Leidke oma ideaalne leping.

Otsige hankeid ettevõtete kaudu koheselt

Ekspertotsing
TR

Tritech Engineering

Ehitus

Tallaght, County Dublin, Iirimaa

Sobivad hanked

Ballycoolin Bus Depot Design and Build

National Transport Authority_1149

Design and build of a bus depot facility for electric buses, including administrative offices, vehicle washing and cleaning building, maintenance bays, workshops, security facilities, vehicle inspection bays, electrical substation compound, transformer buildings, car parking facilities, cycle parking facilities, and all associated ancillary works.

Bus DepotConstructionDesign and Build

Asukoht

Dublin, Ireland

Teenuse Periood

36 Months

Maksimaalne Väärtus

80.000.000 €

Tähtaeg

28.08.202610:00

30

Päeva

DCC - Home Building Programme Contractor Multi Party Framework Agreement in 2 Lots A and B

Dublin City Council

Delivery of a significant programme of housing projects (social and affordable housing) utilising primarily the Design and Build (DB) delivery model. Includes building construction, multi-dwelling buildings, electrical installation, mechanical installations, and development of residential real estate.

Housing ConstructionDesign and BuildSocial Housing

Asukoht

Dublin, Ireland

Teenuse Periood

48 Months

Maksimaalne Väärtus

1.750.000.000 €

Tähtaeg

26.08.202610:00

28

Päeva

9840 Design and Build Enabling Works at the DART+ and MetroLink Interface at Glasnevin

Iarnród Eireann-Irish Rail

Design and Build of Enabling Works at the DART+ and MetroLink Interface at Glasnevin, Dublin, to facilitate the construction of MetroLink. Includes detailed design and construction of key enabling works such as site preparation, demolition, excavation, earthmoving, drainage, railway construction works, and associated civil engineering tasks.

ConstructionRailwayDesign and Build

Asukoht

Dublin, Ireland

Teenuse Periood

5 Years

Maksimaalne Väärtus

200.000.000 €

Tähtaeg

25.08.202610:00

27

Päeva

Fit-Out, Landscaping and Equipment Supply

Seán Ó Domhnaill

Supply and delivery of commercial large kitchen appliances for a new café development. Installation excluded.

KüchengeräteLieferungGastronomie

Asukoht

Inis Meáin, Irland

Teenuse Periood

12 Months

Tähtaeg

21.08.202610:00

23

Päeva

Piltown Town Centre Regeneration, Co. Kilkenny

Kilkenny County Council_1185

Provision of EV charging and Parking bays and urban renewal enhancement over c.340m of road corridor and 2 no. minor arm approaches. Includes drainage, paving, footpath construction, installation of street furniture, and electrical installation work for EV chargers.

ConstructionEV ChargingRoad Works

Asukoht

Kilkenny, Ireland

Teenuse Periood

12 Months

Tähtaeg

01.09.202610:00

34

Päeva

Connolly Dry Canteen DFTC Curragh Camp

Irish Defence Forces_1144

Bauarbeiten am Connolly Dry Canteen, DFTC, Curragh, Co. Kildare. Bezugnahme auf die mechanischen und elektrischen Zeichnungen gemäß dieser Spezifikation. Hauptklassifikation: Bauarbeiten (CPV 45000000), Gebäudebau (45210000), Fenster, Türen und verwandte Artikel (44221000), Sanierungsarbeiten (45453100), Elektrische Installationen (45310000), Mechanische Installationen (45350000).

BauarbeitenSanierungElektrische Installationen

Asukoht

Kildare, Irland

Teenuse Periood

6 Monate

Maksimaalne Väärtus

600.000 €

Tähtaeg

11.08.202610:00

13

Päeva

Conference Room Plunkett Mess DFTC Curragh Camp

Irish Defence Forces_1144

Bauarbeiten im Conference Room Plunkett Mess, DFTC Curragh Camp, Co. Kildare. Dazu gehören: 45210000 Baubauarbeiten, 44221000 Fenster, Türen und verwandte Artikel, 45442100 Malerarbeiten, 45453100 Sanierungsarbeiten, 45310000 Elektroinstallationen, 45350000 Mechanische Installationen.

BauarbeitenSanierungElektroinstallation

Asukoht

Ireland

Teenuse Periood

6 Months

Tähtaeg

10.08.202610:00

12

Päeva

Extension to Bohermore National School, Ballysimon, Co. Limerick

Bohermore National School

Bauarbeiten für den Anbau eines Eingangsportikus und -überdachung an der Vorderseite des bestehenden Schulgebäudes, den Anbau eines Erdgeschoss-Erweiterungsbereichs an der Seite und Rückseite bestehend aus 1 Klassenzimmer mit zugehörigem Ruheraum, Toilette und Duscheinrichtung, und 1 zentralen Aktivitätsbereich mit 1 Bereich für tägliche Lebensfähigkeiten sowie zugehöriger Nebenanlagen, externe und interne Änderungen am bestehenden Schulgebäude, Änderungen an den bestehenden Fassaden sowie Nebenanlagenarbeiten auf der Baustelle.

