Löydä täydellinen sopimuksesi.

Hae tarjouskilpailuja yritysten kautta välittömästi

Asiantuntijahaku
HE

Head Energy AS

Energia, yleishyödylliset palvelut ja jätehuolto

Bergen, Vestland, Norja
energibygg & anleggkonsulenttjenester

Vastaavat tarjouskilpailut

Utgreiing buss eigenregi

Vestland fylkeskommune

The report shall give a verifiable decision basis for whether – and if so how – Vestland county can organize bus operations in-house for one limited contract area. The aim is to look at • Better resource utilization • More diversity in the business segment/better competition • Flexibility in investment and operation. The report should also highlight consequences for the county administration in its governance/administration and financial risk management for a model where in-house bus operations or a hybrid model (with public ownership of the buses and competitive tendering for operators) can run parallel to full contracting out in the other contract areas. The report shall give a verifiable decision basis considering a realistic time frame for political decisions and regime implementation (organization, recruitment and – if relevant – transfer of undertaking), before a conclusion is drawn about which contract area may be suitable and feasible as a pilot for in-house operations. The report is limited to bus operations. Boats, ferries and light rail are not to be considered. Contract areas/route packages in the geographical area of Vestland shall be considered as possible candidates, and the assignment shall be based on realistic timeframes for political decisions and implementation, so that recommended candidates have an operational feasibility within relevant contractual time windows. The assignment is divided into two phases: Phase 0 and Phase 1. Phase 0: Comprises two sub-deliveries (L0A and L0B) and a political steering point (SP0) inside the phase, where the contracting authority can adjust the scope and possibly limit additional work with alternative models to reduce complexity. The administration has estimated Phase 0 to be between 500 and 900 hours depending on data access, chosen case, and scope of organization and material management. Phase 1 is an option for the contracting authority. This phase covers more specifically defined additional deliverables and/or further analysis. The scope of a potential Phase 1 is estimated at just under 1,350 hours.

bussdriftkonsulenttjenesterforretningsanalyse

Sijainti

Vestland, Norge

Palvelujakso

1 Year

Enimmäisarvo

7.000.000 €

Määräaika

19.08.202608:00

16

Päivää

Procurement - Process support and system tool for the prevention and reduction of sick leave, 2026

Ålesund kommune

Process support and system tools for the prevention and reduction of sick leave, including a service framework agreement and SSA-L for system tools.

Sick leave preventionProcess supportSystem tools

Sijainti

Ålesund, Norge

Palvelujakso

2 Years

Enimmäisarvo

10.000.000 €

Määräaika

11.08.202608:00

8

Päivää

Framework agreement for consultancy services

Kvæfjord Kommune

General technical consulting within the disciplines: Construction, Electro, HVAC and sanitation. Assignments include internal technical consulting.

ByggIngeniørHVAC

Sijainti

Harstad, Norge

Palvelujakso

48 Months

Määräaika

17.08.202610:00

14

Päivää

Framework agreement for consultancy services

Kvæfjord Kommune

General technical consulting within the disciplines: Construction, Electro, HVAC and sanitation. Includes internal technical consulting.

ByggIngeniørHVAC

Sijainti

Harstad, Norge

Palvelujakso

48 Months

Enimmäisarvo

12.000.000 €

Määräaika

17.08.202610:00

14

Päivää

Liittyvät Tarjouspyynnöt alalla Energia, yleishyödylliset palvelut ja jätehuolto

Löydä muita mahdollisuuksia samalta toimialalta

Framework agreement for pressure testing, disinfection and neutralisation, etc. 2026

Sandvika, Norwegen

DruckprüfungDesinfektionWasserleitungen

Määräaika

21.08.2026

18

Päivää

Residue waste - transport and treatment from RfD ́s loading station.

Drammen, Norge

RestavfallTransportBehandling

Määräaika

08.09.2026

36

Päivää

100609 - Expansion tanks for district heating - Værnes

Værnes, Norge

district heatingexpansion tanksmobile stand-by

Määräaika

25.08.2026

22

Päivää

Procurement of a Framework Agreement for Aeronautical Chemicals

Norge

ChemicalsAeronauticalMaintenance

Määräaika

07.09.2026

35

Päivää

Procurement of a framework agreement for F-35 Turbine fuel

Norway

Aviation keroseneF-35 fuelTank delivery

Määräaika

10.08.2026

7

Päivää

Battery pack with operational services and market optimisation.

Kristiansand S, Norge

BatteriespeicherEnergiesystemMarktoptimierung

Määräaika

01.09.2026

29

Päivää

New competition, Winter maintenance, roads

Hamarøy, Norge

VintervedlikeholdRutevedlikeholdSnørydding

Määräaika

21.08.2026

18

Päivää