Encuentra tu contrato perfecto.

Busca licitaciones a través de empresas instantáneamente

Búsqueda Experta
OR

ORS

Construcción

Mullingar, Westmeath, Irlanda
civil and structural engineeringproject managementbuilding surveying

Licitaciones Correspondientes

Multi-Party Framework Agreement for Energy Efficient Design Services as part of an Architect Led Design Team to deliver multiple Enabling Works Projects at University Hospital Galway

Health Service Executive (HSE)

Fecha Límite

21.08.202615:00

23

Días

Invitation to Tender for Building (Mechanical and Electrical) Consultancy Services for an Emergency Works Project for Upgrading the Heating System in Brannoxtown Community National School, Brannoxto

Kildare and Wicklow Education and Training Board

Mechanical and Electrical Consultancy Services (including buying in of additional services for other disciplines as required) for the upgrading of the heating system in Brannoxtown Community National School, Brannoxto, Co. Kildare.

Mechanical EngineeringElectrical EngineeringHeating System Upgrade

Ubicación

Ireland

Período de Servicio

18 Months

Valor Máximo

76.000 €

Fecha Límite

23.08.202609:45

25

Días

"Invitation to Tender for Building (Mechanical and Electrical) Consultancy Services for an Emergency Works Project for replacing the gas operated water generator system in Coláiste Chraobh Abhann, C

Kildare and Wicklow Education and Training Board

Mechanical and Electrical Consultancy Services (including buying in of additional services for other disciplines as required) for replacing the gas operated water generator system in Coláiste Chraobh Abhann, Creowen, Kilcoole, Co. Wicklow.

Mechanical EngineeringElectrical EngineeringConsultancy Services

Ubicación

Wicklow, Ireland

Período de Servicio

18 Months

Fecha Límite

23.08.202621:45

25

Días

Carrick on Shannon Parks Project (Transformation of 4 Urban Green Areas) in Carrick on Shannon, Co Leitrim

Leitrim County Council_2136

Transformation von 4 städtischen Grünflächen in Carrick on Shannon bestehend aus: 1. Existing Linear Park (Linear Park South), 2. Green Area hinter dem Shannon Lodge Estate (Linear Park North), 3. The People’s Park (ehemals MBNA Park), 4. Green Area neben dem Attifinlay Roundabout auf der N4. Das Projekt wird ein kohärentes Programm von öffentlichen Raum- und Parkverbesserungen über vier strategisch gelegene Standorte im und am Stadtkern liefern. Diese Standorte bilden ein vernetztes System städtischer Grüninfrastruktur, das den Stadtkern mit dem River Shannon und wichtigen Wohn-, Freizeit- und Tourismusstandorten verbindet.

ArchitekturLandschaftsplanungStadtentwicklung

Ubicación

Carrick on Shannon, Irland

Período de Servicio

34 Monate

Valor Máximo

650.000 €

Fecha Límite

07.09.202612:00

40

Días

TR5679 - Mechanical and Electrical Professional Services

Electricity Supply Board ( ESB )

Mechanical and Electrical Professional Services to support the delivery of capital and minor works projects in Dublin region in the Republic of Ireland.

Mechanical EngineeringElectrical EngineeringDesign Services

Ubicación

Dublin, Ireland

Período de Servicio

84 Months

Valor Máximo

1.200.000 €

Fecha Límite

24.08.202610:00

26

Días

HSE Estates SW: Regional Design Team Major Framework (€50M - €400M) 2025 for HSE South West Region

Health Service Executive (HSE)

Regionales Rahmenabkommen für HSE Design Team Services 2025 für Hauptkapitalmaßnahmen mit Projektwerten zwischen 50 Mio. und 400 Mio. EUR (exkl. MwSt.). Rahmen für Architektenleistungen (einschließlich Planer und BIM-Information Manager), Mengenverwalter, Gebäudeingenieur, Bauingenieur für zivil- und strukturelle Arbeiten, Brandschutzberater, Projektüberwachungs-Design-Prozess (PSDP), Auftraggebervertreter, energieeffizientes Design-Facilitator und Zuweisender Zertifikatgeber.

ArchitekturBauingenieurwesenRahmenabkommen

Ubicación

Irland

Período de Servicio

48 Monate

Valor Máximo

800.000.000 €

Fecha Límite

31.08.202610:00

33

Días

Celbridge Hazelhatch Mobility Corridor (Phase 5 to 7)

Kildare County Council_385

Detailed Design, Construction Administration and Project Handover of all scheme works, as approved or modified by An Coimisiún Pleanála. Approximately 2.0 km of new single carriageway mobility corridor extending from the R403 Clane Road to the R405 Hazelhatch Road, incorporating high quality active travel provision throughout. A new 66m long clear span bridge crossing of the River Liffey, designed in accordance with relevant Eurocodes and OPW requirements, with no in stream works required. Segregated footpaths and cycle facilities provided along the full length of the route, including: 2.0m wide one way cycle tracks and 2.0 m wide footpaths on both sides of the carriageway for the majority of the corridor; and a 3.0 m wide two way cycle track and footpath on constrained sections approaching Hazelhatch and Celbridge Train Station. New and upgraded junctions including signalised junctions at the R403 Clane Road, Newtown Road and R405 Hazelhatch Road, together with a priority junction at Simmonstown Manor Road and improvements to the Loughlinstown Road roundabout. Public lighting, drainage and SuDS infrastructure, including roadside drainage systems and attenuation features designed to limit discharge to greenfield run off rates and improve existing flood risk conditions. Landscaping, planting and biodiversity measures, including native species woodland and hedgerow planting, tree planting and integration of sustainable drainage features, delivering a net biodiversity gain along the corridor. Utility diversions, protections and accommodation works, including foul and surface water drainage infrastructure, watermains, ESB, Gas Networks and telecommunications assets, as required to facilitate delivery of the scheme. The Consultant shall undertake an Infrastructure Review in conjunction with Kildare County Council, relevant utility providers and other key stakeholders. All environmental mitigation, monitoring and reporting required under the Appropriate Assessment process, Natura Impact Statement, Flood Risk Assessment, and associated environmental and technical assessments accompanying the Section 177AE application.

