Find din perfekte kontrakt.

Søg udbud via virksomheder øjeblikkeligt

Ekspertsøgning
TW

TWCE

Byggeri

Irland

TWCE er aktiv inden for Byggeri.

Udbud for Byggeri

Branchebaserede matches

Disse udbud er matchet baseret på virksomhedens branche og land. Premium-brugere kan gøre krav på denne virksomhed og tilføje de manglende oplysninger for at finde mere præcise matches. See plan details

●Electricity Supply Board ( ESB )

Multi-supplier framework for commercial services supporting the delivery of ESB’s capital programmes and providing services across ESB Group, including Engineering and Major Projects, ESB Networks, and ESB Generation and Trading. Services are to be delivered in accordance with the RFT scope, framework agreement and associated schedules.

commercial servicescapital programmesframework agreement

Placering

Ireland

Serviceperiode

8 years; five (5) years with an option to extend, at the Contracting Entity’s discretion, for a further period or periods of up to three years, in increments of two plus one year basis (i.e. for a further 2+1 years)

Kontraktværdi

50.000.000 €

Deadline

09.11.2026 • 14:00

2

Dage

●Stewarts Care Ltd.

Provision of fully qualified plumber and fully qualified carpenter for 5 days per week/52 weeks per year

plumbingcarpentrymaintenance

Placering

Dublin, Ireland

Serviceperiode

36 Months

Kontraktværdi

770.000 €

Deadline

11.11.2026 • 13:00

3

Dage

●Iarnród Eireann-Irish Rail

Design and Build Contractor to complete the design and deliver capacity enhancement and transformation works at Connolly Station. The project will create a new entrance from Preston Street and a passenger concourse within the historic Victorian undercroft, together with new lifts, escalators and staircases providing improved access to Platforms 5, 6 and 7. The works will also include additional emergency escape routes, public-realm improvements, retail, operational and back-of-house spaces, heritage refurbishment, structural alterations and the installation or modification of station and railway systems. The successful Contractor will be required to review and develop the reference design through detailed design to Approved for Construction status and subsequently construct, test and commission the works. The Contractor will also be responsible for providing complete as-built and handover information. The project will be delivered within a constrained, live operational railway environment. The Contractor will be required to manage passenger circulation, railway access, construction phasing, safety assurance, stakeholder engagement, heritage requirements and interfaces with other DART+ contracts. The appointed Contractor will undertake the role of Project Supervisor for the Construction Stage.

ConstructionRailway StationDesign and Build

Placering

Dublin, Ireland

Serviceperiode

42 Months

Kontraktværdi

34.000.000 €

Deadline

20.11.2026 • 12:00

12

Dage

●Raheen Group Water Scheme

The project involves the replacement of circa 2.3km of existing watermain, together with installation of new booster pump station and ancillary works

watermainconstructioncivil engineering

Placering

Tuamgraney, Ireland

Serviceperiode

4 Months

Kontraktværdi

900.000 €

Deadline

17.11.2026 • 12:00

9

Dage

Garden Design for Knockreer Gardens Killarney National Park

●Department of Housing Local Government and Heritage

Tenders are being sought for the preparation of a Conservation Design and Development Plan (CDDP) focused on the long-term practice of conservation horticulture at Knockreer House Gardens. The CDDP will be guided by best international practice in conservation design and interpretation.

landscape architectureconservation designhorticulture

Placering

Wexford, Ireland

Serviceperiode

12 Months

Kontraktværdi

70.000 €

Deadline

27.01.2027 • 15:00

81

Dage

Supply, Installation and Annual Maintenance of EV Chargers for Buses. Turnkey solution for the supply and installation of electric vehicle charging infrastructure including complete project management, electrical and civil works, transformers, chargers and charging points, back-office support protocols and training of relevant Bus Éireann staff. Provision of suitable energy storage systems or other sustainable backup systems. Services provided on a novated basis to a lead contractor for larger depot construction projects. Compliance with all relevant Irish and European statutory regulations and international standards. Charging protocols: 150kW IEC 61851 Mode 4 DC (CCS 2.0 Combo 2), 3 phase DC EV Charger 120kW-180kW (CCS 2.0 Combo 2), 3 phase DC EV Charger 30kW-60kW (CCS 2.0 Combo 2), 3 phase AC EV Charger 22kW (IEC 61851 Mode 3), 1 phase AC EV Charger 22kW (IEC 61851 Mode 3), 1 phase AC EV Charger 7kW (IEC 61851 Mode 3).

