Löydä täydellinen sopimuksesi.
Hae tarjouskilpailuja yritysten kautta välittömästi
HG Construction Ire
Rakentaminen
Vastaavat tarjouskilpailut
Emergency Works (Co. Wicklow Schools)
●Kildare and Wicklow Education and Training Board
●Kildare and Wicklow Education and Training Board
Architectural Consultancy Services projects comprising of * Improving Disability Access to the Main Entrance in Glenart College, Arklow, Co. Wicklow. * Roof repair works on the main school building and sports hall in Avondale Community College, Rathdrum, Co. Wicklow.
Sijainti
Dublin, Irland
Palvelujakso
18 Monate
Enimmäisarvo
85.000 €
Määräaika
23.08.2026 • 21:45
23
Päivää
Emergency Works (Co. Kildare Schools)
●Kildare and Wicklow Education and Training Board
●Kildare and Wicklow Education and Training Board
Architectural Consultancy Services for emergency works including: repair of defective render at Athy Community College, replacement and automation of doors at Ard Scoil Rath Iomghain, and roof repair works to prefabricated buildings and the PE hall at Ard Scoil Rath Iomghain.
Sijainti
Ireland
Palvelujakso
18 Months
Enimmäisarvo
47.000 €
Määräaika
23.08.2026 • 21:45
23
Päivää
9840 Design and Build Enabling Works at the DART+ and MetroLink Interface at Glasnevin
●Iarnród Eireann-Irish Rail
●Iarnród Eireann-Irish Rail
Design and Build of Enabling Works at the DART+ and MetroLink Interface at Glasnevin, Dublin, to facilitate the construction of MetroLink. Includes detailed design and construction of key enabling works such as site preparation, demolition, excavation, earthmoving, drainage, railway construction works, and associated civil engineering tasks.
Sijainti
Dublin, Ireland
Palvelujakso
5 Years
Enimmäisarvo
200.000.000 €
Määräaika
25.08.2026 • 10:00
24
Päivää
Celbridge Hazelhatch Mobility Corridor (Phase 5 to 7)
●Kildare County Council_385
●Kildare County Council_385
Detailed Design, Construction Administration and Project Handover of all scheme works, as approved or modified by An Coimisiún Pleanála. Approximately 2.0 km of new single carriageway mobility corridor extending from the R403 Clane Road to the R405 Hazelhatch Road, incorporating high quality active travel provision throughout. A new 66m long clear span bridge crossing of the River Liffey, designed in accordance with relevant Eurocodes and OPW requirements, with no in stream works required. Segregated footpaths and cycle facilities provided along the full length of the route, including: 2.0m wide one way cycle tracks and 2.0 m wide footpaths on both sides of the carriageway for the majority of the corridor; and a 3.0 m wide two way cycle track and footpath on constrained sections approaching Hazelhatch and Celbridge Train Station. New and upgraded junctions including signalised junctions at the R403 Clane Road, Newtown Road and R405 Hazelhatch Road, together with a priority junction at Simmonstown Manor Road and improvements to the Loughlinstown Road roundabout. Public lighting, drainage and SuDS infrastructure, including roadside drainage systems and attenuation features designed to limit discharge to greenfield run off rates and improve existing flood risk conditions. Landscaping, planting and biodiversity measures, including native species woodland and hedgerow planting, tree planting and integration of sustainable drainage features, delivering a net biodiversity gain along the corridor. Utility diversions, protections and accommodation works, including foul and surface water drainage infrastructure, watermains, ESB, Gas Networks and telecommunications assets, as required to facilitate delivery of the scheme. The Consultant shall undertake an Infrastructure Review in conjunction with Kildare County Council, relevant utility providers and other key stakeholders. All environmental mitigation, monitoring and reporting required under the Appropriate Assessment process, Natura Impact Statement, Flood Risk Assessment, and associated environmental and technical assessments accompanying the Section 177AE application.
Sijainti
Ireland
Palvelujakso
39 Months
Enimmäisarvo
300.000 €
Määräaika
25.08.2026 • 14:00
24
Päivää
Piltown Town Centre Regeneration, Co. Kilkenny
●Kilkenny County Council_1185
●Kilkenny County Council_1185
Provision of EV charging and Parking bays and urban renewal enhancement over c.340m of road corridor and 2 no. minor arm approaches. Includes drainage, paving, footpath construction, installation of street furniture, and electrical installation work for EV chargers.
Sijainti
Kilkenny, Ireland
Palvelujakso
12 Months
Määräaika
01.09.2026 • 10:00
31
Päivää
Development of a New NPWS Visitor Park Centre for The Burren National Park
●Department of Housing Local Government and Heritage
●Department of Housing Local Government and Heritage
Provision of Architect or Engineer led Design Team Consultancy Services for development at 1-2 Riverview, Church Street, Newtown, Corofin, Co Clare V95 ANP8. The development will consist of: The demolition of 1-2 Riverview buildings and associated outbuildings and boundary wall and the development of a single storey NPWS Visitor Centre for The Burren National Park, 3 storey NPWS office building, car parking facilities with associated vehicle access points and ramp and all associated site development, boundary and landscaping works.
Sijainti
Corofin, Irland
Palvelujakso
50 Monate
Määräaika
21.08.2026 • 10:00
20
Päivää
Multi-Party Framework for Bridge Rehabilitation Consultancy Services, Assessment, Design and Inspection for Offaly County Council - Initial Contract - Boyne Bridge and Raheenakeeran Bridge Co. Offaly
●Offaly County Council_448
●Offaly County Council_448
Multi-Party Framework for Bridge Rehabilitation Consultancy Services, Assessment, Design and Inspection for Offaly County Council - Initial Contract - Boyne Bridge and Raheenakeeran Bridge Co. Offaly. Design Consultancy Services (Stages ii to v)
Sijainti
Ireland
Palvelujakso
60 Months
Enimmäisarvo
2.000.000 €
Määräaika
14.08.2026 • 14:00
13
Päivää
Assigned Certifier Services for the Department of Education and Youth Lot 09 Design and Build projects
●Department of Education and Youth
●Department of Education and Youth
Zertifizierungsdienstleistungen für das Ministerium für Bildung und Jugend für Projekte im Rahmen des Design-and-Build-Schulen-Mehrpartei-Auftragsrahmens Nummer 1 2020-2021 gemäß den Vorschriften zur Baugenehmigung (Änderung).
Sijainti
Dublin, Irland
Palvelujakso
24 Monate
Määräaika
20.08.2026 • 10:00
19
Päivää
Request for Tender for Architect Led Multi-Disciplinary Design and Cost Management Team for New Airfield Vehicle Entry Screening Post, Associated Infrastructure and Ancillary Works at Shannon Airport
●Shannon Airport Authority DAC
●Shannon Airport Authority DAC
Architectural and related services, engineering design, cost management for new airfield vehicle entry screening post, associated infrastructure and ancillary works at Shannon Airport.
Sijainti
Shannon, Ireland
Palvelujakso
28 Months
Määräaika
24.08.2026 • 11:00
23
Päivää
Air Handling Unit and Chiller Installation at Beaumont Hospital
●Beaumont Hospital_403
●Beaumont Hospital_403
Installation and commissioning of a new air handling unit and chiller within the Hospital's existing V6b plantroom and chiller compound. The appointed contractor will act as PSCS for the project.
Sijainti
Dublin, Ireland
Palvelujakso
24 Months
Määräaika
10.08.2026 • 10:00
9
Päivää
Liittyvät Tarjouspyynnöt alalla Rakentaminen
Löydä muita mahdollisuuksia samalta toimialalta