Najděte svou dokonalou zakázku.

Vyhledávejte zakázky prostřednictvím společností okamžitě

RU

Rubycon Developments Limited

Stavebnictví

Irsko

Rubycon Developments Limited působí v oboru Stavebnictví.

Zakázky pro Stavebnictví

Oborové shody

Tyto zakázky odpovídají odvětví a zemi společnosti. Uživatelé Premium mohou tuto společnost nárokovat a doplnit chybějící údaje pro přesnější shody. See plan details

Shesknan Bridge Works

●Leitrim County Council_2136

The project involves the replacement/rehabilitation of a single-span road bridge in poor structural condition and has partially collapsed. Works will focus on the replacement of bridge deck and parapet walls, abutment and wingwall re-pointing, vegetation clearance, and associated ancillary works. Shesknan Bridge is a single-span masonry arch bridge of approximately 6m span, supporting a local road crossing over a natural watercourse. The bridge consists of a masonry arch barrel, stone sidewalls and parapets, with a relatively shallow depth of fill material supporting the road surface above. The recommended solution for the bridge is full replacement. This addresses advanced deterioration including reinforcement corrosion, section loss and spalling, which render repair-only strategies uneconomical and short-lived. Additional works are anticipated to include the following: Site mobilisation and establishment, Temporary works and access provision, Demolition of defective components, Parapet, abutment and wingwall works, Vegetation clearance and habitat measures, Road reinstatement, surfacing and safety barrier installation, Final inspection and handover.

Bridge ConstructionCivil EngineeringInfrastructure Works

Místo

Leitrim, Ireland

Období Služby

12 Months

Hodnota zakázky

500 000 €

Termín

20.10.2026 • 12:00

11

Dny

Architect led Integrated design team services for Dublin City Council to deliver the fire Safety remediation of buildings of a variety of uses under Dublin City Council ownership or partial ownership. The single party framework agreement will be established on foot of an initial contract for whole stages (Stage (i) Preliminary – Stage (v) Handover of Works) delivery of professional services in relation to the fire remediation works at a 7 storey mixed use development in Dublin City Centre, consisting of 62 residential apartments, retail units, podium car-park and approximately 3,000sqm of community facilities.

Architectural servicesFire safety remediationIntegrated design team

Místo

Dublin, Ireland

Období Služby

4 Years

Hodnota zakázky

7 000 000 €

Termín

19.10.2026 • 12:00

10

Dny

Coole Park Water Supply Upgrade

●Department of Housing Local Government and Heritage

Installation of a new watermain, water storage tank, treatment shed and service ducting in Coole Park Nature reserve

watermainwater storage tanktreatment shed

Místo

Coole Park Nature reserve, Ireland

Období Služby

3 Months

Hodnota zakázky

500 000 €

Termín

16.10.2026 • 12:00

7

Dny

●Waterford and Wexford Education and Training Board_110494

Supply of Driving Simulators for HGV Rigid and Articulated Trucks, Buses, Forklifts and Vans

Driving SimulatorsHGVTraining

Místo

Dublin, Ireland

Období Služby

4 Years

Hodnota zakázky

1 450 000 €

Termín

21.10.2026 • 12:00

12

Dny

Bridgetown College Wexford - Heating Centre Upgrade

●Waterford and Wexford Education and Training Board_110494

The projects involves the decommissioning and removal of existing oil-fired boiler plant and redundant services and installation of new LPG-fired boiler plant and associated heating centre equipment, with associated works.

