Find your perfect contract.

Search tenders via companies instantly

Expert Search
JO

John Paul Construction

Construction

Dublin, County Dublin, Ireland
Building ContractorsCivil EngineeringData Centres

Matching Tenders

9840 Design and Build Enabling Works at the DART+ and MetroLink Interface at Glasnevin

Iarnród Eireann-Irish Rail

Design and Build of Enabling Works at the DART+ and MetroLink Interface at Glasnevin, Dublin, to facilitate the construction of MetroLink. Includes detailed design and construction of key enabling works such as site preparation, demolition, excavation, earthmoving, drainage, railway construction works, and associated civil engineering tasks.

ConstructionRailwayDesign and Build

Location

Dublin, Ireland

Service Period

5 Years

Max Value

200.000.000 €

Deadline

25.08.202610:00

25

Days

Refurbishments and Extension at Cape Clear Heritage Centre at Oileán Chléire, Co. Corcaigh

Údarás Na Gaeltachta_289

Refurbishments and Extension at Cape Clear Heritage Centre at Oileán Chléire, Co. Corcaigh, Athchóirithe agus Síneadh ar Ionad Oidhreachta Oileán Chléire, Oileán Chléire, Co. Chorcaí

RefurbishmentExtensionConstruction

Location

Cape Clear, Ireland

Service Period

18 Months

Max Value

300.000 €

Deadline

28.08.202611:00

28

Days

Celbridge Hazelhatch Mobility Corridor (Phase 5 to 7)

Kildare County Council_385

Detailed Design, Construction Administration and Project Handover of all scheme works, as approved or modified by An Coimisiún Pleanála. Approximately 2.0 km of new single carriageway mobility corridor extending from the R403 Clane Road to the R405 Hazelhatch Road, incorporating high quality active travel provision throughout. A new 66m long clear span bridge crossing of the River Liffey, designed in accordance with relevant Eurocodes and OPW requirements, with no in stream works required. Segregated footpaths and cycle facilities provided along the full length of the route, including: 2.0m wide one way cycle tracks and 2.0 m wide footpaths on both sides of the carriageway for the majority of the corridor; and a 3.0 m wide two way cycle track and footpath on constrained sections approaching Hazelhatch and Celbridge Train Station. New and upgraded junctions including signalised junctions at the R403 Clane Road, Newtown Road and R405 Hazelhatch Road, together with a priority junction at Simmonstown Manor Road and improvements to the Loughlinstown Road roundabout. Public lighting, drainage and SuDS infrastructure, including roadside drainage systems and attenuation features designed to limit discharge to greenfield run off rates and improve existing flood risk conditions. Landscaping, planting and biodiversity measures, including native species woodland and hedgerow planting, tree planting and integration of sustainable drainage features, delivering a net biodiversity gain along the corridor. Utility diversions, protections and accommodation works, including foul and surface water drainage infrastructure, watermains, ESB, Gas Networks and telecommunications assets, as required to facilitate delivery of the scheme. The Consultant shall undertake an Infrastructure Review in conjunction with Kildare County Council, relevant utility providers and other key stakeholders. All environmental mitigation, monitoring and reporting required under the Appropriate Assessment process, Natura Impact Statement, Flood Risk Assessment, and associated environmental and technical assessments accompanying the Section 177AE application.

Civil EngineeringHighways ConsultancyBridge Design

Location

Ireland

Service Period

39 Months

Max Value

300.000 €

Deadline

25.08.202614:00

25

Days

Works Contract for Proposed Modular Expansions and Internal Refurbishment Works to Emergency Department at Beaumont Hospital

Beaumont Hospital_403

Modulare Erweiterungsarbeiten und interne Sanierungsarbeiten am Notaufnahmeprogramm (Emergency Department) des Beaumont Hospital.

BauarbeitenSanierungModulare Konstruktion

Location

Dublin, Irland

Service Period

1 Jahr

Max Value

7.000.000 €

Deadline

24.08.202610:00

24

Days

Multi-Party Framework for Bridge Rehabilitation Consultancy Services, Assessment, Design and Inspection for Offaly County Council - Initial Contract - Boyne Bridge and Raheenakeeran Bridge Co. Offaly

Offaly County Council_448

Multi-Party Framework for Bridge Rehabilitation Consultancy Services, Assessment, Design and Inspection for Offaly County Council - Initial Contract - Boyne Bridge and Raheenakeeran Bridge Co. Offaly. Design Consultancy Services (Stages ii to v)

Bridge rehabilitationStructural engineeringDesign consultancy

Location

Ireland

Service Period

60 Months

Max Value

2.000.000 €

Deadline

14.08.202614:00

14

Days

Assigned Certifier Services for the Department of Education and Youth Lot 09 Design and Build projects

Department of Education and Youth

Zertifizierungsdienstleistungen für das Ministerium für Bildung und Jugend für Projekte im Rahmen des Design-and-Build-Schulen-Mehrpartei-Auftragsrahmens Nummer 1 2020-2021 gemäß den Vorschriften zur Baugenehmigung (Änderung).

ZertifizierungsdienstleistungenBauarbeitenDesign and Build

Location

Dublin, Irland

Service Period

24 Monate

Deadline

20.08.202610:00

20

Days

Request for Tender for Architect Led Multi-Disciplinary Design and Cost Management Team for New Airfield Vehicle Entry Screening Post, Associated Infrastructure and Ancillary Works at Shannon Airport

Shannon Airport Authority DAC

Architectural and related services, engineering design, cost management for new airfield vehicle entry screening post, associated infrastructure and ancillary works at Shannon Airport.

