Find din perfekte kontrakt.
Søg udbud via virksomheder øjeblikkeligt
CS Consulting Group Civil & Structural Engineers
Byggeri
Matchende Udbud
Engineering Technical Consultancy Services for the Thurles Inner Relief Road
●Tipperary County Council
●Tipperary County Council
Deadline
27.08.2026 • 14:00
26
Dage
Emergency Works (Co. Wicklow Schools)
●Kildare and Wicklow Education and Training Board
●Kildare and Wicklow Education and Training Board
Architectural Consultancy Services projects comprising of * Improving Disability Access to the Main Entrance in Glenart College, Arklow, Co. Wicklow. * Roof repair works on the main school building and sports hall in Avondale Community College, Rathdrum, Co. Wicklow.
Placering
Dublin, Irland
Serviceperiode
18 Monate
Maksimal Værdi
85.000 €
Deadline
23.08.2026 • 21:45
22
Dage
Emergency Works (Co. Kildare Schools)
●Kildare and Wicklow Education and Training Board
●Kildare and Wicklow Education and Training Board
Architectural Consultancy Services for emergency works including: repair of defective render at Athy Community College, replacement and automation of doors at Ard Scoil Rath Iomghain, and roof repair works to prefabricated buildings and the PE hall at Ard Scoil Rath Iomghain.
Placering
Ireland
Serviceperiode
18 Months
Maksimal Værdi
47.000 €
Deadline
23.08.2026 • 21:45
22
Dage
Celbridge Hazelhatch Mobility Corridor (Phase 5 to 7)
●Kildare County Council_385
●Kildare County Council_385
Detailed Design, Construction Administration and Project Handover of all scheme works, as approved or modified by An Coimisiún Pleanála. Approximately 2.0 km of new single carriageway mobility corridor extending from the R403 Clane Road to the R405 Hazelhatch Road, incorporating high quality active travel provision throughout. A new 66m long clear span bridge crossing of the River Liffey, designed in accordance with relevant Eurocodes and OPW requirements, with no in stream works required. Segregated footpaths and cycle facilities provided along the full length of the route, including: 2.0m wide one way cycle tracks and 2.0 m wide footpaths on both sides of the carriageway for the majority of the corridor; and a 3.0 m wide two way cycle track and footpath on constrained sections approaching Hazelhatch and Celbridge Train Station. New and upgraded junctions including signalised junctions at the R403 Clane Road, Newtown Road and R405 Hazelhatch Road, together with a priority junction at Simmonstown Manor Road and improvements to the Loughlinstown Road roundabout. Public lighting, drainage and SuDS infrastructure, including roadside drainage systems and attenuation features designed to limit discharge to greenfield run off rates and improve existing flood risk conditions. Landscaping, planting and biodiversity measures, including native species woodland and hedgerow planting, tree planting and integration of sustainable drainage features, delivering a net biodiversity gain along the corridor. Utility diversions, protections and accommodation works, including foul and surface water drainage infrastructure, watermains, ESB, Gas Networks and telecommunications assets, as required to facilitate delivery of the scheme. The Consultant shall undertake an Infrastructure Review in conjunction with Kildare County Council, relevant utility providers and other key stakeholders. All environmental mitigation, monitoring and reporting required under the Appropriate Assessment process, Natura Impact Statement, Flood Risk Assessment, and associated environmental and technical assessments accompanying the Section 177AE application.
Placering
Ireland
Serviceperiode
39 Months
Maksimal Værdi
300.000 €
Deadline
25.08.2026 • 14:00
24
Dage
Development of a New NPWS Visitor Park Centre for The Burren National Park
●Department of Housing Local Government and Heritage
●Department of Housing Local Government and Heritage
Provision of Architect or Engineer led Design Team Consultancy Services for development at 1-2 Riverview, Church Street, Newtown, Corofin, Co Clare V95 ANP8. The development will consist of: The demolition of 1-2 Riverview buildings and associated outbuildings and boundary wall and the development of a single storey NPWS Visitor Centre for The Burren National Park, 3 storey NPWS office building, car parking facilities with associated vehicle access points and ramp and all associated site development, boundary and landscaping works.
Placering
Corofin, Irland
Serviceperiode
50 Monate
Deadline
21.08.2026 • 10:00
20
Dage
Multi-Party Framework for Bridge Rehabilitation Consultancy Services, Assessment, Design and Inspection for Offaly County Council - Initial Contract - Boyne Bridge and Raheenakeeran Bridge Co. Offaly
●Offaly County Council_448
●Offaly County Council_448
Multi-Party Framework for Bridge Rehabilitation Consultancy Services, Assessment, Design and Inspection for Offaly County Council - Initial Contract - Boyne Bridge and Raheenakeeran Bridge Co. Offaly. Design Consultancy Services (Stages ii to v)
Placering
Ireland
Serviceperiode
60 Months
Maksimal Værdi
2.000.000 €
Deadline
14.08.2026 • 14:00
13
Dage
Asbestos Surveys in PMVT buildings/locations
●Peter McVerry Trust_121127
●Peter McVerry Trust_121127
By understanding the volume of asbestos present in properties, PMVT can proactively manage and hold an up to date register of known asbestos within our stock while also giving the ability to put in place appropriate safeguards and plan for future safety works to manage the issue if and when required.
Placering
Ireland
Serviceperiode
48 Months
Deadline
19.08.2026 • 15:30
18
Dage
Request for Tender for Architect Led Multi-Disciplinary Design and Cost Management Team for New Airfield Vehicle Entry Screening Post, Associated Infrastructure and Ancillary Works at Shannon Airport
●Shannon Airport Authority DAC
●Shannon Airport Authority DAC
Architectural and related services, engineering design, cost management for new airfield vehicle entry screening post, associated infrastructure and ancillary works at Shannon Airport.
Placering
Shannon, Ireland
Serviceperiode
28 Months
Deadline
24.08.2026 • 11:00
23
Dage
Engineering and Environmental Consultancy Services for Nenagh Flood Relief Scheme
●Tipperary County Council
●Tipperary County Council
Identification, design and submission for planning consent of a Flood Relief Scheme, completion of detailed design, and procurement, management and oversight of the construction of the Scheme. Tasks include engineering and environmental consultancy services.
Placering
Ireland
Serviceperiode
108 Months
Maksimal Værdi
3.000.000 €
Deadline
02.09.2026 • 10:00
32
Dage
RFT for the Establishment of a Single Party Framework Agreement for Architectural Design Services, including Specialist Skills, for project values of less than €1m for ATU Donegal
●Atlantic Technological University
●Atlantic Technological University
Architectural Design Consultancy Services including Specialist Skills for minor works, maintenance, upgrades and refurbishment projects at its Donegal Campuses.
Placering
Donegal, Irland
Serviceperiode
48 Monate
Maksimal Værdi
350.000 €
Deadline
05.08.2026 • 10:00
4
Dage
Relaterede Udbud i Byggeri
Opdag andre muligheder i samme branche