Leidke endale ideaalne hange.
Otsi ettevõtteid või hankeid.
vc computers
Tootmine
vc computers tegutseb valdkonnas Tootmine.
Hanked valdkonnas Tootmine
Valdkonna vasted
Need hanked on sobitatud ettevõtte valdkonna ja riigi alusel. Aktiivse FREE kontoga kasutajad saavad selle ettevõtte endale nõuda ja puuduvad andmed lisada, et leida täpsemaid vasteid. Vaata pakettide üksikasju
Technical Consultancy services for the Kilkenny City Centre Vibrant Streets West
●Kilkenny County Council_1185
●Kilkenny County Council_1185
Provide a multidisciplinary consultancy team to progress preliminary and detailed design, statutory planning, enabling works and procurement, construction, and handover for the scheme. Fulfil the PSDP role and procure specialist services needed to complete the project.
Asukoht
Kilkenny, Ireland
Teenuse Periood
44 months
Lepingu maksumus
5 000 000 €
Tähtaeg
24.11.2026 • 12:00
1
Tund
Circle Heating Tender 2026
●Circle Voluntary Housing Association
●Circle Voluntary Housing Association
Provide annual servicing, responsive maintenance and replacements for gas, oil and heat-pump heating systems across Circle’s assets throughout Ireland.
Asukoht
Ireland
Teenuse Periood
5 years
Lepingu maksumus
1 100 000 €
Tähtaeg
02.12.2026 • 12:00
8
Päeva
●Dublin City Council
Deliver roadworks, public realm improvements, cycle track works and other engineering works in live city and suburban environments. Individual contracts may use PW-CF3 or PW-CF5 forms.
Asukoht
Dublin, Ireland
Teenuse Periood
48 months
Lepingu maksumus
150 000 000 €
Tähtaeg
25.11.2026 • 12:00
1
Päev
ET2607 - Provision of an Interactive and Connected Breathalyser Terminal Service
●Road Safety Authority (RSA)
●Road Safety Authority (RSA)
Provide an interactive, connected breathalyser terminal service for the Road Safety Authority, as detailed in the tender requirements.
Asukoht
Ireland
Teenuse Periood
84 months
Lepingu maksumus
1 500 000 €
Tähtaeg
04.12.2026 • 10:00
9
Päeva
●Bus Eireann/Irish Bus
Supply, Installation and Annual Maintenance of EV Chargers for Buses. Turnkey solution for the supply and installation of electric vehicle charging infrastructure including complete project management, electrical and civil works, transformers, chargers and charging points, back-office support protocols and training of relevant Bus Éireann staff. Provision of suitable energy storage systems or other sustainable backup systems. Services provided on a novated basis to a lead contractor for larger depot construction projects. Compliance with all relevant Irish and European statutory regulations and international standards. Charging protocols: 150kW IEC 61851 Mode 4 DC (CCS 2.0 Combo 2), 3 phase DC EV Charger 120kW-180kW (CCS 2.0 Combo 2), 3 phase DC EV Charger 30kW-60kW (CCS 2.0 Combo 2), 3 phase AC EV Charger 22kW (IEC 61851 Mode 3), 1 phase AC EV Charger 22kW (IEC 61851 Mode 3), 1 phase AC EV Charger 7kW (IEC 61851 Mode 3).
Asukoht
Dublin, Ireland
Teenuse Periood
not less than 5 years
Tähtaeg
29.08.2027 • 15:00
278
Päeva
HSE 21101 Dynamic Purchasing System (DPS) Invitation for Enteral Nutrition Products and Related Devices
●Health Service Executive (HSE)
●Health Service Executive (HSE)
Supply of Enteral Nutrition Products and Related Devices, including pumps, nutritional pumps, special nutritional products, medical consumables, administration sets, and miscellaneous medical devices and products.
Asukoht
Dublin, Ireland
Teenuse Periood
02/09/2026 – 02/09/2033
Lepingu maksumus
210 000 000 €
Tähtaeg
02.09.2033 • 15:00
2474
Päeva
●Gas Networks Ireland
Engineering, procurement, and construction works and services to complete infrastructure assets, including but not limited to: marine jetty structure, marine piling, floating pontoon, mooring & breasting dolphins, fender, trestle, HP gas unloading systems, on-shore gas receiving facility, utility systems, metering, odourisation, venting, pipeline and pig traps, high pressure gas grid connection, connection to existing natural gas network, utility connections for power, water and telecom, integration with FSRU, onshore terminal systems, pre commissioning and commissioning services, and management of nominated subcontractor(s).
Asukoht
Ireland
Teenuse Periood
28.07.2026 - 27.07.2036
Tähtaeg
25.07.2036 • 12:00
3531
Päeva
●Bus Eireann/Irish Bus
Anschaffung von emissionsarmen Coaches und Schulbussen sowie, wo möglich, emissionsfreien Coaches mit geringem Umweltausdruck im Einklang mit der neuesten EURO VI-Verordnung. Die Fahrzeuge müssen die Leitlinien der EPA für Straßenverkehrsfahrzeuge und die europäischen Gemeinschaftsbestimmungen über saubere und energieeffiziente Straßenverkehrsfahrzeuge einhalten.
Asukoht
Dublin, Irland
Teenuse Periood
60 Monate
Lepingu maksumus
720 000 000 €
Tähtaeg
31.03.2033 • 12:00
2319
Päeva
Dynamic Purchasing System (DPS) for Course Consumables for use in Donegal Education and Training Board Training Centres and Schools
●Donegal Education and Training Board_368
●Donegal Education and Training Board_368
Dynamic Purchasing System (DPS) for Course Consumables for use in Training Centres and Schools
Asukoht
Ireland
Teenuse Periood
26.06.2026 - 26.06.2031
Lepingu maksumus
10 000 000 €
Tähtaeg
26.06.2031 • 14:00
1675
Päeva
25/061 - Qualification System for Boiler Package Units
●Gas Networks Ireland
●Gas Networks Ireland
Design, Herstellung, Montage, Lieferung und Inbetriebnahme kompletter Paketkesselanlagen (PBU) mit natürlichen Gas-betriebenen Kesseln, natürlichen Gas-betriebenen Generatoren, zugehörigen LPHW-Systemen, Steuerungs- und Automatisierungssystemen, Instrumentierung, Dokumentation, FAT/SAT sowie Inbetriebnahmesupport. Dazu gehört der Kauf von Wärmeübertragern als Teil eines integrierten natürlichen Gas-Vorwärmesystems. GNI kann alle oder Teile der PBU und Wärmeübertrager beschaffen. Während des Rahmenzeitraums können zusätzliche Dienstleistungen, Arbeiten und Lieferungen erforderlich sein, z. B. die Bereitstellung von Kesseln und allen Nebenanlagen zur sicheren und effizienten Betriebsführung der PBU. GNI behält sich das Recht vor, Prüfungen (einschließlich Lieferantenqualitätsprüfungen) durchzuführen.
Asukoht
Irland
Teenuse Periood
120 Monate
Tähtaeg
15.05.2036 • 12:00
3460
Päeva
Seotud Hanked valdkonnas Tootmine
Avastage teisi võimalusi samas sektoris