constructionheatingboiler

Místo

Wexford, Ireland

Období Služby

18 Months

Hodnota zakázky

290 000 €

Termín

12.10.2026 • 17:00

3

Dny

●Housing and Sustainable Communities Agency

Cost Consultancy and Advisory Services for the Croí Cónaithe (Cities) Scheme

Quantity SurveyingCost ConsultancyAdvisory Services

Místo

Dublin, Ireland

Období Služby

2 Years

Hodnota zakázky

450 000 €

Termín

16.10.2026 • 17:00

7

Dny

Scragh Bog Wooden Boardwalk Removal and Replacement

●Department of Housing Local Government and Heritage

Removal and rebuild by hand a wooden boardwalk of approximately 250 metres in length using FSC Douglas Fir. Removal includes embedded wooden support posts. Rebuild includes 2 No. boardwalk crossings, 3 No. passing points and 4 No. wooden benches

boardwalkconstructionremoval

Místo

Ballynagall, Co. Westmeath, Ireland

Období Služby

3 Months

Hodnota zakázky

250 000 €

Termín

19.10.2026 • 12:00

10

Dny

●Waterford City and County Council_103683

WCWC wish to procure an Architect led multidisciplinary design team for the proposed 'Dungarvan Innovation and Business Development Centre'. The design team will include a Conservation Architect, Civil,/Structural, Mechanical and Electrical Engineers, Quantity Surveyors and a Building Energy consultant.

Design consultancyArchitectureEngineering

Místo

Waterford, Ireland

Období Služby

36 Months

Hodnota zakázky

6 500 000 €

Termín

23.10.2026 • 15:00

14

Dny

Cork City Council wishes to explore the potential for use of district heating in Cork City to cater for heat energy demand whilst contributing to decarbonisation of Ireland's energy sector.

district heatingfeasibility studyenergy efficiency

Místo

Cork, Ireland

Období Služby

12 Months

Hodnota zakázky

250 000 €

Termín

19.10.2026 • 12:00

10

Dny

Phase Three: Forensic Framework

●The Office of the Director of Authorised Intervention Tuam

The Director seeks to establish two multi-party frameworks of specialist service providers to facilitate the excavation (single context method), recovery and analysis of human remains and associated evidence, under forensic control, from the Tuam site in accordance with the Institutional Burials Act 2022 and international best practice.

GeomaticsForensicExcavation

Místo

Dublin, Ireland

Období Služby

36 Months

Hodnota zakázky

2 730 000 €

Termín

16.10.2026 • 12:00

7

Dny

Související Zakázky v Stavebnictví

Objevte další příležitosti ve stejném odvětví

TR5844 - Poolbeg CCGT Auxilliary Boiler Major Replacement

Dublin, Ireland

Termín

09.10.2026

1

Hodina

Doctor Mc Garry Housing Milltown Phase 2

Milltown, County Galway, Ireland

Termín

06.11.2026

28

Dny

National Biorrefinery Pilot Plant painting works

Tipperary, Ireland

Termín

19.10.2026

10

Dny

Grand Canal Greenway Phase 2 For Kildare County Council

Kildare, Ireland

Grand Canal Greenwaytrail wideningtrail resurfacing

Termín

12.11.2026

34

Dny

Electrical Infrastructure Upgrade Works and Establishing a Framework Agreement at St James's Hospital

Dublin, Ireland

Electrical infrastructureUpgrade worksFramework agreement

Termín

05.11.2026

27

Dny

De La Salle College Dundalk, Co. Louth

Dundalk, County Louth, Ireland

school extensionASD unitsite entrance

Termín

26.10.2026

17

Dny

Mechanical and Engineering services to supply and fit new Gas Central Heating System in Scoil Úna Naofa Primary School, Crumlin, Dublin 12.

Crumlin, Dublin 12, Ireland

gas central heatingmechanical servicesengineering services

Termín

06.11.2026

28

Dny

Technical Consultancy Services for Port Access Northern Cross Route (PANCR) Phase 3 - (TII Phases 5-7)

Louth, Ireland

Technical consultancyengineering appraisalroad construction

Termín

02.11.2026

24

Dny

Gracefield Road to Vernon Avenue

Dublin, Ireland

active travel schemeprotected cycle lanespedestrian facilities

Termín

27.10.2026

18

Dny