Leidke oma ideaalne leping.

Otsi ettevõtteid või hankeid.

Ekspertotsing
LA

Larkin Engineering

Tootmine

Larkin Engineering tegutseb valdkonnas Tootmine.

Hanked valdkonnas Tootmine

Valdkonna vasted

Need hanked on sobitatud ettevõtte valdkonna ja riigi alusel. Aktiivse FREE kontoga kasutajad saavad selle ettevõtte endale nõuda ja puuduvad andmed lisada, et leida täpsemaid vasteid. Vaata pakettide üksikasju

Supply, Installation and Annual Maintenance of EV Chargers for Buses. Turnkey solution for the supply and installation of electric vehicle charging infrastructure including complete project management, electrical and civil works, transformers, chargers and charging points, back-office support protocols and training of relevant Bus Éireann staff. Provision of suitable energy storage systems or other sustainable backup systems. Services provided on a novated basis to a lead contractor for larger depot construction projects. Compliance with all relevant Irish and European statutory regulations and international standards. Charging protocols: 150kW IEC 61851 Mode 4 DC (CCS 2.0 Combo 2), 3 phase DC EV Charger 120kW-180kW (CCS 2.0 Combo 2), 3 phase DC EV Charger 30kW-60kW (CCS 2.0 Combo 2), 3 phase AC EV Charger 22kW (IEC 61851 Mode 3), 1 phase AC EV Charger 22kW (IEC 61851 Mode 3), 1 phase AC EV Charger 7kW (IEC 61851 Mode 3).

Electric Vehicle ChargersInstallationCommissioningBus ServicesQualification Panel

Asukoht

Dublin, Ireland

Teenuse Periood

not less than 5 years

Tähtaeg

29.08.2027 • 15:00

282

Päeva

●Health Service Executive (HSE)

Supply of Enteral Nutrition Products and Related Devices, including pumps, nutritional pumps, special nutritional products, medical consumables, administration sets, and miscellaneous medical devices and products.

Enteral feedsMedical devicesNutritional productsPumpsMedical consumables

Asukoht

Dublin, Ireland

Teenuse Periood

02/09/2026 – 02/09/2033

Lepingu maksumus

210 000 000 €

Tähtaeg

02.09.2033 • 15:00

2478

Päeva

Engineering, procurement, and construction works and services to complete infrastructure assets, including but not limited to: marine jetty structure, marine piling, floating pontoon, mooring & breasting dolphins, fender, trestle, HP gas unloading systems, on-shore gas receiving facility, utility systems, metering, odourisation, venting, pipeline and pig traps, high pressure gas grid connection, connection to existing natural gas network, utility connections for power, water and telecom, integration with FSRU, onshore terminal systems, pre commissioning and commissioning services, and management of nominated subcontractor(s).

Marine constructionGas infrastructureEPC worksFSRU integrationPipeline construction…

Asukoht

Ireland

Teenuse Periood

28.07.2026 - 27.07.2036

Tähtaeg

25.07.2036 • 12:00

3535

Päeva

Anschaffung von emissionsarmen Coaches und Schulbussen sowie, wo möglich, emissionsfreien Coaches mit geringem Umweltausdruck im Einklang mit der neuesten EURO VI-Verordnung. Die Fahrzeuge müssen die Leitlinien der EPA für Straßenverkehrsfahrzeuge und die europäischen Gemeinschaftsbestimmungen über saubere und energieeffiziente Straßenverkehrsfahrzeuge einhalten.

BusCoachEmissionsarmVerkehrsmittelBeschaffung…

Asukoht

Dublin, Irland

Teenuse Periood

60 Monate

Lepingu maksumus

720 000 000 €

Tähtaeg

31.03.2033 • 12:00

2323

Päeva

●Donegal Education and Training Board_368

Dynamic Purchasing System (DPS) for Course Consumables for use in Training Centres and Schools

SteelPipingSuppliesDPSConsumables…

Asukoht

Ireland

Teenuse Periood

26.06.2026 - 26.06.2031

Lepingu maksumus

10 000 000 €

Tähtaeg

26.06.2031 • 14:00

1679

Päeva

●Gas Networks Ireland

Design, Herstellung, Montage, Lieferung und Inbetriebnahme kompletter Paketkesselanlagen (PBU) mit natürlichen Gas-betriebenen Kesseln, natürlichen Gas-betriebenen Generatoren, zugehörigen LPHW-Systemen, Steuerungs- und Automatisierungssystemen, Instrumentierung, Dokumentation, FAT/SAT sowie Inbetriebnahmesupport. Dazu gehört der Kauf von Wärmeübertragern als Teil eines integrierten natürlichen Gas-Vorwärmesystems. GNI kann alle oder Teile der PBU und Wärmeübertrager beschaffen. Während des Rahmenzeitraums können zusätzliche Dienstleistungen, Arbeiten und Lieferungen erforderlich sein, z. B. die Bereitstellung von Kesseln und allen Nebenanlagen zur sicheren und effizienten Betriebsführung der PBU. GNI behält sich das Recht vor, Prüfungen (einschließlich Lieferantenqualitätsprüfungen) durchzuführen.