SchulbauErweiterungBauarbeiten

Asukoht

Ballysimon, Irland

Teenuse Periood

11 Monate

Maksimaalne Väärtus

1.400.000 €

Tähtaeg

14.08.202610:00

16

Päeva

Construction of an extension to existing childcare service- a 208 square meter single storey build to the south of existing childcare centre

Cherry Orchard Community Childcare CLG

Construction of a 208 square meter single storey extension to the south of an existing childcare centre, comprising two classrooms and associated service spaces including adjoining sleep rooms, changing rooms, a plant room and a therapy room including all necessary external works.

BauarbeitenKindergartenErweiterung

Asukoht

Dublin, Irland

Teenuse Periood

10 Months

Tähtaeg

28.08.202610:00

30

Päeva

Intelligent Transport Systems Equipment Frameworks Generation 2

Transport Infrastructure Ireland (TII)

Procurement of ITS equipment, installation services and associated civil works required to maintain, renew and expand the network of roadside Intelligent Transport Systems (ITS) equipment.

Intelligent Transport SystemsRoadside EquipmentInstallation Services

Asukoht

Dublin, Ireland

Teenuse Periood

4 Years

Maksimaalne Väärtus

48.000.000 €

Tähtaeg

21.08.202610:00

23

Päeva

1 / 2

Seotud Hanked valdkonnas Ehitus

Avastage teisi võimalusi samas sektoris

Design, Construction and Delivery of Cherry Orchard (Affordable for Sale) Housing Development (Pro405)

Dublin, Irland

BauWohnungsbauNeubau

Tähtaeg

25.08.2026

27

Päeva

Construction of SEN Extension to Clarecastle National School

Clarecastle, Irland

SchulbauSEN-ErweiterungNeubau

Tähtaeg

28.08.2026

30

Päeva

Emergency Works (Co. Wicklow Schools)

Dublin, Irland

ArchitekturNotfallmaßnahmenSchulen

Tähtaeg

23.08.2026

25

Päeva

Emergency Works (Co. Kildare Schools)

Ireland

Architectural servicesEmergency worksSchools

Tähtaeg

23.08.2026

25

Päeva

Carrick on Shannon Parks Project (Transformation of 4 Urban Green Areas) in Carrick on Shannon, Co Leitrim

Carrick on Shannon, Irland

ArchitekturLandschaftsplanungStadtentwicklung

Tähtaeg

07.09.2026

40

Päeva

Integrated Design Team Services for New Municipal Cemetery at Letterkenny, County Donegal

Ireland

Architectural ServicesCemetery ConstructionDesign Team

Tähtaeg

23.08.2026

25

Päeva

Construction of extensions at Mooncoin Junior and Senior Schools Scoil Mhuire NS Mooncoin Co. Waterford

Mooncoin, Irland

SchulbauErweiterungBauarbeiten

Tähtaeg

21.08.2026

23

Päeva

St. Ciaran's Community School Kells

Kells, Irland

Elektrische InstallationNotbeleuchtungFeueralarm

Tähtaeg

13.08.2026

15

Päeva

Refurbishment and Extension of New Ross Library

Ireland

BauarbeitenSanierungErweiterung

Tähtaeg

17.08.2026

19

Päeva

Cassan Sound Pier/Breakwater Structural Repairs 2026 - Donegal County Council

Ireland

Pier constructionStructural repairsConcrete works

Tähtaeg

14.08.2026

16

Päeva

26-108 St. Mary's Primary School Dungarvan - Climate Action and Fabric Defects Works

Dungarvan, Ireland

BauarbeitenSanierungDämmung

Tähtaeg

12.08.2026

14

Päeva

TEN2600141 - CfT for Construction of 44 Units at Lios na Ri, Cootehill, Co. Cavan for Cavan County Council

Cavan, Irland

WohnbauMehrfamilienhausBauarbeiten

Tähtaeg

31.08.2026

33

Päeva

Refurbishments and Extension at Cape Clear Heritage Centre at Oileán Chléire, Co. Corcaigh

Cape Clear, Ireland

RefurbishmentExtensionConstruction

Tähtaeg

28.08.2026

30

Päeva

Deer fencing of 1.7 Ha yew woodland, Killarney National Park.

Killarney, Irland

ZaunbauEibenwaldNaturschutz

Tähtaeg

12.08.2026

14

Päeva

Employers representative, technical advisory and assigned certifier services for the Project Barrow Social Housing Design and Build Contract

Dublin, Irland

ArchitekturBauberatungÜberwachung

Tähtaeg

27.08.2026

29

Päeva