ArchitekturIngenieurwesenInfrastruktur

Location

Shannon, Ireland

Service Period

28 Months

Deadline

24.08.202611:00

24

Days

Air Handling Unit and Chiller Installation at Beaumont Hospital

Beaumont Hospital_403

Installation and commissioning of a new air handling unit and chiller within the Hospital's existing V6b plantroom and chiller compound. The appointed contractor will act as PSCS for the project.

Mechanical EngineeringHVAC InstallationChiller Installation

Location

Dublin, Ireland

Service Period

24 Months

Deadline

10.08.202610:00

10

Days

Procurement of an Integrated Design Team for New DV Refuge at Tailteann Drive, Navan, Co Meath for Meath Women's Aid Housing Association CLG

Meath Women’s Aid Housing Association CLG

Beschaffung eines integrierten Design-Teams bestehend aus Projektmanager, Architekt mit Landschaftsdesign-Dienstleistungen, Vertretung des Auftraggebers, Projektüberwacher für den Designprozess, Brandschutz- und DAC-Ingenieur, Design- und Zertifizierungsbeauftragte, Bauingenieur für Zivil- und Tragwerksbau, Gebäudeanlagentechniker und Kostenplaner für ein neues DV-Refugium an der Tailteann Drive, Navan, Co Meath.

ArchitekturBauingenieurwesenDesign

Location

Navan, Irland

Service Period

42 Monate

Max Value

750.000 €

Deadline

14.08.202610:00

14

Days

TEN2600112 - cFT for Integrated Design Team for the Development of the Bailieborough Town Centre Regeneration Scheme (Stages (i) to (ii) for Cavan County Council

Cavan County Council

Zivilingenieurberatungsleistungen und architektonische Dienstleistungen für die Entwicklung des Regenerierungsschemas für das Bailieborough Town Centre (Stufen i und ii).

ZivilingenieurwesenArchitekturStadtplanung

Location

Cavan, Irland

Service Period

18 Monate

Deadline

07.08.202610:00

7

Days

Related Tenders in Construction

Discover other opportunities in the same industry

Enabling works for new glasshouse at Glenveagh National Park

West, Irland

BauarbeitenNeubauSanierung

Deadline

03.09.2026

34

Days

Dublin City Council - Contract for Dodder Greenway Milltown Road - Dodder Walk to Dundrum Road Active Travel Scheme

Dublin, Irland

BauarbeitenRadinfrastrukturFußwege

Deadline

27.08.2026

28

Days

Arranmore/Árainn Mhór Slipway Repairs 2026 - Donegal County Council

Arranmore Island, Ireland

Pier constructionSlipway repairsMarine works

Deadline

20.08.2026

20

Days

Daisy Building Enhancement carried out by Donegal County Council

Carndonagh, Irland

BauarbeitenSanierungZäune

Deadline

28.08.2026

28

Days

Fire Compliance Works to 82 number apartments over two phases at Rochdale, Claremount Avenue, Honey Park, Dun Laoghaire, Dublin.

Dublin, Irland

FeuerwehrBauarbeitenMehrfamilienhaus

Deadline

01.09.2026

33

Days

26/034 - A Qualification System for the provision of Engineering, Procurement, Construction, Operation and Maintenance Services for the Strategic Gas Emergency Reserve

Ireland

Marine constructionGas infrastructureEPC works

Deadline

25.07.2036

3647

Days

Works Contractor PSCS and PSDP - Contractor Design and Build (PWCF2) - Development of 36no. homes and community centre at Mill Lane, Leixlip, Co. Kildare

Leixlip, Irland

BauarbeitenWohnungsbauGemeinschaftszentrum

Deadline

04.09.2026

35

Days

Design, Construction and Delivery of Cherry Orchard (Affordable for Sale) Housing Development (Pro405)

Dublin, Irland

BauWohnungsbauNeubau

Deadline

25.08.2026

25

Days

Construction of SEN Extension to Clarecastle National School

Clarecastle, Irland

SchulbauSEN-ErweiterungNeubau

Deadline

28.08.2026

28

Days

DCC - Home Building Programme Contractor Multi Party Framework Agreement in 2 Lots A and B

Dublin, Ireland

Housing ConstructionDesign and BuildSocial Housing

Deadline

26.08.2026

26

Days

Ballycoolin Bus Depot Design and Build

Dublin, Ireland

Bus DepotConstructionDesign and Build

Deadline

28.08.2026

28

Days

Emergency Works (Co. Kildare Schools)

Ireland

Architectural servicesEmergency worksSchools

Deadline

23.08.2026

24

Days

Carrick on Shannon Parks Project (Transformation of 4 Urban Green Areas) in Carrick on Shannon, Co Leitrim

Carrick on Shannon, Irland

ArchitekturLandschaftsplanungStadtentwicklung

Deadline

07.09.2026

38

Days

Refurbishment and Extension of New Ross Library

Ireland

BauarbeitenSanierungErweiterung

Deadline

17.08.2026

17

Days

Integrated Design Team Services for New Municipal Cemetery at Letterkenny, County Donegal

Ireland

Architectural ServicesCemetery ConstructionDesign Team

Deadline

23.08.2026

23

Days