Find det perfekte udbud for dig.

Søg efter virksomheder eller udbud.

Ekspertsøgning
EN

Engineering Documentation Ltd.

Byggeri

Irland

Engineering Documentation Ltd. er aktiv inden for Byggeri.

Udbud for Byggeri

Branchebaserede matches

Disse udbud er matchet baseret på virksomhedens branche og land. Brugere med en aktiv FREE-konto kan gøre krav på denne virksomhed og tilføje de manglende oplysninger for at finde mere præcise matches. Se abonnementsdetaljer

Supply, Installation and Annual Maintenance of EV Chargers for Buses. Turnkey solution for the supply and installation of electric vehicle charging infrastructure including complete project management, electrical and civil works, transformers, chargers and charging points, back-office support protocols and training of relevant Bus Éireann staff. Provision of suitable energy storage systems or other sustainable backup systems. Services provided on a novated basis to a lead contractor for larger depot construction projects. Compliance with all relevant Irish and European statutory regulations and international standards. Charging protocols: 150kW IEC 61851 Mode 4 DC (CCS 2.0 Combo 2), 3 phase DC EV Charger 120kW-180kW (CCS 2.0 Combo 2), 3 phase DC EV Charger 30kW-60kW (CCS 2.0 Combo 2), 3 phase AC EV Charger 22kW (IEC 61851 Mode 3), 1 phase AC EV Charger 22kW (IEC 61851 Mode 3), 1 phase AC EV Charger 7kW (IEC 61851 Mode 3).

Electric Vehicle ChargersInstallationCommissioningBus ServicesQualification Panel

Placering

Dublin, Ireland

Serviceperiode

not less than 5 years

Deadline

29.08.2027 • 15:00

274

Dage

Commercial advisory services for the procurement and contract management of Liquefied Natural Gas (LNG) and other gas commodities.

LNGProcurementContract ManagementAdvisory ServicesGas Commodities…

Placering

Ireland

Serviceperiode

180 Days

Deadline

05.05.2036 • 12:00

3446

Dage

Engineering, procurement, and construction works and services to complete infrastructure assets, including but not limited to: marine jetty structure, marine piling, floating pontoon, mooring & breasting dolphins, fender, trestle, HP gas unloading systems, on-shore gas receiving facility, utility systems, metering, odourisation, venting, pipeline and pig traps, high pressure gas grid connection, connection to existing natural gas network, utility connections for power, water and telecom, integration with FSRU, onshore terminal systems, pre commissioning and commissioning services, and management of nominated subcontractor(s).

Marine constructionGas infrastructureEPC worksFSRU integrationPipeline construction…

Placering

Ireland

Serviceperiode

28.07.2026 - 27.07.2036

Deadline

25.07.2036 • 12:00

3527

Dage

9884 Qualification System for Surveys

●Iarnród Eireann-Irish Rail

Vergabe eines Qualifikationssystems (QS) für intrusive Untersuchungsleistungen zur Überwachung der Eisenbahninfrastruktur, Küstengebiete und Gebäudeanlagen von Iarnród Éireann.

Intrusive SurveysEisenbahninfrastrukturBodenuntersuchungGeophysikQualifikationssystem…

Placering

Irland

Serviceperiode

7 Jahre

Deadline

21.08.2033 • 12:00

2458

Dage

●Iarnród Eireann-Irish Rail

Qualifikationssystem für Baumfällung und Vegetationsbeseitigung, einschließlich planmäßiger Arbeiten (Baumpflege) und Notfallarbeiten bei sicherheitskritischen Situationen. Ancilläre Dienstleistungen können erforderlich sein.

BaumfällungVegetationsbeseitigungQualifikationssystemNotfallarbeitenBaumpflege

Placering

Irland

Serviceperiode

8 Jahre

Deadline

04.09.2031 • 12:00

1741

Dage

●Donegal Education and Training Board_368

Dynamic Purchasing System (DPS) for Course Consumables for use in Training Centres and Schools

SteelPipingSuppliesDPSConsumables…

Placering

Ireland

Serviceperiode

26.06.2026 - 26.06.2031

Kontraktværdi

10.000.000 €

Deadline

26.06.2031 • 14:00

1671

Dage

●Gas Networks Ireland

Design, Herstellung, Montage, Lieferung und Inbetriebnahme kompletter Paketkesselanlagen (PBU) mit natürlichen Gas-betriebenen Kesseln, natürlichen Gas-betriebenen Generatoren, zugehörigen LPHW-Systemen, Steuerungs- und Automatisierungssystemen, Instrumentierung, Dokumentation, FAT/SAT sowie Inbetriebnahmesupport. Dazu gehört der Kauf von Wärmeübertragern als Teil eines integrierten natürlichen Gas-Vorwärmesystems. GNI kann alle oder Teile der PBU und Wärmeübertrager beschaffen. Während des Rahmenzeitraums können zusätzliche Dienstleistungen, Arbeiten und Lieferungen erforderlich sein, z. B. die Bereitstellung von Kesseln und allen Nebenanlagen zur sicheren und effizienten Betriebsführung der PBU. GNI behält sich das Recht vor, Prüfungen (einschließlich Lieferantenqualitätsprüfungen) durchzuführen.

KesselanlagenGasnetzQualifikationssystemWärmeerzeugerInfrastruktur

Placering

Irland

Serviceperiode

120 Monate

Deadline

15.05.2036 • 12:00

3456

Dage

●Iarnród Eireann-Irish Rail

Provision of strategic/expert advisory services, professional services secondments, project management deliverables, planning advice, alternative design options, and other consultancy services across multiple fields including architectural, engineering, environmental, financial, HR, and safety consultancy.

