Najděte svou dokonalou zakázku.
Vyhledávejte zakázky prostřednictvím společností okamžitě
Varmetap.no
Stavebnictví
Odpovídající zakázky
Framework agreement ventilation services
●Ringerike Boligstiftelse
●Ringerike Boligstiftelse
Periodic service for all types of ventilation installations - Replacing filters, V-belts and other consumables - General troubleshooting and repairing, condition reports - Revising and preparing drawings and forms in connection with documentation.- Assembly, alteration and expansion of ventilation installations - Marking components in accordance with documentation.- Web based control system for remote monitoring of ventilation systems through ventilation installations. Control control, etc. with data exchange through API
Místo
Hønefoss, Norge
Období Služby
30.11.2026–30.11.2030
Maximální Hodnota
15.000.000 €
Termín
27.08.2026 • 06:00
29
Dny
2026/3024 - 1148703 NTNU Campus collection - Sub-project 1148711 P5 Main Junction - Interaction Contract - Qualification Phase.
●STATSBYGG
●STATSBYGG
Turnkey-Vertrag für das Subprojekt P5 Hauptkreuzung (K205) im Rahmen des Projekts NTNU Campus Collection. Der Vertrag umfasst die Entwicklung, detaillierte Planung und den Bau von Gebäuden für eine Universität. Es handelt sich um Bauarbeiten (CPV: 45000000, 45210000, 45214400).
Místo
Trøndelag, Norwegen
Období Služby
48 Monate
Termín
14.08.2026 • 08:00
16
Dny
Framework agreement for consultancy services
●Kvæfjord Kommune
●Kvæfjord Kommune
General technical consulting within the disciplines: Construction, Electro, HVAC and sanitation. Assignments include internal technical consulting.
Místo
Harstad, Norge
Období Služby
48 Months
Termín
17.08.2026 • 10:00
19
Dny
Framework agreement for consultancy services
●Kvæfjord Kommune
●Kvæfjord Kommune
General technical consulting within the disciplines: Construction, Electro, HVAC and sanitation. Includes internal technical consulting.
Místo
Harstad, Norge
Období Služby
48 Months
Maximální Hodnota
12.000.000 €
Termín
17.08.2026 • 10:00
19
Dny
Begby school - Partnering contract - Stage 1: Prequalification
●Fredrikstad kommune
●Fredrikstad kommune
Partnering contract for the establishment of Begby school with a sports hall. The assignment will be carried out in two phases, of which phase 1 will be carried out as a consultant assignment based on NS 8401, then Phase 2 will be carried out as a contract based on NS 8407. The contract includes civil engineering consultancy services, sports hall construction work, and construction work for school buildings.
Místo
Fredrikstad, Norge
Období Služby
10 Months
Maximální Hodnota
300.000.000 €
Termín
04.09.2026 • 08:00
37
Dny
Prequalification: Ground work and construction of a transformer building as well as the establishment of cable trenches - Haugaland Næringspark
●FAGNE AS
●FAGNE AS
Turnkey-contract for ground work and construction of a new transformer station (one station building and two of five transformer cells), establishment of a ground cable connection to end mast M22, and cable trenches between Statnett's transformer station at Gismarvik and Haugaland Næringspark. The transformer station shall be certified in accordance with BREEAM-NOR v.6.0.
Místo
Haugesund, Norge
Období Služby
10.01.2027–01.12.2028
Termín
20.08.2026 • 19:59
23
Dny
Framework agreement, Cooling and freezer room - Procurement and service
●Universitetet i Sørøst-Norge (USN)
●Universitetet i Sørøst-Norge (USN)
Framework agreement for a clean room, refrigeration room and freezer room, primarily covering the existing installations. Includes supplies of heat-exchange units, air-conditioning and refrigerating equipment, filtering machinery, repair and maintenance services of building installations, technical inspection and testing services, and installation work for ventilation and air-conditioning.
Místo
Borre, Norge
Období Služby
01.09.2026–31.08.2028
Maximální Hodnota
2.000.000 €
Termín
17.08.2026 • 08:00
19
Dny
(2026/725) Maintenance of municipal bridges
●Viken Vest Innkjøpssamarbeid (VVI)
●Viken Vest Innkjøpssamarbeid (VVI)
Maintenance of municipal bridges, framework agreement. The volume can vary both up and down and the contract period will depend on, among other things, the contracting authority's needs, activities, budgetary situations and other framework factors.
Místo
Norge
Období Služby
14.09.2026 – 13.09.2028
Maximální Hodnota
100.000.000 €
Termín
24.08.2026 • 08:00
26
Dny
Související Zakázky v Stavebnictví
Objevte další příležitosti ve stejném odvětví