Find din perfekte kontrakt.

Søg efter virksomheder eller udbud.

Ekspertsøgning
BI

BITMAC

Byggeri

Irland

BITMAC er aktiv inden for Byggeri.

Udbud for Byggeri

Branchebaserede matches

Disse udbud er matchet baseret på virksomhedens branche og land. Brugere med en aktiv FREE-konto kan gøre krav på denne virksomhed og tilføje de manglende oplysninger for at finde mere præcise matches. Se abonnementsdetaljer

●Enable Ireland Disability Services Ltd

Convert and fit out an existing ground-floor retail unit as a Day Care Centre and Day Services Hub. Works include internal alterations, accessible sanitary facilities, finishes, mechanical and electrical services, fire safety, accessibility, signage and associated completion works.

Placering

Tallaght Cross, Tallaght, Dublin, Ireland

Serviceperiode

12 months

Kontraktværdi

480.000 €

Deadline

24.11.2026 • 16:00

4

Dage

●Road Safety Authority (RSA)

Provide an interactive, connected breathalyser terminal service for the Road Safety Authority, as detailed in the tender requirements.

Placering

Ireland

Serviceperiode

84 months

Kontraktværdi

1.500.000 €

Deadline

04.12.2026 • 10:00

14

Dage

●Carlow County Council

Provide archaeological consultancy for the N80 Leagh Bends Scheme: test excavations and surveys; pre-excavation services; excavations and preliminary reporting; analysis, reporting, public dissemination and archiving; and, if instructed, archaeological monitoring during construction. Each stage requires written instruction by the contracting authority.

Placering

Carlow, Ireland

Serviceperiode

18 months

Kontraktværdi

830.000 €

Deadline

20.11.2026 • 14:00

19

Timer

Renovate and extend the existing convent into a domestic violence refuge with 20 accommodation units and associated services. Build two four-storey residential blocks with 32 apartments, parking, roads and ancillary services; submit options for phased delivery and refuge-only.

Placering

Cork, Ireland

Serviceperiode

30 months

Kontraktværdi

22.000.000 €

Deadline

25.11.2026 • 17:00

5

Dage

●Port of Cork Company

Remove flaking paint and repaint the entire tower section of the passenger walkway at Port of Cork Ferry Port.

paintingpassenger walkwaytower sectionflaking paint

Placering

Ringaskiddy, County Cork, Ireland

Serviceperiode

3 months

Deadline

20.11.2026 • 17:00

22

Timer

●Port of Cork Company

Extend the existing deep-water berth, surface land behind the quay and dredge the seabed to -13.4m Chart Datum. Provide lighting, drainage and associated civil, mechanical and electrical works; the authority may adjust the approximate scope.

Placering

Ringaskiddy, County Cork, Ireland

Serviceperiode

24 months

Deadline

27.11.2026 • 17:00

7

Dage

●GREYSTEEL COMMUNITY ENTERPRISES LTD

Deliver a sports dome with a 3G playing surface and associated works in Greysteel. Refurbish an existing building in Creeslough, County Donegal, to provide community facilities.

Placering

Greysteel, County Derry, Ireland; Creeslough, County Donegal, Ireland

Serviceperiode

15.12.2026 - 30.06.2029

Kontraktværdi

275.000 £

Deadline

20.11.2026 • 12:00

17

Timer

Undertake comprehensive valuations of ASI’s 14 properties across Ireland, including rebuilding and reinstatement costs for insurance. Provide valuation advice for financial reporting, identify impairment indicators, and establish a consistent portfolio valuation framework.

Placering

Republic of Ireland

Serviceperiode

5 years

Kontraktværdi

35.000 €

Deadline

25.11.2026 • 12:00

5

Dage

●An Post_391

Supply, installation and commissioning of solar photovoltaic systems at An Post properties throughout the Republic of Ireland, with maintenance during the applicable warranty period. The system may also be used for later call-offs for support, maintenance and/or ongoing enhancements, without guaranteed volume.

Solar PV systemssolar panelsinstallationcommissioningrenewable energy

Placering

Republic of Ireland

Serviceperiode

04.11.2026 -; 10 years; An Post reserves the right to extend or close the panel early in line with Operational Requirements; maintenance during the applicable warranty period

Deadline

30.11.2031 • 23:59

1837

Dage

●Iarnród Eireann-Irish Rail

Design and Build Contractor to complete the design and deliver capacity enhancement and transformation works at Connolly Station. The project will create a new entrance from Preston Street and a passenger concourse within the historic Victorian undercroft, together with new lifts, escalators and staircases providing improved access to Platforms 5, 6 and 7. The works will also include additional emergency escape routes, public-realm improvements, retail, operational and back-of-house spaces, heritage refurbishment, structural alterations and the installation or modification of station and railway systems. The successful Contractor will be required to review and develop the reference design through detailed design to Approved for Construction status and subsequently construct, test and commission the works. The Contractor will also be responsible for providing complete as-built and handover information. The project will be delivered within a constrained, live operational railway environment. The Contractor will be required to manage passenger circulation, railway access, construction phasing, safety assurance, stakeholder engagement, heritage requirements and interfaces with other DART+ contracts. The appointed Contractor will undertake the role of Project Supervisor for the Construction Stage.

ConstructionRailway StationDesign and BuildHeritage RefurbishmentInfrastructure

Placering

Dublin, Ireland

Serviceperiode

42 Months

Kontraktværdi

34.000.000 €

Deadline

20.11.2026 • 12:00

17

Timer

Relaterede Udbud i Byggeri

Opdag andre muligheder i samme branche

Renovation and conversion of a commercial unit at No.62 Barrack Street, Castlecomer

Castlecomer, County Kilkenny, Ireland

renovationconversionhousing unitdemolitionsite works

Deadline

11.12.2026

21

Dage

Clúid Development Agreement with Stage Payments - Residential Developments in Co. Dublin

County Dublin, Ireland

residential developmentfull planning permissionstage payments

Deadline

14.12.2026

24

Dage

The Design and Build of 30 No. Apartment units including all necessary site development works at Mary Street, Limerick City.

Limerick City, Ireland

30 apartmentsMary Streetsite developmentarchaeological works

Deadline

14.12.2026

24

Dage

Gas Boiler heating system

County Mayo, Ireland

Deadline

17.12.2026

27

Dage

Climate Action and Windows Project at St Joseph’s College, Lucan, Co. Dublin

Lucan, County Dublin, Ireland

Deadline

04.12.2026

14

Dage

Ground Penetrating Radar Survey at Abbey Bridge

Limerick, Ireland

Ground Penetrating RadarAbbey Bridgeduct layoutpost-tensioned main spanbridge deck

Deadline

04.12.2026

14

Dage

Dynamic Purchasing System for Road Markings

Republic of Ireland

road markingsroad maintenancethermoplastic materials

Deadline

26.02.2032

1924

Dage

Shandon Exchange Project

Cork, Ireland

Deadline

17.12.2026

27

Dage