Löydä täydellinen sopimuksesi.

Hae tarjouskilpailuja yritysten kautta välittömästi

Asiantuntijahaku
HE

Heatmerchants

Vähittäiskauppa

Athlone, Co Westmeath, Irlanti
HeizungSanitärErneuerbare Energien

Vastaavat tarjouskilpailut

Multi-Party Framework Agreement for Energy Efficient Design Services as part of an Architect Led Design Team to deliver multiple Enabling Works Projects at University Hospital Galway

Health Service Executive (HSE)

Multi-Party Framework agreement for Energy Efficient Design (EED) on an established design team framework for services awarded on a cascade or mini competitions at sole discretion of the Client for Enabling Works projects an indicative value of typically €1.5m to €20m at University Hospital Galway and off campus.

EnergieeffizienzDesignArchitektur

Sijainti

Galway, Irland

Palvelujakso

4 Monate

Enimmäisarvo

15.000.000 €

Määräaika

21.08.202615:00

22

Päivää

Ballycoolin Bus Depot Design and Build

National Transport Authority_1149

Design and build of a bus depot facility for electric buses, including administrative offices, vehicle washing and cleaning building, maintenance bays, workshops, security facilities, vehicle inspection bays, electrical substation compound, transformer buildings, car parking facilities, cycle parking facilities, and all associated ancillary works.

Bus DepotConstructionDesign and Build

Sijainti

Dublin, Ireland

Palvelujakso

36 Months

Enimmäisarvo

80.000.000 €

Määräaika

28.08.202610:00

28

Päivää

TR5679 - Mechanical and Electrical Professional Services

Electricity Supply Board ( ESB )

Mechanical and Electrical Professional Services to support the delivery of capital and minor works projects in Dublin region in the Republic of Ireland.

Mechanical EngineeringElectrical EngineeringDesign Services

Sijainti

Dublin, Ireland

Palvelujakso

84 Months

Enimmäisarvo

1.200.000 €

Määräaika

24.08.202610:00

24

Päivää

HSE Estates SW: Regional Design Team Major Framework (€50M - €400M) 2025 for HSE South West Region

Health Service Executive (HSE)

Regionales Rahmenabkommen für HSE Design Team Services 2025 für Hauptkapitalmaßnahmen mit Projektwerten zwischen 50 Mio. und 400 Mio. EUR (exkl. MwSt.). Rahmen für Architektenleistungen (einschließlich Planer und BIM-Information Manager), Mengenverwalter, Gebäudeingenieur, Bauingenieur für zivil- und strukturelle Arbeiten, Brandschutzberater, Projektüberwachungs-Design-Prozess (PSDP), Auftraggebervertreter, energieeffizientes Design-Facilitator und Zuweisender Zertifikatgeber.

ArchitekturBauingenieurwesenRahmenabkommen

Sijainti

Irland

Palvelujakso

48 Monate

Enimmäisarvo

800.000.000 €

Määräaika

31.08.202610:00

31

Päivää

Celbridge Hazelhatch Mobility Corridor (Phase 5 to 7)

Kildare County Council_385

Detailed Design, Construction Administration and Project Handover of all scheme works, as approved or modified by An Coimisiún Pleanála. Approximately 2.0 km of new single carriageway mobility corridor extending from the R403 Clane Road to the R405 Hazelhatch Road, incorporating high quality active travel provision throughout. A new 66m long clear span bridge crossing of the River Liffey, designed in accordance with relevant Eurocodes and OPW requirements, with no in stream works required. Segregated footpaths and cycle facilities provided along the full length of the route, including: 2.0m wide one way cycle tracks and 2.0 m wide footpaths on both sides of the carriageway for the majority of the corridor; and a 3.0 m wide two way cycle track and footpath on constrained sections approaching Hazelhatch and Celbridge Train Station. New and upgraded junctions including signalised junctions at the R403 Clane Road, Newtown Road and R405 Hazelhatch Road, together with a priority junction at Simmonstown Manor Road and improvements to the Loughlinstown Road roundabout. Public lighting, drainage and SuDS infrastructure, including roadside drainage systems and attenuation features designed to limit discharge to greenfield run off rates and improve existing flood risk conditions. Landscaping, planting and biodiversity measures, including native species woodland and hedgerow planting, tree planting and integration of sustainable drainage features, delivering a net biodiversity gain along the corridor. Utility diversions, protections and accommodation works, including foul and surface water drainage infrastructure, watermains, ESB, Gas Networks and telecommunications assets, as required to facilitate delivery of the scheme. The Consultant shall undertake an Infrastructure Review in conjunction with Kildare County Council, relevant utility providers and other key stakeholders. All environmental mitigation, monitoring and reporting required under the Appropriate Assessment process, Natura Impact Statement, Flood Risk Assessment, and associated environmental and technical assessments accompanying the Section 177AE application.