ArchitekturIngenieurwesenBeratungProjektmanagementUmwelt

Placering

Irland

Serviceperiode

02.03.2026 - 03.03.2031

Deadline

01.03.2031 • 12:00

1554

Dage

Supply of, Repair and Maintenance for Body Parts; Supply of Parts, Repair and Maintenance of Chassis; Supply of Parts, Repair and Maintenance of Body Panels and Structure; Supply of Parts, Repair and Maintenance of Glazing; Supply of Parts, Repair and Maintenance of Heating, Ventilation and Air Conditioning Systems; Supply of, Repair and Maintenance of Hoses and Pipes; Supply of, Repair and Maintenance of Exterior and Interior Fittings; Supply of, Repair and Maintenance of Ancillary Onboard equipment; Supply of Wheel Rims; Supply of Parts, Repairs and Maintenance of Braking Systems; Supply of Suspension and Steering Systems; Supply of, Repair and Maintenance for General Driveline Systems; Supply of Filters; Supply of, Repair and Maintenance of Electrical and Electronic Components.

Spare PartsBus FleetQualification PanelVehicle MaintenanceTransport Equipment

Placering

Dublin, Ireland

Serviceperiode

60 Months

Deadline

30.04.2033 • 12:00

2345

Dage

●Technological University Dublin (TU Dublin)

Lieferung von elektrischen Geräten für Lehrzwecke, insbesondere Prüf- und Messgeräte (Oszilloskope, Generatoren, Aufnahmen, Transformatoren).

PrüfgeräteMessgeräteLehrzweckeElektrische GeräteDPS…

Placering

Dublin, Irland

Serviceperiode

07.05.2026 bis 07.05.2031

Kontraktværdi

8.000.000 €

Deadline

07.05.2031 • 14:00

1621

Dage

Relaterede Udbud i Byggeri

Opdag andre muligheder i samme branche

St. Dominic’s Park Civil Works Package

Drogheda, County Louth, Ireland

civil worksplayground extensioncar parkdrainagegreen public procurement

Deadline

15.12.2026

17

Dage

Culvert repair and ancillary works (Phase 2), Peoples Gardens, Phoenix Park, Dublin 8.

Phoenix Park, Dublin, Ireland

culvert repairprecast culvertslandscapingpedestrian pathsplayground reinstatement

Deadline

14.12.2026

16

Dage

Request for Expressions of Interest for Purpose-Built Student Accommodation ("PBSA") - Potential On-Campus and Off-Campus Development Opportunities

Ireland

purpose-built student accommodationon-campus developmenthigher educationIrelandoff-campus development…

Deadline

11.12.2026

13

Dage

WCCC25 494 Munster Express Development Works

Waterford, Ireland

refurbishmentextensiondemolitionexhibition spacescircular economy

Deadline

04.12.2026

6

Dage

Architect Consultancy and PSDP Services with bought in services - Green Devolved Project at Templemore College

Templemore, County Tipperary, Ireland

architect consultancyPSDP servicesbought-in servicesgreen projectfurther education college

Deadline

15.12.2026

17

Dage

Croagh to Rathkeale Design and Construction Contract

Limerick and Clare, Ireland

road constructionmotorwaydual carriagewaydrainageretaining walls

Deadline

19.02.2027

83

Dage

Domestic Violence Refuge and Social Housing at Evergreen Road, Turner’s Cross, Cork

Turner’s Cross, Cork, Ireland

domestic violence refugesocial housingrenovationapartmentsconstruction

Deadline

09.12.2026

11

Dage

Beechlawn Fire Safety Refurbishment and Extension Works

Dublin, Ireland

fire safetyrefurbishmentextension works

Deadline

11.01.2027

44

Dage

Clontuskert GWSS Tristaun Extension

Tristaun, Ballinasloe, County Galway, Ireland

water supply pipelinepipeline constructionancillary workswater supply extension

Deadline

11.12.2026

13

Dage

Ballyferriter Museum Refurbishment Contract

Ballyferriter, County Kerry, Ireland

museum refurbishmentstructural alterationsroof renewalM&E upgradesexternal works

Deadline

14.12.2026

16

Dage

Conservation, refurbishment and adaptive reuse works at the former Tipperary Town Courthouse and Bridewell

Tipperary Town, County Tipperary, Ireland

courthouse restorationrefurbishmentadaptive reuseBridewelladult education centre

Deadline

18.12.2026

20

Dage

Claureen Link Road Phase 1

County Clare, Ireland

Claureen Link Roadroad constructiondrainagecycle trackutility diversions

Deadline

11.12.2026

13

Dage

Meath Co Co - MH-TRA-26-21 - Single-Party Framework for Architect-led Multi Disciplinary Design Services for the initial project of the Laytown - Bettystown Community Building and Park

Bettystown, County Meath, Ireland

architect-led designmultidisciplinary designcommunity buildingpublic parkframework

Deadline

07.01.2027

40

Dage

2026 Architectural Design Consultant for ASA project at Scoil Naomh Cualan Pallas Street Borrisoleigh, Thurles, Co. Tipperary

Borrisoleigh, County Tipperary, Ireland

architectural designschool extensionclassroomssensory gardendemolition

Deadline

18.12.2026

20

Dage