KesselanlagenGasnetzQualifikationssystemWärmeerzeugerInfrastruktur

Asukoht

Irland

Teenuse Periood

120 Monate

Tähtaeg

15.05.2036 • 12:00

3464

Päeva

●Iarnród Eireann-Irish Rail

Provision of strategic/expert advisory services, professional services secondments, project management deliverables, planning advice, alternative design options, and other consultancy services across multiple fields including architectural, engineering, environmental, financial, HR, and safety consultancy.

ArchitekturIngenieurwesenBeratungProjektmanagementUmwelt

Asukoht

Irland

Teenuse Periood

02.03.2026 - 03.03.2031

Tähtaeg

01.03.2031 • 12:00

1562

Päeva

Supply of, Repair and Maintenance for Body Parts; Supply of Parts, Repair and Maintenance of Chassis; Supply of Parts, Repair and Maintenance of Body Panels and Structure; Supply of Parts, Repair and Maintenance of Glazing; Supply of Parts, Repair and Maintenance of Heating, Ventilation and Air Conditioning Systems; Supply of, Repair and Maintenance of Hoses and Pipes; Supply of, Repair and Maintenance of Exterior and Interior Fittings; Supply of, Repair and Maintenance of Ancillary Onboard equipment; Supply of Wheel Rims; Supply of Parts, Repairs and Maintenance of Braking Systems; Supply of Suspension and Steering Systems; Supply of, Repair and Maintenance for General Driveline Systems; Supply of Filters; Supply of, Repair and Maintenance of Electrical and Electronic Components.

Spare PartsBus FleetQualification PanelVehicle MaintenanceTransport Equipment

Asukoht

Dublin, Ireland

Teenuse Periood

60 Months

Tähtaeg

30.04.2033 • 12:00

2353

Päeva

Bus Éireann beabsichtigt, emissionsarme Reisebusse und Schulbusse sowie, wo möglich, null-Emissions-Reisebusse mit geringem Umweltausstoß gemäß der neuesten EURO VI-Verordnung zu beschaffen. Die Fahrzeuge werden den Leitlinien der EPA für Straßenverkehrsfahrzeuge und den Europäischen Gemeinschafts-Verordnungen über saubere und energieeffiziente Straßenverkehrsfahrzeuge (Änderungs-)Verordnung 2021 entsprechen.

ReisebusseSchulbusseEmissionsarmLeasingKauf

Asukoht

Dublin, Irland

Teenuse Periood

60 Monate

Lepingu maksumus

480 000 000 €

Tähtaeg

31.05.2033 • 12:00

2384

Päeva

●Waterford and Wexford Education and Training Board_110494

Panel of Service Providers for the provision of BUS HIRE SERVICES to St. Paul's Community College in Waterford. The requirement will be based on the school's need for bus services. The purpose will be to facilitate students/participants and staff travelling from and to Schools and Centres for various individual trips which may include day trips, sporting events, competitions, careers fairs, science outing, debates and award ceremonies etc.

Bus HireTransport ServicesSchool TravelPassenger TransportDriver Services

Asukoht

Dublin, Ireland

Teenuse Periood

48 Months

Lepingu maksumus

210 000 €

Tähtaeg

15.04.2027 • 13:00

146

Päeva

Seotud Hanked valdkonnas Tootmine

Avastage teisi võimalusi samas sektoris

Call for Tenders for the Supply and Delivery of Dress Design Equipment to Scoil Phobail Sliabh Luachra, Rathmore,Co Kerry

Rathmore, County Kerry, Ireland

dress design equipmentsewing machinesscissorsgoods deliveryinstallation

Tähtaeg

01.12.2026

11

Päeva

SPU CO87-2026 Provision of Carbon Flux Monitoring System

Wexford, Ireland

carbon fluxmonitoring systemcarbon monitoringmeasurement instruments

Tähtaeg

25.11.2026

5

Päeva

Supply and delivery of replacement GRC Decking boards for use on the North Shannon Navigation

Roosky, County Roscommon, Ireland

GRC decking boardsmarine construction materialsNorth Shannon Navigationdelivery

Tähtaeg

20.11.2026

23

Tundi

The provision of a new Pattern Matching Machine for Midland Furniture Ltd.

Laois, Ireland

pattern matching machinemachinerywaste reductiontime efficiency

Tähtaeg

14.12.2026

24

Päeva

Supply and Delivery of 30 Barometric Pressure Sensors for Met Éireann

Glasnevin, Dublin, Ireland

barometric pressure sensorsautomatic weather stationsaviation observation networkscalibration

Tähtaeg

04.01.2027

45

Päeva

Supply of Engines and Sundry Engine Components

Dublin, Ireland

enginesengine componentsreplacement enginesmaintenance spare partsmulti-provider framework

Tähtaeg

21.12.2026

31

Päeva

Supply and Delivery of Planer Thicknesser Woodworking Saw (2 Units).

Ireland

planer thicknesserwoodworking saw

Tähtaeg

30.11.2026

10

Päeva

Supply of Wipers and Wiper Equipment

Dublin, Ireland

Tähtaeg

14.12.2026

24

Päeva

A11 Lifejackets for the Irish Naval Service

Ireland

Tähtaeg

17.12.2026

27

Päeva