Leidke oma ideaalne leping.

Otsi ettevõtteid või hankeid.

Ekspertotsing
PL

Plumbtech Ltd

Ehitus

Midleton, County Cork, Iirimaa

Plumbtech Ltd tegutseb valdkonnas Ehitus. Asukoht: Midleton, County Cork.

Hanked valdkonnas Ehitus

Valdkonna vasted

Need hanked on sobitatud ettevõtte valdkonna ja riigi alusel. Aktiivse FREE kontoga kasutajad saavad selle ettevõtte endale nõuda ja puuduvad andmed lisada, et leida täpsemaid vasteid. Vaata pakettide üksikasju

●GREYSTEEL COMMUNITY ENTERPRISES LTD

Deliver a sports dome with a 3G playing surface and associated works in Greysteel. Refurbish an existing building in Creeslough, County Donegal, to provide community facilities.

Asukoht

Greysteel, County Derry, Ireland; Creeslough, County Donegal, Ireland

Teenuse Periood

15.12.2026 - 30.06.2029

Lepingu maksumus

275 000 £

Tähtaeg

20.11.2026 • 12:00

1

Päev

●The Alzheimer Society of Ireland

Undertake comprehensive valuations of ASI’s 14 properties across Ireland, including rebuilding and reinstatement costs for insurance. Provide valuation advice for financial reporting, identify impairment indicators, and establish a consistent portfolio valuation framework.

Asukoht

Republic of Ireland

Teenuse Periood

5 years

Lepingu maksumus

35 000 €

Tähtaeg

25.11.2026 • 12:00

6

Päeva

●An Post_391

Supply, installation and commissioning of solar photovoltaic systems at An Post properties throughout the Republic of Ireland, with maintenance during the applicable warranty period. The system may also be used for later call-offs for support, maintenance and/or ongoing enhancements, without guaranteed volume.

Solar PV systemssolar panelsinstallation

Asukoht

Republic of Ireland

Teenuse Periood

04.11.2026 -; 10 years; An Post reserves the right to extend or close the panel early in line with Operational Requirements; maintenance during the applicable warranty period

Tähtaeg

30.11.2031 • 23:59

1837

Päeva

●Iarnród Eireann-Irish Rail

Design and Build Contractor to complete the design and deliver capacity enhancement and transformation works at Connolly Station. The project will create a new entrance from Preston Street and a passenger concourse within the historic Victorian undercroft, together with new lifts, escalators and staircases providing improved access to Platforms 5, 6 and 7. The works will also include additional emergency escape routes, public-realm improvements, retail, operational and back-of-house spaces, heritage refurbishment, structural alterations and the installation or modification of station and railway systems. The successful Contractor will be required to review and develop the reference design through detailed design to Approved for Construction status and subsequently construct, test and commission the works. The Contractor will also be responsible for providing complete as-built and handover information. The project will be delivered within a constrained, live operational railway environment. The Contractor will be required to manage passenger circulation, railway access, construction phasing, safety assurance, stakeholder engagement, heritage requirements and interfaces with other DART+ contracts. The appointed Contractor will undertake the role of Project Supervisor for the Construction Stage.

ConstructionRailway StationDesign and Build

Asukoht

Dublin, Ireland

Teenuse Periood

42 Months

Lepingu maksumus

34 000 000 €

Tähtaeg

20.11.2026 • 12:00

1

Päev

Garden Design for Knockreer Gardens Killarney National Park

●Department of Housing Local Government and Heritage

Tenders are being sought for the preparation of a Conservation Design and Development Plan (CDDP) focused on the long-term practice of conservation horticulture at Knockreer House Gardens. The CDDP will be guided by best international practice in conservation design and interpretation.

landscape architectureconservation designhorticulture

Asukoht

Wexford, Ireland

Teenuse Periood

12 Months

Lepingu maksumus

70 000 €

Tähtaeg

27.01.2027 • 15:00

69

Päeva

Supply, Installation and Annual Maintenance of EV Chargers for Buses. Turnkey solution for the supply and installation of electric vehicle charging infrastructure including complete project management, electrical and civil works, transformers, chargers and charging points, back-office support protocols and training of relevant Bus Éireann staff. Provision of suitable energy storage systems or other sustainable backup systems. Services provided on a novated basis to a lead contractor for larger depot construction projects. Compliance with all relevant Irish and European statutory regulations and international standards. Charging protocols: 150kW IEC 61851 Mode 4 DC (CCS 2.0 Combo 2), 3 phase DC EV Charger 120kW-180kW (CCS 2.0 Combo 2), 3 phase DC EV Charger 30kW-60kW (CCS 2.0 Combo 2), 3 phase AC EV Charger 22kW (IEC 61851 Mode 3), 1 phase AC EV Charger 22kW (IEC 61851 Mode 3), 1 phase AC EV Charger 7kW (IEC 61851 Mode 3).

