot Design and Build

Dublin, Ireland

Bus DepotConstructionDesign and Build

Määräaika

28.08.2026

28

Päivää

Construction of SEN Extension to Clarecastle National School

Clarecastle, Irland

SchulbauSEN-ErweiterungNeubau

Määräaika

28.08.2026

28

Päivää

Design, Construction and Delivery of Cherry Orchard (Affordable for Sale) Housing Development (Pro405)

Dublin, Irland

BauWohnungsbauNeubau

Määräaika

25.08.2026

25

Päivää

DCC - Home Building Programme Contractor Multi Party Framework Agreement in 2 Lots A and B

Dublin, Ireland

Housing ConstructionDesign and BuildSocial Housing

Määräaika

26.08.2026

26

Päivää

Construction of extensions at Mooncoin Junior and Senior Schools Scoil Mhuire NS Mooncoin Co. Waterford

Mooncoin, Irland

SchulbauErweiterungBauarbeiten

Määräaika

21.08.2026

21

Päivää

Emergency Works (Co. Kildare Schools)

Ireland

Architectural servicesEmergency worksSchools

Määräaika

23.08.2026

24

Päivää

Integrated Design Team Services for New Municipal Cemetery at Letterkenny, County Donegal

Ireland

Architectural ServicesCemetery ConstructionDesign Team

Määräaika

23.08.2026

23

Päivää

Emergency Works (Co. Wicklow Schools)

Dublin, Irland

ArchitekturNotfallmaßnahmenSchulen

Määräaika

23.08.2026

24

Päivää