Finden Sie Ihren perfekten Auftrag.

Suchen Sie Ausschreibungen via Unternehmen.

Expertensuche
EM

EMCO

Bauwesen

Clane, Kildare, Irland
insulated panelsdoorsfirewalls

Passende Ausschreibungen

26-108 St. Mary's Primary School Dungarvan - Climate Action and Fabric Defects Works

St. Mary’s Primary School (Dungarvan)

Remedial works to the external building facade to resolve water ingress issues and to restore the integrity of the external facade against further water ingress. Works include external wall treatments, remedial detailing, works to roof overhangs, fascias and soffits, associated internal remedial and repair works. Additionally, installation of attic insulation and pumped cavity wall insulation, and supply and installation of a bike rack.

BauarbeitenSanierungDämmung

Standort

Dungarvan, Ireland

Leistungszeitraum

2 Months

Frist

12.08.202613:00

13

Tage

Fit-Out, Landscaping and Equipment Supply

Seán Ó Domhnaill

Supply and delivery of commercial large kitchen appliances for a new café development. Installation excluded.

KüchengeräteLieferungGastronomie

Standort

Inis Meáin, Irland

Leistungszeitraum

12 Months

Frist

21.08.202610:00

22

Tage

Alterations of an existing building to form new handball alley with associated development works at Lavey GAA grounds

Lavey GAA

Umbau eines bestehenden Gebäudes zu einer modernen Handballbahn und Innenbereich für Spiele, zusammen mit einem Gemeinschaftsbereich zur Unterstützung von Sport, Freizeit, Gesundheit und Wohlbefinden. Dazu gehören die Entwicklung von Gemeinschaftsflächen und zugehörige Bauarbeiten.

HandballbahnUmbauBauarbeiten

Standort

Cavan, Irland

Leistungszeitraum

3 Monate

Maximalwert

250.000 €

Frist

12.08.202610:00

13

Tage

Connolly Dry Canteen DFTC Curragh Camp

Irish Defence Forces_1144

Bauarbeiten am Connolly Dry Canteen, DFTC, Curragh, Co. Kildare. Bezugnahme auf die mechanischen und elektrischen Zeichnungen gemäß dieser Spezifikation. Hauptklassifikation: Bauarbeiten (CPV 45000000), Gebäudebau (45210000), Fenster, Türen und verwandte Artikel (44221000), Sanierungsarbeiten (45453100), Elektrische Installationen (45310000), Mechanische Installationen (45350000).

BauarbeitenSanierungElektrische Installationen

Standort

Kildare, Irland

Leistungszeitraum

6 Monate

Maximalwert

600.000 €

Frist

11.08.202610:00

12

Tage

Conference Room Plunkett Mess DFTC Curragh Camp

Irish Defence Forces_1144

Bauarbeiten im Conference Room Plunkett Mess, DFTC Curragh Camp, Co. Kildare. Dazu gehören: 45210000 Baubauarbeiten, 44221000 Fenster, Türen und verwandte Artikel, 45442100 Malerarbeiten, 45453100 Sanierungsarbeiten, 45310000 Elektroinstallationen, 45350000 Mechanische Installationen.

BauarbeitenSanierungElektroinstallation

Standort

Ireland

Leistungszeitraum

6 Months

Frist

10.08.202610:00

11

Tage

Refurbishment of Science Classrooms and Preparation Room, Including Works to an Existing Classroom to Accommodate the New Science Classroom on the 2nd Floor at Scoil Mhuire, Buncrana

Scoil Mhuire (Buncrana)

Refurbishment of Science Classrooms and Preparation Room, Including Works to an Existing Classroom to Accommodate the New Science Classroom on the 2nd Floor at Scoil Mhuire, Buncrana. See cover letter for full description of works.

SchulbauSanierungWasserinstallation

Standort

Buncrana, Irland

Leistungszeitraum

2 Monate

Frist

31.07.202610:00

1

Tag

Internal alterations, cabin lift, landing, internal fire doors, glazed screen, mechanical and electrical at Ballyconnell Community Centre, Ballyconnell, Co.Cavan Eircode H14 AY24

Ballyconnell Community Centre

Internal alterations, form new youth hub on first floor, cabin lift, landing, internal fire doors, glazed screen, sliding partition wall, floor finishes, fire alarm upgrade, mechanical and electrical installation at Ballyconnell Community Centre

RefurbishmentBauarbeitenMechanical

Standort

Ballyconnell, Irland

Leistungszeitraum

2 Months

Frist

05.08.202615:30

7

Tage

Integrated Maintenance Services Framework for the LDA Residential Portfolio

The Land Development Agency

Integrated maintenance service, including Planned Preventative Maintenance (PPM), Reactive Maintenance, Emergency Works, Mechanical and Electrical Maintenance, Minor Building Works, statutory compliance activities and associated maintenance services required to support occupied residential developments and common areas.