Electric Vehicle ChargersInstallationCommissioning

Asukoht

Dublin, Ireland

Teenuse Periood

not less than 5 years

Tähtaeg

29.08.2027 • 15:00

283

Päeva

●Gas Networks Ireland

Commercial advisory services for the procurement and contract management of Liquefied Natural Gas (LNG) and other gas commodities.

LNGProcurementContract Management

Asukoht

Ireland

Teenuse Periood

180 Days

Tähtaeg

05.05.2036 • 12:00

3455

Päeva

Engineering, procurement, and construction works and services to complete infrastructure assets, including but not limited to: marine jetty structure, marine piling, floating pontoon, mooring & breasting dolphins, fender, trestle, HP gas unloading systems, on-shore gas receiving facility, utility systems, metering, odourisation, venting, pipeline and pig traps, high pressure gas grid connection, connection to existing natural gas network, utility connections for power, water and telecom, integration with FSRU, onshore terminal systems, pre commissioning and commissioning services, and management of nominated subcontractor(s).

Marine constructionGas infrastructureEPC works

Asukoht

Ireland

Teenuse Periood

28.07.2026 - 27.07.2036

Tähtaeg

25.07.2036 • 12:00

3536

Päeva

9884 Qualification System for Surveys

●Iarnród Eireann-Irish Rail

Vergabe eines Qualifikationssystems (QS) für intrusive Untersuchungsleistungen zur Überwachung der Eisenbahninfrastruktur, Küstengebiete und Gebäudeanlagen von Iarnród Éireann.

Intrusive SurveysEisenbahninfrastrukturBodenuntersuchung

Asukoht

Irland

Teenuse Periood

7 Jahre

Tähtaeg

21.08.2033 • 12:00

2467

Päeva

●Iarnród Eireann-Irish Rail

Qualifikationssystem für Baumfällung und Vegetationsbeseitigung, einschließlich planmäßiger Arbeiten (Baumpflege) und Notfallarbeiten bei sicherheitskritischen Situationen. Ancilläre Dienstleistungen können erforderlich sein.

BaumfällungVegetationsbeseitigungQualifikationssystem

Asukoht

Irland

Teenuse Periood

8 Jahre

Tähtaeg

04.09.2031 • 12:00

1750

Päeva

Seotud Hanked valdkonnas Ehitus

Avastage teisi võimalusi samas sektoris

Renovation and conversion of a commercial unit at No.62 Barrack Street, Castlecomer

Castlecomer, County Kilkenny, Ireland

renovationconversionhousing unit

Tähtaeg

11.12.2026

22

Päeva

Clúid Development Agreement with Stage Payments - Residential Developments in Co. Dublin

County Dublin, Ireland

residential developmentfull planning permissionstage payments

Tähtaeg

14.12.2026

25

Päeva

The Design and Build of 30 No. Apartment units including all necessary site development works at Mary Street, Limerick City.

Limerick City, Ireland

30 apartmentsMary Streetsite development

Tähtaeg

14.12.2026

25

Päeva

Gas Boiler heating system

County Mayo, Ireland

Tähtaeg

17.12.2026

28

Päeva

Climate Action and Windows Project at St Joseph’s College, Lucan, Co. Dublin

Lucan, County Dublin, Ireland

Tähtaeg

04.12.2026

15

Päeva

Ground Penetrating Radar Survey at Abbey Bridge

Limerick, Ireland

Ground Penetrating RadarAbbey Bridgeduct layout

Tähtaeg

04.12.2026

15

Päeva

Dynamic Purchasing System for Road Markings

Republic of Ireland

road markingsroad maintenancethermoplastic materials

Tähtaeg

26.02.2032

1924

Päeva

Shandon Exchange Project

Cork, Ireland

Tähtaeg

17.12.2026

28

Päeva