Finden Sie Ihren perfekten Auftrag.

Suchen Sie Ausschreibungen via Unternehmen.

Expertensuche
WI

Wilson Architecture OMMW

Bauwesen

Cork, Co Cork, Irland
architectural designmaster planningconcept design

Passende Ausschreibungen

FIN-21 - Architectural and Project Management Services

Health Information and Quality Authority (HIQA)

Architectural and Project Management Services. As a result of modern and changing work practices as well as significant growth of the organisation, the Health Information and Quality Authority (HIQA) has a requirement to explore and scope the redesign of its offices in Cork and in Dublin.

ArchitekturProjektmanagementBüroumbau

Standort

Dublin, Irland

Leistungszeitraum

5 Years

Frist

28.08.202613:00

27

Tage

Bremore Ireland Port

Bremore Ireland Port DAC

Strategische Master-Planungsberatung während der Planungs- und Genehmigungsphase des Bremore Ireland Port-Projekts, County Meath. Das Projekt umfasst einen neuen Hafen am Strand sowie ergänzende landside-Infrastruktur für Hafenspeicherung, Logistik, saubere industrielle Entwicklung, Innovation/Forschung und Gemeinschaftsanlagen, die über mehrere Phasen hinweg umgesetzt werden.

Master PlanningUrban PlanningArchitektur

Standort

Bremore, Irland

Leistungszeitraum

3 Jahre

Frist

06.08.202615:00

5

Tage

Emergency Works (Co. Wicklow Schools)

Kildare and Wicklow Education and Training Board

Architectural Consultancy Services projects comprising of * Improving Disability Access to the Main Entrance in Glenart College, Arklow, Co. Wicklow. * Roof repair works on the main school building and sports hall in Avondale Community College, Rathdrum, Co. Wicklow.

ArchitekturNotfallmaßnahmenSchulen

Standort

Dublin, Irland

Leistungszeitraum

18 Monate

Maximalwert

85.000 €

Frist

23.08.202621:45

22

Tage

Emergency Works (Co. Kildare Schools)

Kildare and Wicklow Education and Training Board

Architectural Consultancy Services for emergency works including: repair of defective render at Athy Community College, replacement and automation of doors at Ard Scoil Rath Iomghain, and roof repair works to prefabricated buildings and the PE hall at Ard Scoil Rath Iomghain.

Architectural servicesEmergency worksSchools

Standort

Ireland

Leistungszeitraum

18 Months

Maximalwert

47.000 €

Frist

23.08.202621:45

22

Tage

TR5679 - Mechanical and Electrical Professional Services

Electricity Supply Board ( ESB )

Mechanical and Electrical Professional Services to support the delivery of capital and minor works projects in Dublin region in the Republic of Ireland.

Mechanical EngineeringElectrical EngineeringDesign Services

Standort

Dublin, Ireland

Leistungszeitraum

84 Months

Maximalwert

1.200.000 €

Frist

24.08.202610:00

22

Tage

Piltown Town Centre Regeneration, Co. Kilkenny

Kilkenny County Council_1185

Provision of EV charging and Parking bays and urban renewal enhancement over c.340m of road corridor and 2 no. minor arm approaches. Includes drainage, paving, footpath construction, installation of street furniture, and electrical installation work for EV chargers.

ConstructionEV ChargingRoad Works

Standort

Kilkenny, Ireland

Leistungszeitraum

12 Months

Frist

01.09.202610:00

30

Tage

TR5679 - Mechanical and Electrical Professional Services

Electricity Supply Board ( ESB )

Mechanical and Electrical Professional Services to support the delivery of capital and minor works projects in the Dublin Region.

Engineering designMechanical servicesElectrical services

Standort

Dublin, Ireland

Leistungszeitraum

7 Months

Maximalwert

1.200.000 €

Frist

17.08.202610:00

15

Tage

Bogganfin/Tuam Road Link Road, Monksland Strategic Road Project - Engineering Consultancy Service

Roscommon County Council_424

Engineering Consultancy Services for the delivery of Stages 1 to 4 of the Monksland Strategic Road Project linking the R362 to the N61 at Monksland, Co. Roscommon

EngineeringCivil EngineeringHighways

Standort

Roscommon, Ireland

Leistungszeitraum

3 Years

Frist

07.08.202614:00

6

Tage

Architect or Engineer Led Integrated Multidisciplinary Design Team Consultancy services for the National Biorefinery Pilot Project (NBPP) Infrastructure Upgrade and Expansion Works

Tipperary County Council

The Project comprises the upgrade and expansion of the NBPP building, including all associated design, coordination, statutory approvals, and construction supervision services. The works will be carried out within an operational (live) facility and shall include the integration of new and existing building elements, services, and systems. The Consultant's Services shall address all relevant site constraints, including continuity of operations, health and safety requirements, phasing of works, and coordination with stakeholders. The scope includes multidisciplinary design services to deliver a compliant, functional, and cost-effective solution in accordance with the Client's requirements and applicable statutory standards.

