Löydä täydellinen sopimuksesi.

Hae tarjouskilpailuja yritysten kautta välittömästi

Asiantuntijahaku
21

21SPACES

Rakentaminen

Dublin, Leinster, Irlanti
Interior DesignArchitectureRetail Design

Vastaavat tarjouskilpailut

Emergency Works (Co. Wicklow Schools)

Kildare and Wicklow Education and Training Board

Architectural Consultancy Services projects comprising of * Improving Disability Access to the Main Entrance in Glenart College, Arklow, Co. Wicklow. * Roof repair works on the main school building and sports hall in Avondale Community College, Rathdrum, Co. Wicklow.

ArchitekturNotfallmaßnahmenSchulen

Sijainti

Dublin, Irland

Palvelujakso

18 Monate

Enimmäisarvo

85.000 €

Määräaika

23.08.202621:45

26

Päivää

Emergency Works (Co. Kildare Schools)

Kildare and Wicklow Education and Training Board

Architectural Consultancy Services for emergency works including: repair of defective render at Athy Community College, replacement and automation of doors at Ard Scoil Rath Iomghain, and roof repair works to prefabricated buildings and the PE hall at Ard Scoil Rath Iomghain.

Architectural servicesEmergency worksSchools

Sijainti

Ireland

Palvelujakso

18 Months

Enimmäisarvo

47.000 €

Määräaika

23.08.202621:45

26

Päivää

TR5679 - Mechanical and Electrical Professional Services

Electricity Supply Board ( ESB )

Mechanical and Electrical Professional Services to support the delivery of capital and minor works projects in Dublin region in the Republic of Ireland.

Mechanical EngineeringElectrical EngineeringDesign Services

Sijainti

Dublin, Ireland

Palvelujakso

84 Months

Enimmäisarvo

1.200.000 €

Määräaika

24.08.202610:00

26

Päivää

HSE Estates SW: Regional Design Team Major Framework (€50M - €400M) 2025 for HSE South West Region

Health Service Executive (HSE)

Regionales Rahmenabkommen für HSE Design Team Services 2025 für Hauptkapitalmaßnahmen mit Projektwerten zwischen 50 Mio. und 400 Mio. EUR (exkl. MwSt.). Rahmen für Architektenleistungen (einschließlich Planer und BIM-Information Manager), Mengenverwalter, Gebäudeingenieur, Bauingenieur für zivil- und strukturelle Arbeiten, Brandschutzberater, Projektüberwachungs-Design-Prozess (PSDP), Auftraggebervertreter, energieeffizientes Design-Facilitator und Zuweisender Zertifikatgeber.

ArchitekturBauingenieurwesenRahmenabkommen

Sijainti

Irland

Palvelujakso

48 Monate

Enimmäisarvo

800.000.000 €

Määräaika

31.08.202610:00

33

Päivää

Celbridge Hazelhatch Mobility Corridor (Phase 5 to 7)

Kildare County Council_385

Detailed Design, Construction Administration and Project Handover of all scheme works, as approved or modified by An Coimisiún Pleanála. Approximately 2.0 km of new single carriageway mobility corridor extending from the R403 Clane Road to the R405 Hazelhatch Road, incorporating high quality active travel provision throughout. A new 66m long clear span bridge crossing of the River Liffey, designed in accordance with relevant Eurocodes and OPW requirements, with no in stream works required. Segregated footpaths and cycle facilities provided along the full length of the route, including: 2.0m wide one way cycle tracks and 2.0 m wide footpaths on both sides of the carriageway for the majority of the corridor; and a 3.0 m wide two way cycle track and footpath on constrained sections approaching Hazelhatch and Celbridge Train Station. New and upgraded junctions including signalised junctions at the R403 Clane Road, Newtown Road and R405 Hazelhatch Road, together with a priority junction at Simmonstown Manor Road and improvements to the Loughlinstown Road roundabout. Public lighting, drainage and SuDS infrastructure, including roadside drainage systems and attenuation features designed to limit discharge to greenfield run off rates and improve existing flood risk conditions. Landscaping, planting and biodiversity measures, including native species woodland and hedgerow planting, tree planting and integration of sustainable drainage features, delivering a net biodiversity gain along the corridor. Utility diversions, protections and accommodation works, including foul and surface water drainage infrastructure, watermains, ESB, Gas Networks and telecommunications assets, as required to facilitate delivery of the scheme. The Consultant shall undertake an Infrastructure Review in conjunction with Kildare County Council, relevant utility providers and other key stakeholders. All environmental mitigation, monitoring and reporting required under the Appropriate Assessment process, Natura Impact Statement, Flood Risk Assessment, and associated environmental and technical assessments accompanying the Section 177AE application.

Civil EngineeringHighways ConsultancyBridge Design

Sijainti

Ireland

Palvelujakso

39 Months

Enimmäisarvo

300.000 €

Määräaika

25.08.202614:00

27

Päivää

TR5679 - Mechanical and Electrical Professional Services

Electricity Supply Board ( ESB )

Mechanical and Electrical Professional Services to support the delivery of capital and minor works projects in the Dublin Region.

