Leidke oma ideaalne leping.

Otsige hankeid ettevõtete kaudu koheselt

Ekspertotsing
TA

TASK PLAN DEVELOPMENT LTD

Ehitus

Iirimaa

TASK PLAN DEVELOPMENT LTD tegutseb valdkonnas Ehitus.

Hanked valdkonnas Ehitus

Valdkonna vasted

Need hanked on sobitatud ettevõtte valdkonna ja riigi alusel. Premium-kasutajad saavad selle ettevõtte endale nõuda ja puuduvad andmed lisada, et leida täpsemaid vasteid. See plan details

●Donegal Education and Training Board_368

Dynamic Purchasing System (DPS) for Course Consumables for use in Training Centres and Schools

SteelPipingSupplies

Asukoht

Ireland

Teenuse Periood

26.06.2026 - 26.06.2031

Lepingu maksumus

10 000 000 €

Tähtaeg

26.06.2031 • 14:00

1704

Päeva

●Gas Networks Ireland

Design, Herstellung, Montage, Lieferung und Inbetriebnahme kompletter Paketkesselanlagen (PBU) mit natürlichen Gas-betriebenen Kesseln, natürlichen Gas-betriebenen Generatoren, zugehörigen LPHW-Systemen, Steuerungs- und Automatisierungssystemen, Instrumentierung, Dokumentation, FAT/SAT sowie Inbetriebnahmesupport. Dazu gehört der Kauf von Wärmeübertragern als Teil eines integrierten natürlichen Gas-Vorwärmesystems. GNI kann alle oder Teile der PBU und Wärmeübertrager beschaffen. Während des Rahmenzeitraums können zusätzliche Dienstleistungen, Arbeiten und Lieferungen erforderlich sein, z. B. die Bereitstellung von Kesseln und allen Nebenanlagen zur sicheren und effizienten Betriebsführung der PBU. GNI behält sich das Recht vor, Prüfungen (einschließlich Lieferantenqualitätsprüfungen) durchzuführen.

KesselanlagenGasnetzQualifikationssystem

Asukoht

Irland

Teenuse Periood

120 Monate

Tähtaeg

15.05.2036 • 12:00

3488

Päeva

●Iarnród Eireann-Irish Rail

Provision of strategic/expert advisory services, professional services secondments, project management deliverables, planning advice, alternative design options, and other consultancy services across multiple fields including architectural, engineering, environmental, financial, HR, and safety consultancy.

ArchitekturIngenieurwesenBeratung

Asukoht

Irland

Teenuse Periood

02.03.2026 - 03.03.2031

Tähtaeg

01.03.2031 • 12:00

1586

Päeva

Supply of, Repair and Maintenance for Body Parts; Supply of Parts, Repair and Maintenance of Chassis; Supply of Parts, Repair and Maintenance of Body Panels and Structure; Supply of Parts, Repair and Maintenance of Glazing; Supply of Parts, Repair and Maintenance of Heating, Ventilation and Air Conditioning Systems; Supply of, Repair and Maintenance of Hoses and Pipes; Supply of, Repair and Maintenance of Exterior and Interior Fittings; Supply of, Repair and Maintenance of Ancillary Onboard equipment; Supply of Wheel Rims; Supply of Parts, Repairs and Maintenance of Braking Systems; Supply of Suspension and Steering Systems; Supply of, Repair and Maintenance for General Driveline Systems; Supply of Filters; Supply of, Repair and Maintenance of Electrical and Electronic Components.

Spare PartsBus FleetQualification Panel

Asukoht

Dublin, Ireland

Teenuse Periood

60 Months

Tähtaeg

30.04.2033 • 12:00

2377

Päeva

●Technological University Dublin (TU Dublin)

Lieferung von elektrischen Geräten für Lehrzwecke, insbesondere Prüf- und Messgeräte (Oszilloskope, Generatoren, Aufnahmen, Transformatoren).

PrüfgeräteMessgeräteLehrzwecke

Asukoht

Dublin, Irland

Teenuse Periood

07.05.2026 bis 07.05.2031

Lepingu maksumus

8 000 000 €

Tähtaeg

07.05.2031 • 14:00

1654

Päeva

●Iarnród Eireann-Irish Rail

Multi-party Qualification System for Civil Engineering Works associated with the upgrading of the railway infrastructure and other related works. Examples include maintenance of over/underbridges, construction of new railway underbridges or overbridges, alterations to existing structures, coastal defence works, waterproofing, construction of footbridges, car parks, bridge widening/replacement, embankment/cutting works, construction of roads, earthworks, drainage, demolition of railway structures, foundation works, ground engineering, and associated temporary works.

