Finden Sie Ihren perfekten Auftrag.

Suchen Sie Ausschreibungen via Unternehmen.

Expertensuche
MM

MMD Construction (Cork) Ltd

Bauwesen

Cork, County Cork, Irland
Building and Civil EngineeringTraditional ContractingDesign & Build

Passende Ausschreibungen

Celbridge Hazelhatch Mobility Corridor (Phase 5 to 7)

Kildare County Council_385

Detailed Design, Construction Administration and Project Handover of all scheme works, as approved or modified by An Coimisiún Pleanála. Approximately 2.0 km of new single carriageway mobility corridor extending from the R403 Clane Road to the R405 Hazelhatch Road, incorporating high quality active travel provision throughout. A new 66m long clear span bridge crossing of the River Liffey, designed in accordance with relevant Eurocodes and OPW requirements, with no in stream works required. Segregated footpaths and cycle facilities provided along the full length of the route, including: 2.0m wide one way cycle tracks and 2.0 m wide footpaths on both sides of the carriageway for the majority of the corridor; and a 3.0 m wide two way cycle track and footpath on constrained sections approaching Hazelhatch and Celbridge Train Station. New and upgraded junctions including signalised junctions at the R403 Clane Road, Newtown Road and R405 Hazelhatch Road, together with a priority junction at Simmonstown Manor Road and improvements to the Loughlinstown Road roundabout. Public lighting, drainage and SuDS infrastructure, including roadside drainage systems and attenuation features designed to limit discharge to greenfield run off rates and improve existing flood risk conditions. Landscaping, planting and biodiversity measures, including native species woodland and hedgerow planting, tree planting and integration of sustainable drainage features, delivering a net biodiversity gain along the corridor. Utility diversions, protections and accommodation works, including foul and surface water drainage infrastructure, watermains, ESB, Gas Networks and telecommunications assets, as required to facilitate delivery of the scheme. The Consultant shall undertake an Infrastructure Review in conjunction with Kildare County Council, relevant utility providers and other key stakeholders. All environmental mitigation, monitoring and reporting required under the Appropriate Assessment process, Natura Impact Statement, Flood Risk Assessment, and associated environmental and technical assessments accompanying the Section 177AE application.

Civil EngineeringHighways ConsultancyBridge Design

Standort

Ireland

Leistungszeitraum

39 Months

Maximalwert

300.000 €

Frist

25.08.202614:00

25

Tage

Multi-Party Framework for Bridge Rehabilitation Consultancy Services, Assessment, Design and Inspection for Offaly County Council - Initial Contract - Boyne Bridge and Raheenakeeran Bridge Co. Offaly

Offaly County Council_448

Multi-Party Framework for Bridge Rehabilitation Consultancy Services, Assessment, Design and Inspection for Offaly County Council - Initial Contract - Boyne Bridge and Raheenakeeran Bridge Co. Offaly. Design Consultancy Services (Stages ii to v)

Bridge rehabilitationStructural engineeringDesign consultancy

Standort

Ireland

Leistungszeitraum

60 Months

Maximalwert

2.000.000 €

Frist

14.08.202614:00

14

Tage

Assigned Certifier Services for the Department of Education and Youth Lot 09 Design and Build projects

Department of Education and Youth

Zertifizierungsdienstleistungen für das Ministerium für Bildung und Jugend für Projekte im Rahmen des Design-and-Build-Schulen-Mehrpartei-Auftragsrahmens Nummer 1 2020-2021 gemäß den Vorschriften zur Baugenehmigung (Änderung).

ZertifizierungsdienstleistungenBauarbeitenDesign and Build

Standort

Dublin, Irland

Leistungszeitraum

24 Monate

Frist

20.08.202610:00

19

Tage

Request for Tender for Architect Led Multi-Disciplinary Design and Cost Management Team for New Airfield Vehicle Entry Screening Post, Associated Infrastructure and Ancillary Works at Shannon Airport

Shannon Airport Authority DAC

Architectural and related services, engineering design, cost management for new airfield vehicle entry screening post, associated infrastructure and ancillary works at Shannon Airport.

ArchitekturIngenieurwesenInfrastruktur

Standort

Shannon, Ireland

Leistungszeitraum

28 Months

Frist

24.08.202611:00

23

Tage

Air Handling Unit and Chiller Installation at Beaumont Hospital

Beaumont Hospital_403

Installation and commissioning of a new air handling unit and chiller within the Hospital's existing V6b plantroom and chiller compound. The appointed contractor will act as PSCS for the project.

Mechanical EngineeringHVAC InstallationChiller Installation

Standort

Dublin, Ireland

Leistungszeitraum

24 Months

Frist

10.08.202610:00

9

Tage

RFT for the Establishment of a Single Party Framework Agreement for Architectural Design Services, including Specialist Skills, for project values of less than €1m for ATU Donegal

Atlantic Technological University

Architectural Design Consultancy Services including Specialist Skills for minor works, maintenance, upgrades and refurbishment projects at its Donegal Campuses.

