Find din perfekte kontrakt.
Søg udbud via virksomheder øjeblikkeligt
Doyle Morris Group
Byggeri
Matchende Udbud
9840 Design and Build Enabling Works at the DART+ and MetroLink Interface at Glasnevin
●Iarnród Eireann-Irish Rail
●Iarnród Eireann-Irish Rail
Design and Build of Enabling Works at the DART+ and MetroLink Interface at Glasnevin, Dublin, to facilitate the construction of MetroLink. Includes detailed design and construction of key enabling works such as site preparation, demolition, excavation, earthmoving, drainage, railway construction works, and associated civil engineering tasks.
Placering
Dublin, Ireland
Serviceperiode
5 Years
Maksimal Værdi
200.000.000 €
Deadline
25.08.2026 • 10:00
26
Dage
Refurbishments and Extension at Cape Clear Heritage Centre at Oileán Chléire, Co. Corcaigh
●Údarás Na Gaeltachta_289
●Údarás Na Gaeltachta_289
Refurbishments and Extension at Cape Clear Heritage Centre at Oileán Chléire, Co. Corcaigh, Athchóirithe agus Síneadh ar Ionad Oidhreachta Oileán Chléire, Oileán Chléire, Co. Chorcaí
Placering
Cape Clear, Ireland
Serviceperiode
18 Months
Maksimal Værdi
300.000 €
Deadline
28.08.2026 • 11:00
29
Dage
Works Contract for Proposed Modular Expansions and Internal Refurbishment Works to Emergency Department at Beaumont Hospital
●Beaumont Hospital_403
●Beaumont Hospital_403
Modulare Erweiterungsarbeiten und interne Sanierungsarbeiten am Notaufnahmeprogramm (Emergency Department) des Beaumont Hospital.
Placering
Dublin, Irland
Serviceperiode
1 Jahr
Maksimal Værdi
7.000.000 €
Deadline
24.08.2026 • 10:00
25
Dage
Relaterede Udbud i Byggeri
Opdag andre muligheder i samme branche