Civil EngineeringHighways ConsultancyBridge Design

Ubicación

Ireland

Período de Servicio

39 Months

Valor Máximo

300.000 €

Fecha Límite

25.08.202614:00

27

Días

Piltown Town Centre Regeneration, Co. Kilkenny

Kilkenny County Council_1185

Provision of EV charging and Parking bays and urban renewal enhancement over c.340m of road corridor and 2 no. minor arm approaches. Includes drainage, paving, footpath construction, installation of street furniture, and electrical installation work for EV chargers.

ConstructionEV ChargingRoad Works

Ubicación

Kilkenny, Ireland

Período de Servicio

12 Months

Fecha Límite

01.09.202610:00

34

Días

TR5679 - Mechanical and Electrical Professional Services

Electricity Supply Board ( ESB )

Mechanical and Electrical Professional Services to support the delivery of capital and minor works projects in the Dublin Region.

Engineering designMechanical servicesElectrical services

Ubicación

Dublin, Ireland

Período de Servicio

7 Months

Valor Máximo

1.200.000 €

Fecha Límite

17.08.202610:00

19

Días

Bogganfin/Tuam Road Link Road, Monksland Strategic Road Project - Engineering Consultancy Service

Roscommon County Council_424

Engineering Consultancy Services for the delivery of Stages 1 to 4 of the Monksland Strategic Road Project linking the R362 to the N61 at Monksland, Co. Roscommon

EngineeringCivil EngineeringHighways

Ubicación

Roscommon, Ireland

Período de Servicio

3 Years

Fecha Límite

07.08.202614:00

9

Días

1 / 3

Licitaciones Relacionadas en Construcción

Descubre otras oportunidades en el mismo sector

Integrated Design Team Services for New Municipal Cemetery at Letterkenny, County Donegal

Ireland

Architectural ServicesCemetery ConstructionDesign Team

Fecha Límite

23.08.2026

25

Días

Refurbishment and Extension of New Ross Library

Ireland

BauarbeitenSanierungErweiterung

Fecha Límite

17.08.2026

19

Días

St. Ciaran's Community School Kells

Kells, Irland

Elektrische InstallationNotbeleuchtungFeueralarm

Fecha Límite

13.08.2026

15

Días

Emergency Works (Co. Wicklow Schools)

Dublin, Irland

ArchitekturNotfallmaßnahmenSchulen

Fecha Límite

23.08.2026

25

Días

Emergency Works (Co. Kildare Schools)

Ireland

Architectural servicesEmergency worksSchools

Fecha Límite

23.08.2026

25

Días

Construction of extensions at Mooncoin Junior and Senior Schools Scoil Mhuire NS Mooncoin Co. Waterford

Mooncoin, Irland

SchulbauErweiterungBauarbeiten

Fecha Límite

21.08.2026

23

Días

9840 Design and Build Enabling Works at the DART+ and MetroLink Interface at Glasnevin

Dublin, Ireland

ConstructionRailwayDesign and Build

Fecha Límite

25.08.2026

27

Días

Fit-Out, Landscaping and Equipment Supply

Inis Meáin, Irland

KüchengeräteLieferungGastronomie

Fecha Límite

21.08.2026

23

Días

Employers representative, technical advisory and assigned certifier services for the Project Barrow Social Housing Design and Build Contract

Dublin, Irland

ArchitekturBauberatungÜberwachung

Fecha Límite

27.08.2026

29

Días

Cassan Sound Pier/Breakwater Structural Repairs 2026 - Donegal County Council

Ireland

Pier constructionStructural repairsConcrete works

Fecha Límite

14.08.2026

16

Días

26-108 St. Mary's Primary School Dungarvan - Climate Action and Fabric Defects Works

Dungarvan, Ireland

BauarbeitenSanierungDämmung

Fecha Límite

12.08.2026

14

Días

TEN2600141 - CfT for Construction of 44 Units at Lios na Ri, Cootehill, Co. Cavan for Cavan County Council

Cavan, Irland

WohnbauMehrfamilienhausBauarbeiten

Fecha Límite

31.08.2026

33

Días

Refurbishments and Extension at Cape Clear Heritage Centre at Oileán Chléire, Co. Corcaigh

Cape Clear, Ireland

RefurbishmentExtensionConstruction

Fecha Límite

28.08.2026

30

Días

Deer fencing of 1.7 Ha yew woodland, Killarney National Park.

Killarney, Irland

ZaunbauEibenwaldNaturschutz

Fecha Límite

12.08.2026

14

Días

Donegal County Council - Rehabilitation Works to Two Bridges at Meenreagh, Killygordon (Contract 8.0, 2026)

Donegal, Ireland

Bridge constructionRehabilitation worksCivil engineering

Fecha Límite

10.08.2026

12

Días