Electric Vehicle ChargersInstallationCommissioning

Placering

Dublin, Ireland

Serviceperiode

not less than 5 years

Deadline

29.08.2027 • 15:00

295

Dage

Commercial advisory services for the procurement and contract management of Liquefied Natural Gas (LNG) and other gas commodities.

LNGProcurementContract Management

Placering

Ireland

Serviceperiode

180 Days

Deadline

05.05.2036 • 12:00

3466

Dage

Engineering, procurement, and construction works and services to complete infrastructure assets, including but not limited to: marine jetty structure, marine piling, floating pontoon, mooring & breasting dolphins, fender, trestle, HP gas unloading systems, on-shore gas receiving facility, utility systems, metering, odourisation, venting, pipeline and pig traps, high pressure gas grid connection, connection to existing natural gas network, utility connections for power, water and telecom, integration with FSRU, onshore terminal systems, pre commissioning and commissioning services, and management of nominated subcontractor(s).

Marine constructionGas infrastructureEPC works

Placering

Ireland

Serviceperiode

28.07.2026 - 27.07.2036

Deadline

25.07.2036 • 12:00

3547

Dage

9884 Qualification System for Surveys

●Iarnród Eireann-Irish Rail

Vergabe eines Qualifikationssystems (QS) für intrusive Untersuchungsleistungen zur Überwachung der Eisenbahninfrastruktur, Küstengebiete und Gebäudeanlagen von Iarnród Éireann.

Intrusive SurveysEisenbahninfrastrukturBodenuntersuchung

Placering

Irland

Serviceperiode

7 Jahre

Deadline

21.08.2033 • 12:00

2478

Dage

●Iarnród Eireann-Irish Rail

Qualifikationssystem für Baumfällung und Vegetationsbeseitigung, einschließlich planmäßiger Arbeiten (Baumpflege) und Notfallarbeiten bei sicherheitskritischen Situationen. Ancilläre Dienstleistungen können erforderlich sein.

BaumfällungVegetationsbeseitigungQualifikationssystem

Placering

Irland

Serviceperiode

8 Jahre

Deadline

04.09.2031 • 12:00

1761

Dage

Relaterede Udbud i Byggeri

Opdag andre muligheder i samme branche

Bealach Seanadh Mhach- Phase 2

County Donegal, Ireland

boardwalkgeogrid walkwaybridge crossings

Deadline

09.12.2026

31

Dage

10105 - FUEL TANK INSPECTIONS

Dublin, Ireland

Deadline

04.12.2026

26

Dage

Provision of Site Assessment Services to the Abbey Theatre

Dublin, Ireland

Building Condition Surveysite assessmentaccessibility

Deadline

09.12.2026

32

Dage

Lisnamult Access Road N63

Roscommon, Ireland

Deadline

03.12.2026

26

Dage

Ardsallagh More Access Road

Roscommon, Ireland

Deadline

02.12.2026

25

Dage

Mechanical Works to Salesian College Celbridge, Co. Kildare (Heating Upgrade)

Celbridge, County Kildare, Ireland

space heatingheating centerheating upgrade

Deadline

24.11.2026

17

Dage

1300m of 2.4m Height Palisade fencing at Ard Gaoithe Clonmel

Clonmel, County Tipperary, Ireland

Deadline

07.12.2026

29

Dage

14 Tullyglass Hill

Shannon, County Clare, Ireland

Deadline

03.12.2026

26

Dage

EWS 2no. Boiler Plant Replacement

Cork, Ireland

boiler replacementboiler plantpipework

Deadline

24.11.2026

16

Dage

Lisnamult Access Road

Lisnamult, County Roscommon, Ireland

Deadline

02.12.2026

25

Dage

Bunscoil Ris, Castlemoyle, New Ross - Special Education Needs Unit Works

New Ross, County Wexford, Ireland

Deadline

03.12.2026

25

Dage