MaintenanceBuilding InstallationsResidential Portfolio

Standort

Dublin, Ireland

Leistungszeitraum

48 Months

Maximalwert

30.000.000 €

Frist

10.08.202610:00

11

Tage

Air Handling Unit and Chiller Installation at Beaumont Hospital

Beaumont Hospital_403

Installation and commissioning of a new air handling unit and chiller within the Hospital's existing V6b plantroom and chiller compound. The appointed contractor will act as PSCS for the project.

Mechanical EngineeringHVAC InstallationChiller Installation

Standort

Dublin, Ireland

Leistungszeitraum

24 Months

Frist

10.08.202610:00

11

Tage

Refurbishment of Cottage No.16 (Mulligan’s Cottage) in Killarney National Park

Department of Housing Local Government and Heritage

Full architectural/mechanical/electrical refurbishment of Cottage No.16 at Muckross, on the N71, Killarney Kenmare route. Competent building contractors with experience in restoration of old buildings of historical and architectural merit are invited.

RefurbishmentBuilding ConstructionRestoration

Standort

Killarney, Irland

Leistungszeitraum

12 Months

Frist

12.08.202610:00

13

Tage

Verwandte Ausschreibungen in Bauwesen

Entdecken Sie weitere Möglichkeiten in derselben Branche

Construction of SEN Extension to Clarecastle National School

Clarecastle, Irland

SchulbauSEN-ErweiterungNeubau

Frist

28.08.2026

29

Tage

Ballycoolin Bus Depot Design and Build

Dublin, Ireland

Bus DepotConstructionDesign and Build

Frist

28.08.2026

29

Tage

DCC - Home Building Programme Contractor Multi Party Framework Agreement in 2 Lots A and B

Dublin, Ireland

Housing ConstructionDesign and BuildSocial Housing

Frist

26.08.2026

27

Tage

Design, Construction and Delivery of Cherry Orchard (Affordable for Sale) Housing Development (Pro405)

Dublin, Irland

BauWohnungsbauNeubau

Frist

25.08.2026

26

Tage

Emergency Works (Co. Wicklow Schools)

Dublin, Irland

ArchitekturNotfallmaßnahmenSchulen

Frist

23.08.2026

25

Tage

Emergency Works (Co. Kildare Schools)

Ireland

Architectural servicesEmergency worksSchools

Frist

23.08.2026

25

Tage

Carrick on Shannon Parks Project (Transformation of 4 Urban Green Areas) in Carrick on Shannon, Co Leitrim

Carrick on Shannon, Irland

ArchitekturLandschaftsplanungStadtentwicklung

Frist

07.09.2026

39

Tage

Integrated Design Team Services for New Municipal Cemetery at Letterkenny, County Donegal

Ireland

Architectural ServicesCemetery ConstructionDesign Team

Frist

23.08.2026

24

Tage

Construction of extensions at Mooncoin Junior and Senior Schools Scoil Mhuire NS Mooncoin Co. Waterford

Mooncoin, Irland

SchulbauErweiterungBauarbeiten

Frist

21.08.2026

22

Tage

Refurbishment and Extension of New Ross Library

Ireland

BauarbeitenSanierungErweiterung

Frist

17.08.2026

18

Tage

St. Ciaran's Community School Kells

Kells, Irland

Elektrische InstallationNotbeleuchtungFeueralarm

Frist

13.08.2026

14

Tage

9840 Design and Build Enabling Works at the DART+ and MetroLink Interface at Glasnevin

Dublin, Ireland

ConstructionRailwayDesign and Build

Frist

25.08.2026

26

Tage

Deer fencing of 1.7 Ha yew woodland, Killarney National Park.

Killarney, Irland

ZaunbauEibenwaldNaturschutz

Frist

12.08.2026

14

Tage

Refurbishments and Extension at Cape Clear Heritage Centre at Oileán Chléire, Co. Corcaigh

Cape Clear, Ireland

RefurbishmentExtensionConstruction

Frist

28.08.2026

29

Tage

TEN2600141 - CfT for Construction of 44 Units at Lios na Ri, Cootehill, Co. Cavan for Cavan County Council

Cavan, Irland

WohnbauMehrfamilienhausBauarbeiten

Frist

31.08.2026

32

Tage