Find your perfect contract.
Search tenders via companies instantly
Doherty Finegan Kelly Ltd
Construction
Matching Tenders
Framework for Engineering and Environmental Consultancy Services
●Inland Fisheries Ireland
●Inland Fisheries Ireland
Engineering Consultancy and Design Services for Civil/Structural/Hydraulic Engineering
Location
Dublin, Ireland
Service Period
4 Years
Deadline
11.09.2026 • 13:00
34
Days
CFT 3991 - Transport Led Multidisciplinary Consultancy Services
●South Dublin County Council
●South Dublin County Council
Area Based Transport Assessment, District Level Transport Plan and Local Level Transport Plans for Western Side of South Dublin County.
Location
Dublin, Ireland
Service Period
33 Months
Deadline
31.08.2026 • 14:00
23
Days
Engineering Technical Consultancy Services for the Thurles Inner Relief Road
●Tipperary County Council
●Tipperary County Council
Tipperary County Council benötigt technische Beratungsleistungen von einem multidisziplinären Team für die Fortsetzung der Thurles Inner Relief Road. Dies umfasst die Überprüfung bestehender Dokumente und die Fertigstellung ausstehender Auslieferungen für die Phasen 3 und 4 sowie die Vorbereitung aller Auslieferungen für die Phasen 5 bis 7 gemäß den Infrastrukturrichtlinien und dem technischen Bewertungsrahmen.
Location
Clonmel, Irland
Service Period
50 Monate
Max Value
2.000.000 €
Deadline
27.08.2026 • 14:00
19
Days
The Provision of Training Services for Local Enterprise Office Longford
●Longford County Council
●Longford County Council
Lieferung von Schulungsprogrammen, Workshops, Seminaren, Mentoring und Business-Entwicklungsunterstützung für kleine Unternehmen und Unternehmer, einschließlich Start-up-Unterstützung, Unternehmenswachstum, Managemententwicklung, Digitalisierung, Nachhaltigkeit, Vertrieb und Marketing, Finanzmanagement, Innovation und andere relevante Themen.
Location
Longford, Irland
Service Period
24 Monate (01.01.2027–31.12.2028)
Max Value
210.000 €
Deadline
02.10.2026 • 10:00
55
Days
Carrick on Shannon Parks Project (Transformation of 4 Urban Green Areas) in Carrick on Shannon, Co Leitrim
●Leitrim County Council_2136
●Leitrim County Council_2136
Transformation von 4 städtischen Grünflächen in Carrick on Shannon bestehend aus: 1. Existing Linear Park (Linear Park South), 2. Green Area hinter dem Shannon Lodge Estate (Linear Park North), 3. The People’s Park (ehemals MBNA Park), 4. Green Area neben dem Attifinlay Roundabout auf der N4. Das Projekt wird ein kohärentes Programm von öffentlichen Raum- und Parkverbesserungen über vier strategisch gelegene Standorte im und am Stadtkern liefern. Diese Standorte bilden ein vernetztes System städtischer Grüninfrastruktur, das den Stadtkern mit dem River Shannon und wichtigen Wohn-, Freizeit- und Tourismusstandorten verbindet.
Location
Carrick on Shannon, Irland
Service Period
34 Monate
Max Value
650.000 €
Deadline
07.09.2026 • 12:00
30
Days
Celbridge Hazelhatch Mobility Corridor (Phase 5 to 7)
●Kildare County Council_385
●Kildare County Council_385
Detailed Design, Construction Administration and Project Handover of all scheme works, as approved or modified by An Coimisiún Pleanála. Approximately 2.0 km of new single carriageway mobility corridor extending from the R403 Clane Road to the R405 Hazelhatch Road, incorporating high quality active travel provision throughout. A new 66m long clear span bridge crossing of the River Liffey, designed in accordance with relevant Eurocodes and OPW requirements, with no in stream works required. Segregated footpaths and cycle facilities provided along the full length of the route, including: 2.0m wide one way cycle tracks and 2.0 m wide footpaths on both sides of the carriageway for the majority of the corridor; and a 3.0 m wide two way cycle track and footpath on constrained sections approaching Hazelhatch and Celbridge Train Station. New and upgraded junctions including signalised junctions at the R403 Clane Road, Newtown Road and R405 Hazelhatch Road, together with a priority junction at Simmonstown Manor Road and improvements to the Loughlinstown Road roundabout. Public lighting, drainage and SuDS infrastructure, including roadside drainage systems and attenuation features designed to limit discharge to greenfield run off rates and improve existing flood risk conditions. Landscaping, planting and biodiversity measures, including native species woodland and hedgerow planting, tree planting and integration of sustainable drainage features, delivering a net biodiversity gain along the corridor. Utility diversions, protections and accommodation works, including foul and surface water drainage infrastructure, watermains, ESB, Gas Networks and telecommunications assets, as required to facilitate delivery of the scheme. The Consultant shall undertake an Infrastructure Review in conjunction with Kildare County Council, relevant utility providers and other key stakeholders. All environmental mitigation, monitoring and reporting required under the Appropriate Assessment process, Natura Impact Statement, Flood Risk Assessment, and associated environmental and technical assessments accompanying the Section 177AE application.
Location
Ireland
Service Period
39 Months
Max Value
300.000 €
Deadline
25.08.2026 • 14:00
17
Days
●Offaly County Council_448
Multi-Party Framework for Bridge Rehabilitation Consultancy Services, Assessment, Design and Inspection for Offaly County Council - Initial Contract - Boyne Bridge and Raheenakeeran Bridge Co. Offaly. Design Consultancy Services (Stages ii to v)
Location
Ireland
Service Period
60 Months
Max Value
2.000.000 €
Deadline
14.08.2026 • 14:00
6
Days
Assigned Certifier Services for the Department of Education and Youth Lot 09 Design and Build projects
●Department of Education and Youth
●Department of Education and Youth
Zertifizierungsdienstleistungen für das Ministerium für Bildung und Jugend für Projekte im Rahmen des Design-and-Build-Schulen-Mehrpartei-Auftragsrahmens Nummer 1 2020-2021 gemäß den Vorschriften zur Baugenehmigung (Änderung).
Location
Dublin, Irland
Service Period
24 Monate
Deadline
20.08.2026 • 10:00
12
Days
●Shannon Airport Authority DAC
Architectural and related services, engineering design, cost management for new airfield vehicle entry screening post, associated infrastructure and ancillary works at Shannon Airport.
Location
Shannon, Ireland
Service Period
28 Months
Deadline
24.08.2026 • 11:00
16
Days
Engineering and Environmental Consultancy Services for Nenagh Flood Relief Scheme
●Tipperary County Council
●Tipperary County Council
Identification, design and submission for planning consent of a Flood Relief Scheme, completion of detailed design, and procurement, management and oversight of the construction of the Scheme. Tasks include engineering and environmental consultancy services.
Location
Ireland
Service Period
108 Months
Max Value
3.000.000 €
Deadline
02.09.2026 • 10:00
25
Days
Related Tenders in Construction
Discover other opportunities in the same industry