Leidke oma ideaalne leping.

Otsi ettevõtteid või hankeid.

Ekspertotsing
MO

Model Construction

Ehitus

Model Construction tegutseb valdkonnas Ehitus.

Hanked valdkonnas Ehitus

Valdkonna vasted

Need hanked on sobitatud ettevõtte valdkonna ja riigi alusel. Aktiivse FREE kontoga kasutajad saavad selle ettevõtte endale nõuda ja puuduvad andmed lisada, et leida täpsemaid vasteid. Vaata pakettide üksikasju

●Health Service Executive (HSE)

Construct a two-storey rapid-build facility of approximately 863 m², including a rooftop plantroom, and refurbish approximately 263 m² of the existing main entrance and Medical Emergency Unit. Provide maternity emergency, diagnostic scanning, assessment, labour induction, intensive care and procedure spaces, with support facilities, entrance and forecourt upgrades, landscaping and replacement car parking.

Asukoht

Limerick, Ireland

Teenuse Periood

18 months

Lepingu maksumus

10 000 000 €

Tähtaeg

14.12.2026 • 15:00

23

Päeva

Supply, install and commission lifts and escalators for Shannon Airport Authority under a single-supplier framework agreement.

Asukoht

Shannon, Ireland

Teenuse Periood

60 months

Tähtaeg

14.12.2026 • 15:00

23

Päeva

WCCC26 328 Provision of Archaeological Services

●Waterford City and County Council_103683

Provide archaeological services in support of Waterford City and County Council capital projects.

archaeological servicescapital projects

Asukoht

Waterford, Ireland

Teenuse Periood

24 months

Lepingu maksumus

100 000 €

Tähtaeg

14.12.2026 • 15:00

23

Päeva

●Cavan and Monaghan Education and Training Board

Supply, deliver, install and commission modular containerised biomass cabins, plantrooms and equipment at six schools. Supply and deliver wood pellets, sell heat, and provide full operation, maintenance, repair and replacement of the biomass equipment for 15 years under separate works and energy-supply contracts.

biomass cabinswood pelletsheat supplyinstallationmaintenance

Asukoht

County Cavan and County Monaghan, Ireland

Teenuse Periood

15 years

Lepingu maksumus

3 920 000 €

Tähtaeg

23.11.2026 • 12:00

2

Päeva

●Clúid Housing Association

Develop and construct residential housing in County Dublin under a development agreement with stage payments. Bidders must have a site with full planning permission.

residential developmentfull planning permissionstage payments

Asukoht

County Dublin, Ireland

Teenuse Periood

22 months

Lepingu maksumus

2 000 000 000 €

Tähtaeg

14.12.2026 • 12:00

23

Päeva

Act as works contractor, including PSCS, to conserve and adapt 14–17 Moore Street and provide a new visitor facility at 8–9 Moore Lane, Dublin 1.

Asukoht

Dublin, Ireland

Teenuse Periood

14 months

Tähtaeg

23.11.2026 • 12:00

2

Päeva

Gas Boiler heating system

●Mount St. Michael Secondary School (Claremorris)

Replace the existing oil boiler heating system with a gas boiler system, upgrade LPG storage tanks, and carry out associated civil works.

Asukoht

County Mayo, Ireland

Teenuse Periood

3 months

Lepingu maksumus

275 000 €

Tähtaeg

17.12.2026 • 16:00

26

Päeva

Provide technical and construction quality assurance and quality control monitoring across a portfolio of residential units at varying stages of development.

Asukoht

Nationwide, Ireland

Teenuse Periood

48 months

Lepingu maksumus

50 000 000 €

Tähtaeg

15.12.2026 • 16:00

24

Päeva

●Donegal County Council_1193

Provide a professional geologist to oversee accredited laboratory testing of concrete cores and blocks from Tenant Purchase Scheme properties, and report the results. Testing is intended to determine whether properties contain defective blocks and must comply with I.S. 465:2026.

Asukoht

County Donegal, Ireland

Teenuse Periood

24 months

Lepingu maksumus

580 000 €

Tähtaeg

18.12.2026 • 12:00

27

Päeva

Design and fit out Dublin City Market at Marys Lane, then manage and operate the market.

Asukoht

Dublin, Ireland

Teenuse Periood

15 years

Lepingu maksumus

72 500 000 €

Tähtaeg

21.12.2026 • 12:00

30

Päeva

Seotud Hanked valdkonnas Ehitus

Avastage teisi võimalusi samas sektoris

WCCC26 651 Social Housing Apartment Development at The Glen, Waterford

Waterford, Ireland

social housingapartment developmentrefurbishmentdemolitionsite works

Tähtaeg

16.12.2026

25

Päeva

Architect-Led Design Team Services for the Little Seeds Crèche Extension and Masterplan Strategy in Moyross, Co. Limerick

Moyross, County Limerick, Ireland

architect-led design teamfeasibility masterplancrèche extensionstatutory approvalsconstruction-stage delivery

Tähtaeg

14.01.2027

55

Päeva

National Centre for Research and Remembrance | Phase 3-B Main Works | Main Contractor and Project Supervisor Construction Stage (PSCS)

Dublin, Ireland

main worksarchival repositoryconservationeducational facilityPSCS

Tähtaeg

17.12.2026

26

Päeva

9843 Design and Build Capacity Enhancement Works at Connolly Station

Dublin, Ireland

Connolly Stationcapacity enhancementdesign and buildrailway worksstation refurbishment

Tähtaeg

26.11.2026

5

Päeva

Renovation and conversion of a commercial unit at No.62 Barrack Street, Castlecomer

Castlecomer, County Kilkenny, Ireland

renovationconversionhousing unitdemolitionsite works

Tähtaeg

11.12.2026

20

Päeva

Clúid Development Agreement with Stage Payments - Residential Developments in Co. Dublin

County Dublin, Ireland

residential developmentfull planning permissionstage payments

Tähtaeg

14.12.2026

23

Päeva

The Design and Build of 30 No. Apartment units including all necessary site development works at Mary Street, Limerick City.

Limerick City, Ireland

30 apartmentsMary Streetsite developmentarchaeological works

Tähtaeg

14.12.2026

23

Päeva

Gas Boiler heating system

County Mayo, Ireland

Tähtaeg

17.12.2026

26

Päeva

Climate Action and Windows Project at St Joseph’s College, Lucan, Co. Dublin

Lucan, County Dublin, Ireland

Tähtaeg

04.12.2026

13

Päeva

Ground Penetrating Radar Survey at Abbey Bridge

Limerick, Ireland

Ground Penetrating RadarAbbey Bridgeduct layoutpost-tensioned main spanbridge deck

Tähtaeg

04.12.2026

14

Päeva