WCCC26 295 Tender For Colligan Flood Study

●Waterford City and County Council_103683

Tender for Consultants for Flood Study and associated works for Colligan

Flood StudyEngineering ServicesCivil Engineering

Ubicación

Colligan, Co Waterford, Ireland

Período de Servicio

9 Months

Valor del contrato

80.000 €

Fecha Límite

30.10.2026 • 15:00

5

Días

Garden Design for Knockreer Gardens Killarney National Park

●Department of Housing Local Government and Heritage

Tenders are being sought for the preparation of a Conservation Design and Development Plan (CDDP) focused on the long-term practice of conservation horticulture at Knockreer House Gardens. The CDDP will be guided by best international practice in conservation design and interpretation.

landscape architectureconservation designhorticulture

Ubicación

Wexford, Ireland

Período de Servicio

12 Months

Valor del contrato

70.000 €

Fecha Límite

27.01.2027 • 15:00

94

Días

●Erris Chamber of commerce

Supply, delivery and installation of a permanent, programmable LED street lighting system on Main Street and Barrack Street, Belmullet, Co. Mayo, including a catenary support system, LED fittings, control system, associated electrical works and two road crossings.

LED lightingstreet lightinginstallation

Ubicación

Belmullet, Ireland

Período de Servicio

3 Months

Valor del contrato

100.000 €

Fecha Límite

28.10.2026 • 12:00

3

Días

●Kerry County Council_1204

Technical Consultancy Services Derreen Road, Killarney (Planning and Design Phases 1, 2, 3, 4). The consultant will ensure that options include measures that have a reduced impact on the environment throughout their life cycle, as compared to alternative products/solutions, in line with Green Procurement Guidance for the public sector and National and Local Climate Change Adaption Strategies.

Engineering servicesTechnical ConsultancyPlanning and Design

Ubicación

Killarney, Ireland

Período de Servicio

24 Months

Valor del contrato

250.000 €

Fecha Límite

30.10.2026 • 15:00

5

Días

Architectural Services – Public Realm, Conservation Architectural Services, Landscape Architectural Services, Civil and Structural Engineering Services, Quantity Surveying Services, Project Management Services, Project Supervisor Design Process (PSDP) Services, Employer’s Representative Services, Public Liaison / Stakeholder Engagement Services, Mechanical and Electrical Engineering Services, Planning Services, Archaeological Services, Fire Engineering Services. The Architect will act as Lead Consultant and will be responsible for coordinating and managing the full multi-disciplinary design team, programme, cost and delivery of the projects. During the construction stage, the Design Team will be required to provide ongoing technical support, respond to queries arising on site and advise on proposed variations and other matters affecting the delivery of the works.

Architectural designPublic realmLandscape

Ubicación

Clonmel, Ireland

Período de Servicio

48 Months

Valor del contrato

800.000 €

Fecha Límite

04.11.2026 • 12:00

10

Días

Supply, Installation and Annual Maintenance of EV Chargers for Buses. Turnkey solution for the supply and installation of electric vehicle charging infrastructure including complete project management, electrical and civil works, transformers, chargers and charging points, back-office support protocols and training of relevant Bus Éireann staff. Provision of suitable energy storage systems or other sustainable backup systems. Services provided on a novated basis to a lead contractor for larger depot construction projects. Compliance with all relevant Irish and European statutory regulations and international standards. Charging protocols: 150kW IEC 61851 Mode 4 DC (CCS 2.0 Combo 2), 3 phase DC EV Charger 120kW-180kW (CCS 2.0 Combo 2), 3 phase DC EV Charger 30kW-60kW (CCS 2.0 Combo 2), 3 phase AC EV Charger 22kW (IEC 61851 Mode 3), 1 phase AC EV Charger 22kW (IEC 61851 Mode 3), 1 phase AC EV Charger 7kW (IEC 61851 Mode 3).

Electric Vehicle ChargersInstallationCommissioning

Ubicación

Dublin, Ireland

Período de Servicio

not less than 5 years

Fecha Límite

29.08.2027 • 15:00

308

Días

●Gas Networks Ireland

Commercial advisory services for the procurement and contract management of Liquefied Natural Gas (LNG) and other gas commodities.

LNGProcurementContract Management

Ubicación

Ireland

Período de Servicio

180 Days

Fecha Límite

05.05.2036 • 12:00

3480

Días

Engineering, procurement, and construction works and services to complete infrastructure assets, including but not limited to: marine jetty structure, marine piling, floating pontoon, mooring & breasting dolphins, fender, trestle, HP gas unloading systems, on-shore gas receiving facility, utility systems, metering, odourisation, venting, pipeline and pig traps, high pressure gas grid connection, connection to existing natural gas network, utility connections for power, water and telecom, integration with FSRU, onshore terminal systems, pre commissioning and commissioning services, and management of nominated subcontractor(s).

Marine constructionGas infrastructureEPC works

Ubicación

Ireland

Período de Servicio

28/07/2026 - 27/07/2036

Fecha Límite

25.07.2036 • 12:00

3561

Días

9884 Qualification System for Surveys

●Iarnród Eireann-Irish Rail

Vergabe eines Qualifikationssystems (QS) für intrusive Untersuchungsleistungen zur Überwachung der Eisenbahninfrastruktur, Küstengebiete und Gebäudeanlagen von Iarnród Éireann.

Intrusive SurveysEisenbahninfrastrukturBodenuntersuchung

Ubicación

Irland

Período de Servicio

7 Jahre

Fecha Límite

21.08.2033 • 12:00

2492

Días

●Iarnród Eireann-Irish Rail

Qualifikationssystem für Baumfällung und Vegetationsbeseitigung, einschließlich planmäßiger Arbeiten (Baumpflege) und Notfallarbeiten bei sicherheitskritischen Situationen. Ancilläre Dienstleistungen können erforderlich sein.

BaumfällungVegetationsbeseitigungQualifikationssystem

Ubicación

Irland

Período de Servicio

8 Jahre

Fecha Límite

04.09.2031 • 12:00

1775

Días

Licitaciones Relacionadas en Construcción

Descubre otras oportunidades en el mismo sector

Maintenance Dredging Contract

Southeast Ireland, Ireland

maintenance dredgingnavigational channelturning circle

Fecha Límite

23.11.2026

29

Días

Proposed Community Development, Kildimo, Co. Limerick

Kildimo, County Limerick, Ireland

Fecha Límite

13.11.2026

19

Días

Sallins Park and Amenity Lands Development

Sallins, County Kildare, Ireland

Fecha Límite

25.11.2026

31

Días

Circle Heating Tender 2026

Ireland

Fecha Límite

02.12.2026

38

Días

Ballyhaunis Library and Community Hub Project

Ballyhaunis, County Mayo, Ireland

Fecha Límite

11.12.2026

48

Días

WCCC26 543 Refurbishment of 3 and 4 Georges Street Waterford

Waterford City, Ireland

Fecha Límite

23.11.2026

29

Días

Prior Information Notice Electrical Installation upgrade at Booterstown NS

Booterstown, Dublin, Ireland

Fecha Límite

02.11.2026

8

Días

R232 Glenmore Bridge Widening and Road Realignment Scheme

Glenmore, County Donegal, Ireland

Fecha Límite

20.11.2026

26

Días

FCC/268/26 Design and Build of Balbriggan Swimming Pool, Castlelands for Fingal County Council

Balbriggan, County Dublin, Ireland

Fecha Límite

19.11.2026

25

Días