Engineering designMechanical servicesElectrical services

Sijainti

Dublin, Ireland

Palvelujakso

7 Months

Enimmäisarvo

1.200.000 €

Määräaika

17.08.202610:00

19

Päivää

Bogganfin/Tuam Road Link Road, Monksland Strategic Road Project - Engineering Consultancy Service

Roscommon County Council_424

Engineering Consultancy Services for the delivery of Stages 1 to 4 of the Monksland Strategic Road Project linking the R362 to the N61 at Monksland, Co. Roscommon

EngineeringCivil EngineeringHighways

Sijainti

Roscommon, Ireland

Palvelujakso

3 Years

Määräaika

07.08.202614:00

9

Päivää

Architect or Engineer Led Integrated Multidisciplinary Design Team Consultancy services for the National Biorefinery Pilot Project (NBPP) Infrastructure Upgrade and Expansion Works

Tipperary County Council

The Project comprises the upgrade and expansion of the NBPP building, including all associated design, coordination, statutory approvals, and construction supervision services. The works will be carried out within an operational (live) facility and shall include the integration of new and existing building elements, services, and systems. The Consultant's Services shall address all relevant site constraints, including continuity of operations, health and safety requirements, phasing of works, and coordination with stakeholders. The scope includes multidisciplinary design services to deliver a compliant, functional, and cost-effective solution in accordance with the Client's requirements and applicable statutory standards.

Architectural DesignEngineering ConsultancyConstruction Supervision

Sijainti

Mid-West, Ireland

Palvelujakso

18 Months

Määräaika

20.08.202610:00

22

Päivää

Professional Services for the preparation of a Masterplan for Castletown Estate and Donaghcumper Estate and their historic landscapes

Office of Public Works (OPW)

Professionelle Dienstleistungen zur Erstellung eines Masterplans für Castletown House und Donaghcumper House sowie ihre historischen Landschaften durch ein interdisziplinäres Design-Team.

MasterplanLandschaftsarchitekturDesignberatung

Sijainti

Dublin, Irland

Palvelujakso

6 Monate

Määräaika

03.09.202610:00

36

Päivää

Development of a New NPWS Visitor Park Centre for The Burren National Park

Department of Housing Local Government and Heritage

Provision of Architect or Engineer led Design Team Consultancy Services for development at 1-2 Riverview, Church Street, Newtown, Corofin, Co Clare V95 ANP8. The development will consist of: The demolition of 1-2 Riverview buildings and associated outbuildings and boundary wall and the development of a single storey NPWS Visitor Centre for The Burren National Park, 3 storey NPWS office building, car parking facilities with associated vehicle access points and ramp and all associated site development, boundary and landscaping works.

ArchitekturBauentwurfPlanung

Sijainti

Corofin, Irland

Palvelujakso

50 Monate

Määräaika

21.08.202610:00

23

Päivää

1 / 3

Liittyvät Tarjouspyynnöt alalla Rakentaminen

Löydä muita mahdollisuuksia samalta toimialalta

Refurbishment and Extension of New Ross Library

Ireland

BauarbeitenSanierungErweiterung

Määräaika

17.08.2026

19

Päivää

Carrick on Shannon Parks Project (Transformation of 4 Urban Green Areas) in Carrick on Shannon, Co Leitrim

Carrick on Shannon, Irland

ArchitekturLandschaftsplanungStadtentwicklung

Määräaika

07.09.2026

40

Päivää

Integrated Design Team Services for New Municipal Cemetery at Letterkenny, County Donegal

Ireland

Architectural ServicesCemetery ConstructionDesign Team

Määräaika

23.08.2026

25

Päivää

Construction of extensions at Mooncoin Junior and Senior Schools Scoil Mhuire NS Mooncoin Co. Waterford

Mooncoin, Irland

SchulbauErweiterungBauarbeiten

Määräaika

21.08.2026

23

Päivää

St. Ciaran's Community School Kells

Kells, Irland

Elektrische InstallationNotbeleuchtungFeueralarm

Määräaika

13.08.2026

15

Päivää

Fit-Out, Landscaping and Equipment Supply

Inis Meáin, Irland

KüchengeräteLieferungGastronomie

Määräaika

21.08.2026

23

Päivää

TEN2600141 - CfT for Construction of 44 Units at Lios na Ri, Cootehill, Co. Cavan for Cavan County Council

Cavan, Irland

WohnbauMehrfamilienhausBauarbeiten

Määräaika

31.08.2026

33

Päivää

26-108 St. Mary's Primary School Dungarvan - Climate Action and Fabric Defects Works

Dungarvan, Ireland

BauarbeitenSanierungDämmung

Määräaika

12.08.2026

14

Päivää

Refurbishments and Extension at Cape Clear Heritage Centre at Oileán Chléire, Co. Corcaigh

Cape Clear, Ireland

RefurbishmentExtensionConstruction

Määräaika

28.08.2026

30

Päivää

Cassan Sound Pier/Breakwater Structural Repairs 2026 - Donegal County Council

Ireland

Pier constructionStructural repairsConcrete works

Määräaika

14.08.2026

16

Päivää

Employers representative, technical advisory and assigned certifier services for the Project Barrow Social Housing Design and Build Contract

Dublin, Irland

ArchitekturBauberatungÜberwachung

Määräaika

27.08.2026

29

Päivää

9840 Design and Build Enabling Works at the DART+ and MetroLink Interface at Glasnevin

Dublin, Ireland

ConstructionRailwayDesign and Build

Määräaika

25.08.2026

27

Päivää

Deer fencing of 1.7 Ha yew woodland, Killarney National Park.

Killarney, Irland

ZaunbauEibenwaldNaturschutz

Määräaika

12.08.2026

14

Päivää

DCC - Home Building Programme Contractor Multi Party Framework Agreement in 2 Lots A and B

Dublin, Ireland

Housing ConstructionDesign and BuildMulti-dwelling

Määräaika

26.08.2026

28

Päivää

Provision of Ground Investigation Services for Silvermines Hydro (2026)

Irland

GeotechnikBodenuntersuchungBohrarbeiten

Määräaika

17.08.2026

19

Päivää