Civil EngineeringRailway InfrastructureConstruction Works

Asukoht

Dublin, Ireland

Teenuse Periood

19.08.2026 - 19.04.2031

Tähtaeg

19.08.2031 • 12:00

1757

Päeva

Herstellung und Lieferung von Polyethylen-Rohr für Gas mit einem Durchmesser von 90mm bis 400mm.

PolyethylenGasleitungenRohrherstellung

Asukoht

Irland

Teenuse Periood

120 Monate

Tähtaeg

09.04.2036 • 12:00

3452

Päeva

●Iarnród Eireann-Irish Rail

IÉ invites applications to participate in the pre-qualification process to appoint suitably qualified companies to a qualification system for Bridge and Riverbed Inspection Services that may arise on an ad-hoc basis. Those companies successfully appointed to the Qualification System will receive all future tender enquiries. Iarnród Éireann has over 450 bridges (structures greater than 2m) over water. All these bridges and riverbeds require periodic inspections. Some inspections are carried out yearly, other are every 3 years and more are on a 6 yearly cycle. Iarnród Éireann is looking to appoint specialist expertise to undertake inspection of railway bridges that traverse water courses as well as carry out bridge and river surveys. The applicants are to provide expertise in the following areas: • Provide Health and Safety and Risk Assessment plans for the specific work • Provide qualified divers/surveyors for a bridge and riverbed inspections/surveys • Record the topography using surveying techniques • Using the previous base line surveys (supplied by IÉ) identify changes in the structure and/or the river channel. • Provide factual report on findings. • Provide for Engineers review (review undertaken by a Chartered Civil Engineer) of the factual report before the reports are issued to Irish Rail. The Qualification System is also to include for inspection of any structure following a major flood event. In the period after a flood event, structures throughout the IÉ network may need to be inspected to determine the extent, if any, of damage caused by the event.

Bridge InspectionRiverbed InspectionSurveying Services

Asukoht

Ireland

Teenuse Periood

Unknown

Tähtaeg

07.05.2030 • 12:00

1288

Päeva

●Gas Networks Ireland

• Sub-duct insertion into abandoned cast-iron gas mains • Duct and sub-duct supply, installation, proving, and testing • Telecom duct network maintenance and emergency maintenance works • Standby and emergency cover • Reinstatement and service works • Traffic management • Supply of prefabricated chambers, frames, and covers • Sub-duct installation • Duct testing and commissioning • Cable installation • Provision of as-built information • Provision of resources • Attainment of required permits and consents

TelekommunikationBauarbeitenWartung

Asukoht

Irland

Teenuse Periood

120 Monate

Tähtaeg

17.03.2036 • 12:00

3429

Päeva

Panel for the provision of Painting Services for WWETB Schools and Centre - 2.

●Waterford and Wexford Education and Training Board_110494

The Contracting Authority proposes to engage in a competitive process for the establishment of a panel from which it will source service providers for the provision of internal and external painting services. Note: Training Centre locations are not part of this panel application process. The initial panel listing from this competition will be complete by 31st April 2027 however, applications will be received during the timelines outlined within the document for the duration of the panel.

paintingrepaintinginternal painting

Asukoht

Dublin, Ireland

Teenuse Periood

36 Months

Lepingu maksumus

50 000 €

Tähtaeg

31.03.2027 • 00:00

155

Päeva

Seotud Hanked valdkonnas Ehitus

Avastage teisi võimalusi samas sektoris

Maintenance Dredging Contract

Southeast Ireland, Ireland

maintenance dredgingnavigational channelturning circle

Tähtaeg

23.11.2026

27

Päeva

Proposed Community Development, Kildimo, Co. Limerick

Kildimo, County Limerick, Ireland

Tähtaeg

13.11.2026

17

Päeva

Sallins Park and Amenity Lands Development

Sallins, County Kildare, Ireland

Tähtaeg

25.11.2026

29

Päeva

Circle Heating Tender 2026

Ireland

Tähtaeg

02.12.2026

36

Päeva

0060 - Major Construction/Works Qualification System

Republic of Ireland

Major constructionRefurbishmentExtensions

Tähtaeg

01.01.2037

3719

Päeva

Ballyhaunis Library and Community Hub Project

Ballyhaunis, County Mayo, Ireland

Tähtaeg

11.12.2026

46

Päeva

WCCC26 543 Refurbishment of 3 and 4 Georges Street Waterford

Waterford City, Ireland

Tähtaeg

23.11.2026

28

Päeva

Prior Information Notice Electrical Installation upgrade at Booterstown NS

Booterstown, Dublin, Ireland

Tähtaeg

02.11.2026

6

Päeva

R232 Glenmore Bridge Widening and Road Realignment Scheme

Glenmore, County Donegal, Ireland

Tähtaeg

20.11.2026

25

Päeva