Architectural DesignEngineering ConsultancyConstruction Supervision

Standort

Mid-West, Ireland

Leistungszeitraum

18 Months

Frist

20.08.202610:00

18

Tage

Professional Services for the preparation of a Masterplan for Castletown Estate and Donaghcumper Estate and their historic landscapes

Office of Public Works (OPW)

Professionelle Dienstleistungen zur Erstellung eines Masterplans für Castletown House und Donaghcumper House sowie ihre historischen Landschaften durch ein interdisziplinäres Design-Team.

MasterplanLandschaftsarchitekturDesignberatung

Standort

Dublin, Irland

Leistungszeitraum

6 Monate

Frist

03.09.202610:00

32

Tage

1 / 2

Verwandte Ausschreibungen in Bauwesen

Entdecken Sie weitere Möglichkeiten in derselben Branche

Construction of a new Hospital Entrance at the National Orthopaedic Hospital Cappagh

Dublin, Ireland

ConstructionHospitalEntrance

Frist

28.08.2026

26

Tage

Call For Tender for Electrical Services Works Term Contract for South East Technological University - Waterford (Ref. TERELE202607)

Waterford, Ireland

Electrical installationMaintenanceRefurbishment

Frist

28.08.2026

27

Tage

Extension, Refurbishment, Heating System Upgrade and Associated Site Works

Ennis, Irland

BauarbeitenSanierungHeizung

Frist

02.09.2026

32

Tage

National Centre for Research and Remembrance | Phase 3-A Social Housing Works | Reserved Specialist | Electrical

Dublin, Irland

ElektrikBauarbeitenInstallation

Frist

10.09.2026

39

Tage

The Supply of Building Materials, Fixing and Components

Dublin, Irland

BaumaterialienBefestigungselementeKomponenten

Frist

04.09.2026

33

Tage

Engineering Technical Consultancy Services for the Thurles Inner Relief Road

Clonmel, Irland

BauingenieurwesenBeratungInfrastruktur

Frist

27.08.2026

26

Tage

National Centre for Research and Remembrance | Phase 3-A Social Housing Works | Reserved Specialist | Lift (Vertical Transport)

Dublin, Irland

AufzuginstallationSozialwohnungRollstuhlzugänglich

Frist

10.09.2026

39

Tage

National Centre for Research and Remembrance | Phase 3-A Social Housing Works | Reserved Specialist | Mechanical

Dublin, Irland

Mechanische InstallationenGebäudetechnikHeizung

Frist

10.09.2026

39

Tage

IDA Parkmore Biodiversity Enhancement Proje

Oranmore, County Galway, Irland

LandschaftsgestaltungBiodiversitätPflanzung

Frist

28.08.2026

27

Tage

SCOIL CROINE NATIONAL SCHOOL

Donegal, Irland

EntwässerungSportplatzSanierung

Frist

19.08.2026

18

Tage

Fit out of Roanmore unit in Waterford for Corlann

Waterford, Irland

BauausführungInnenausbauTagesservice

Frist

03.09.2026

33

Tage

26/034 - A Qualification System for the provision of Engineering, Procurement, Construction, Operation and Maintenance Services for the Strategic Gas Emergency Reserve

Ireland

Marine constructionGas infrastructureEPC works

Frist

25.07.2036

3645

Tage

Daisy Building Enhancement carried out by Donegal County Council

Carndonagh, Irland

BauarbeitenSanierungZäune

Frist

28.08.2026

26

Tage

Fire Compliance Works to 82 number apartments over two phases at Rochdale, Claremount Avenue, Honey Park, Dun Laoghaire, Dublin.

Dublin, Irland

FeuerwehrBauarbeitenMehrfamilienhaus

Frist

01.09.2026

31

Tage

Arranmore/Árainn Mhór Slipway Repairs 2026 - Donegal County Council

Arranmore Island, Ireland

Pier constructionSlipway repairsMarine works

Frist

20.08.2026

19

Tage