Civil EngineeringHighways ConsultancyBridge Design

Sijainti

Ireland

Palvelujakso

39 Months

Enimmäisarvo

300.000 €

Määräaika

25.08.202614:00

26

Päivää

Piltown Town Centre Regeneration, Co. Kilkenny

Kilkenny County Council_1185

Provision of EV charging and Parking bays and urban renewal enhancement over c.340m of road corridor and 2 no. minor arm approaches. Includes drainage, paving, footpath construction, installation of street furniture, and electrical installation work for EV chargers.

ConstructionEV ChargingRoad Works

Sijainti

Kilkenny, Ireland

Palvelujakso

12 Months

Määräaika

01.09.202610:00

32

Päivää

TR5679 - Mechanical and Electrical Professional Services

Electricity Supply Board ( ESB )

Mechanical and Electrical Professional Services to support the delivery of capital and minor works projects in the Dublin Region.

Engineering designMechanical servicesElectrical services

Sijainti

Dublin, Ireland

Palvelujakso

7 Months

Enimmäisarvo

1.200.000 €

Määräaika

17.08.202610:00

17

Päivää

Bogganfin/Tuam Road Link Road, Monksland Strategic Road Project - Engineering Consultancy Service

Roscommon County Council_424

Engineering Consultancy Services for the delivery of Stages 1 to 4 of the Monksland Strategic Road Project linking the R362 to the N61 at Monksland, Co. Roscommon

EngineeringCivil EngineeringHighways

Sijainti

Roscommon, Ireland

Palvelujakso

3 Years

Määräaika

07.08.202614:00

8

Päivää

Architect or Engineer Led Integrated Multidisciplinary Design Team Consultancy services for the National Biorefinery Pilot Project (NBPP) Infrastructure Upgrade and Expansion Works

Tipperary County Council

The Project comprises the upgrade and expansion of the NBPP building, including all associated design, coordination, statutory approvals, and construction supervision services. The works will be carried out within an operational (live) facility and shall include the integration of new and existing building elements, services, and systems. The Consultant's Services shall address all relevant site constraints, including continuity of operations, health and safety requirements, phasing of works, and coordination with stakeholders. The scope includes multidisciplinary design services to deliver a compliant, functional, and cost-effective solution in accordance with the Client's requirements and applicable statutory standards.

Architectural DesignEngineering ConsultancyConstruction Supervision

Sijainti

Mid-West, Ireland

Palvelujakso

18 Months

Määräaika

20.08.202610:00

20

Päivää

Refurbishment of Science Classrooms and Preparation Room, Including Works to an Existing Classroom to Accommodate the New Science Classroom on the 2nd Floor at Scoil Mhuire, Buncrana

Scoil Mhuire (Buncrana)

Refurbishment of Science Classrooms and Preparation Room, Including Works to an Existing Classroom to Accommodate the New Science Classroom on the 2nd Floor at Scoil Mhuire, Buncrana. See cover letter for full description of works.

SchulbauSanierungWasserinstallation

Sijainti

Buncrana, Irland

Palvelujakso

2 Monate

Määräaika

31.07.202610:00

21

Tuntia

1 / 2