Najděte svou dokonalou zakázku.
Vyhledávejte zakázky prostřednictvím společností okamžitě
TASK PLAN DEVELOPMENT LTD
Stavebnictví
TASK PLAN DEVELOPMENT LTD působí v oboru Stavebnictví.
Zakázky pro Stavebnictví
Oborové shody
Tyto zakázky odpovídají odvětví a zemi společnosti. Uživatelé Premium mohou tuto společnost nárokovat a doplnit chybějící údaje pro přesnější shody. See plan details
Design and build of portable/modular accommodation for server equipment at Cork Airport control Tower.
●The Irish Air Navigation Service
●The Irish Air Navigation Service
Design and build of portable/modular accommodation for server equipment at Cork Airport control Tower
Místo
Dublin, Ireland
Období Služby
12 Months
Hodnota zakázky
200 000 €
Termín
23.10.2026 • 12:00
7
Dny
Consultancy Services to prepare a Strategic Assessment and Preliminary Business Case in accordance with the Infrastructure Guidelines issued by the Department of Public Expenditure, National Development Plan Delivery and Reform and as further detailed in the tender documents to support capital funding applications to various Government departments into the future.
Místo
Dublin, Ireland
Období Služby
9 Months
Termín
16.10.2026 • 17:00
16
Hodiny
The Supply and Delivery of Automotive Paints and Accessories for the Irish Defence Forces
●Irish Defence Forces_1144
●Irish Defence Forces_1144
The Supply and Delivery of Automotive Paints and Accessories for the Irish Defence Forces
Místo
Dublin, Ireland
Období Služby
48 Months
Hodnota zakázky
600 000 €
Termín
18.10.2026 • 12:00
2
Dny
Dunboyne National School - Modular Single Storey Relocation
●Dunboyne Junior + Senior National School
●Dunboyne Junior + Senior National School
Removal of one number single storey temporary structure and relocate to Dunboyne National School with associated site works. Additionally the demolition of a seperate existing standalone prefabricated building.
Místo
Dunboyne, Ireland
Období Služby
2 Months
Hodnota zakázky
240 000 €
Termín
16.10.2026 • 12:00
11
Hodiny
●Bus Eireann/Irish Bus
Supply, Installation and Annual Maintenance of EV Chargers for Buses. Turnkey solution for the supply and installation of electric vehicle charging infrastructure including complete project management, electrical and civil works, transformers, chargers and charging points, back-office support protocols and training of relevant Bus Éireann staff. Provision of suitable energy storage systems or other sustainable backup systems. Services provided on a novated basis to a lead contractor for larger depot construction projects. Compliance with all relevant Irish and European statutory regulations and international standards. Charging protocols: 150kW IEC 61851 Mode 4 DC (CCS 2.0 Combo 2), 3 phase DC EV Charger 120kW-180kW (CCS 2.0 Combo 2), 3 phase DC EV Charger 30kW-60kW (CCS 2.0 Combo 2), 3 phase AC EV Charger 22kW (IEC 61851 Mode 3), 1 phase AC EV Charger 22kW (IEC 61851 Mode 3), 1 phase AC EV Charger 7kW (IEC 61851 Mode 3).
Místo
Dublin, Ireland
Období Služby
not less than 5 years
Termín
29.08.2027 • 15:00
317
Dny
Sampling and Analysis of Private Water Supplies in County Wexford
●Wexford County Council
●Wexford County Council
Compliance (and occasional investigative) sampling and analysis of drinking water for both 'check' and 'audit' parameters as set down by S.I. No. 99/2023 - European Union (Drinking Water) Regulations 2023. Occasional investigative sampling including duplicate samples (coliforms, e.coli free, total chlorine). Reporting of results to Wexford County Council. Accredited analysis required for compliance samples (except free and total chlorine, odour, taste, and Dalapon).
Místo
Wexford, Ireland
Období Služby
2 Years
Termín
21.10.2026 • 16:00
5
Dny
●Gas Networks Ireland
Commercial advisory services for the procurement and contract management of Liquefied Natural Gas (LNG) and other gas commodities.
Místo
Ireland
Období Služby
180 Days
Termín
05.05.2036 • 12:00
3489
Dny
●Gas Networks Ireland
Engineering, procurement, and construction works and services to complete infrastructure assets, including but not limited to: marine jetty structure, marine piling, floating pontoon, mooring & breasting dolphins, fender, trestle, HP gas unloading systems, on-shore gas receiving facility, utility systems, metering, odourisation, venting, pipeline and pig traps, high pressure gas grid connection, connection to existing natural gas network, utility connections for power, water and telecom, integration with FSRU, onshore terminal systems, pre commissioning and commissioning services, and management of nominated subcontractor(s).
Místo
Ireland
Období Služby
28. 07. 2026 - 27. 07. 2036
Termín
25.07.2036 • 12:00
3570
Dny
9884 Qualification System for Surveys
●Iarnród Eireann-Irish Rail
●Iarnród Eireann-Irish Rail
Vergabe eines Qualifikationssystems (QS) für intrusive Untersuchungsleistungen zur Überwachung der Eisenbahninfrastruktur, Küstengebiete und Gebäudeanlagen von Iarnród Éireann.
Místo
Irland
Období Služby
7 Jahre
Termín
21.08.2033 • 12:00
2501
Dny
9612 Qualification System for Tree Felling and Vegetation Removal
●Iarnród Eireann-Irish Rail
●Iarnród Eireann-Irish Rail
Qualifikationssystem für Baumfällung und Vegetationsbeseitigung, einschließlich planmäßiger Arbeiten (Baumpflege) und Notfallarbeiten bei sicherheitskritischen Situationen. Ancilläre Dienstleistungen können erforderlich sein.
Místo
Irland
Období Služby
8 Jahre
Termín
04.09.2031 • 12:00
1784
Dny
Související Zakázky v Stavebnictví
Objevte další příležitosti ve stejném odvětví