ArchitekturGebäudeplanungSanierung

Standort

Donegal, Irland

Leistungszeitraum

48 Monate

Maximalwert

350.000 €

Frist

05.08.202610:00

4

Tage

Procurement of an Integrated Design Team for New DV Refuge at Tailteann Drive, Navan, Co Meath for Meath Women's Aid Housing Association CLG

Meath Women’s Aid Housing Association CLG

Beschaffung eines integrierten Design-Teams bestehend aus Projektmanager, Architekt mit Landschaftsdesign-Dienstleistungen, Vertretung des Auftraggebers, Projektüberwacher für den Designprozess, Brandschutz- und DAC-Ingenieur, Design- und Zertifizierungsbeauftragte, Bauingenieur für Zivil- und Tragwerksbau, Gebäudeanlagentechniker und Kostenplaner für ein neues DV-Refugium an der Tailteann Drive, Navan, Co Meath.

ArchitekturBauingenieurwesenDesign

Standort

Navan, Irland

Leistungszeitraum

42 Monate

Maximalwert

750.000 €

Frist

14.08.202610:00

13

Tage

TEN2600112 - cFT for Integrated Design Team for the Development of the Bailieborough Town Centre Regeneration Scheme (Stages (i) to (ii) for Cavan County Council

Cavan County Council

Zivilingenieurberatungsleistungen und architektonische Dienstleistungen für die Entwicklung des Regenerierungsschemas für das Bailieborough Town Centre (Stufen i und ii).

ZivilingenieurwesenArchitekturStadtplanung

Standort

Cavan, Irland

Leistungszeitraum

18 Monate

Frist

07.08.202610:00

6

Tage

Verwandte Ausschreibungen in Bauwesen

Entdecken Sie weitere Möglichkeiten in derselben Branche

Fit out of Roanmore unit in Waterford for Corlann

Waterford, Irland

BauausführungInnenausbauTagesservice

Frist

03.09.2026

34

Tage

SCOIL CROINE NATIONAL SCHOOL

Donegal, Irland

EntwässerungSportplatzSanierung

Frist

19.08.2026

19

Tage

FIN-21 - Architectural and Project Management Services

Dublin, Irland

ArchitekturProjektmanagementBüroumbau

Frist

28.08.2026

28

Tage

IDA Parkmore Biodiversity Enhancement Proje

Oranmore, County Galway, Irland

LandschaftsgestaltungBiodiversitätPflanzung

Frist

28.08.2026

28

Tage

Dublin City Council - Contract for Dodder Greenway Milltown Road - Dodder Walk to Dundrum Road Active Travel Scheme

Dublin, Irland

BauarbeitenRadinfrastrukturFußwege

Frist

27.08.2026

27

Tage

Daisy Building Enhancement carried out by Donegal County Council

Carndonagh, Irland

BauarbeitenSanierungZäune

Frist

28.08.2026

27

Tage

Arranmore/Árainn Mhór Slipway Repairs 2026 - Donegal County Council

Arranmore Island, Ireland

Pier constructionSlipway repairsMarine works

Frist

20.08.2026

20

Tage

Enabling works for new glasshouse at Glenveagh National Park

West, Irland

BauarbeitenNeubauSanierung

Frist

03.09.2026

33

Tage

26/034 - A Qualification System for the provision of Engineering, Procurement, Construction, Operation and Maintenance Services for the Strategic Gas Emergency Reserve

Ireland

Marine constructionGas infrastructureEPC works

Frist

25.07.2036

3646

Tage

Fire Compliance Works to 82 number apartments over two phases at Rochdale, Claremount Avenue, Honey Park, Dun Laoghaire, Dublin.

Dublin, Irland

FeuerwehrBauarbeitenMehrfamilienhaus

Frist

01.09.2026

32

Tage

Works Contractor PSCS and PSDP - Contractor Design and Build (PWCF2) - Development of 36no. homes and community centre at Mill Lane, Leixlip, Co. Kildare

Leixlip, Irland

BauarbeitenWohnungsbauGemeinschaftszentrum

Frist

04.09.2026

34

Tage

DCC - Home Building Programme Contractor Multi Party Framework Agreement in 2 Lots A and B

Dublin, Ireland

Housing ConstructionDesign and BuildSocial Housing

Frist

26.08.2026

25

Tage

Design, Construction and Delivery of Cherry Orchard (Affordable for Sale) Housing Development (Pro405)

Dublin, Irland

BauWohnungsbauNeubau

Frist

25.08.2026

25

Tage

Construction of SEN Extension to Clarecastle National School

Clarecastle, Irland

SchulbauSEN-ErweiterungNeubau

Frist

28.08.2026

27

Tage

Ballycoolin Bus Depot Design and Build

Dublin, Ireland

Bus DepotConstructionDesign and Build

Frist

28.08.2026

27

Tage