Najděte svou dokonalou zakázku.

Vyhledávejte zakázky prostřednictvím společností okamžitě

RU

Rubycon Developments Limited

Stavebnictví

Irsko

Rubycon Developments Limited působí v oboru Stavebnictví.

Zakázky pro Stavebnictví

Oborové shody

Tyto zakázky odpovídají odvětví a zemi společnosti. Uživatelé Premium mohou tuto společnost nárokovat a doplnit chybějící údaje pro přesnější shody. See plan details

●Wicklow County Council

Appointment of a main contractor to construct two two-bay fire stations, including office, training and welfare facilities, at Baltinglass and Dunlavin, County Wicklow.

fire stationsconstructionmain contractor

Místo

Baltinglass and Dunlavin, County Wicklow, Ireland

Období Služby

18 months

Hodnota zakázky

6 500 000 €

Termín

12.11.2026 • 12:00

35

Dny

Design and install a solar photovoltaic system, battery energy storage system and two electric vehicle charging points at the National Bioeconomy Pilot Plant in Lisheen.

Solar PVBattery energy storageEV charging points

Místo

Lisheen, County Tipperary, Ireland

Období Služby

8 months

Hodnota zakázky

400 000 €

Termín

30.10.2026 • 14:00

22

Dny

7No. Bed Residential Units at Tierney Street

●St. John of God Housing Association CLG

Construction of seven new residential units at Tierney Street, Ardee, County Louth, for St. John of God Community Services.

residential unitsconstructionbed units

Místo

Ardee, County Louth, Ireland

Období Služby

15 months

Hodnota zakázky

1 700 000 €

Termín

30.10.2026 • 15:00

22

Dny

Construct a new pedestrian and cyclist gateway connection to the Sport Ireland Campus via the Tolka Gateway route, including pathway upgrades, underground utilities, drainage, public lighting, CCTV, retaining structures, site access and associated civil and electrical engineering works.

pedestrian gatewaycyclist connectiondrainage infrastructure

Místo

Dublin, Ireland

Období Služby

4 months

Hodnota zakázky

1 500 000 €

Termín

28.10.2026 • 12:00

20

Dny

Establish a single-supplier framework for the phased supply, delivery, installation and support of an enterprise-grade campus sensing solution. The initial call-off covers anonymous occupancy and space-utilisation sensing in timetabled teaching spaces. The solution must integrate with Trinity College Dublin’s existing enterprise network and information systems. At the authority’s discretion and subject to budget, later call-offs may cover building occupancy, environmental and energy/sub-metering sensing.

campus occupancy sensingspace utilisationsensor installation

Místo

Dublin, Ireland

Období Služby

48 months

Hodnota zakázky

1 000 000 €

Termín

03.11.2026 • 14:00

26

Dny

Provide integrated planning, engineering, environmental, stakeholder-engagement and specialist consultancy services for the Clontarf Flood Defence and Public Realm Project. Initial call-off services cover option identification, scheme development, environmental assessment, statutory consent processes and detailed design, including technical studies, surveys, modelling, assessments, reports, designs and application documentation. The framework may also be used for procurement support, construction-stage, post-consent and other related specialist consultancy services.

integrated design teamflood defenceenvironmental assessment

Místo

Clontarf, Dublin, Ireland

Období Služby

7 years

Hodnota zakázky

7 500 000 €

Termín

15.10.2026 • 12:30

7

Dny

●Pobal

Establish and operate a single-party framework for a GIS mapping solution, providing support, development, maintenance and associated services for current and future requirements. Scope includes GIS infrastructure, ArcGIS platform support, data management, accessibility, integration, analytics, governance and ongoing operational support.

GIS mappingArcGIS supportdata management

Místo

Ireland

Období Služby

4 years

Hodnota zakázky

750 000 €

Termín

02.11.2026 • 11:00

25

Dny

Maintenance, repair, inspection, testing, certification and associated support services for CRC hoisting and care equipment, including overhead and mobile hoists, changing tables, pool hoists, shower trolleys and weighing devices. Supply spare parts and replacement components where required.

maintenancerepairinspection

Místo

Dublin, Ireland

Období Služby

60 months

Hodnota zakázky

96 000 €

Termín

12.11.2026 • 12:00

35

Dny

●Transport Infrastructure Ireland (TII)

Design and construction of the 4 km Luas Green Line extension infrastructure, including track, four stops, Broombridge stabling works, a 350-space Park and Ride, bridges, utilities, road and active-travel works, overhead catenary, power and rail systems, and associated urban realm and ancillary works. Includes systems integration, coordination with other works packages and stakeholders, testing and commissioning.

Luas Finglaslight railtrack

Místo

Dublin, Ireland

Období Služby

54 months

Hodnota zakázky

250 000 000 €

Termín

14.12.2026 • 11:00

67

Dny

Specialist design, supply, installation, testing, commissioning, establishment and aftercare of a hybrid stitched natural grass pitch and complete irrigation system at Dalymount Park. The appointed specialist is intended to be novated to the Works Contractor appointed under PW-CF1.

hybrid natural grass pitchpitch installationirrigation system

Místo

Dublin, Ireland

Období Služby

12 months

Hodnota zakázky

4 400 000 €

Termín

04.11.2026 • 12:00

27

Dny

Související Zakázky v Stavebnictví

Objevte další příležitosti ve stejném odvětví

Electrical Infrastructure Upgrade Works and Establishing a Framework Agreement at St James's Hospital

Dublin, Ireland

Electrical infrastructureUpgrade worksFramework agreement

Termín

05.11.2026

28

Dny

De La Salle College Dundalk, Co. Louth

Dundalk, County Louth, Ireland

school extensionASD unitsite entrance

Termín

26.10.2026

18

Dny

Mechanical and Engineering services to supply and fit new Gas Central Heating System in Scoil Úna Naofa Primary School, Crumlin, Dublin 12.

Crumlin, Dublin 12, Ireland

gas central heatingmechanical servicesengineering services

Termín

06.11.2026

29

Dny

Technical Consultancy Services for Port Access Northern Cross Route (PANCR) Phase 3 - (TII Phases 5-7)

Louth, Ireland

Technical consultancyengineering appraisalroad construction

Termín

02.11.2026

25

Dny

Gracefield Road to Vernon Avenue

Dublin, Ireland

active travel schemeprotected cycle lanespedestrian facilities

Termín

27.10.2026

19

Dny

7No. Bed Residential Units at Tierney Street

Ardee, County Louth, Ireland

residential unitsconstructionbed units

Termín

30.10.2026

22

Dny

Design and Installation of Solar PV Battery Energy Storage System and Two EV Charging Points at the National Bioeconomy Pilot Plant Lisheen

Lisheen, County Tipperary, Ireland

Solar PVBattery energy storageEV charging points

Termín

30.10.2026

22

Dny

TII499 Luas Finglas Main Infrastructure Design and Construction Works

Dublin, Ireland

Luas Finglaslight railtrack

Termín

14.12.2026

67

Dny

New Plumbing Training Workshop at Banagher Further education and Training Centre

Banagher, County Offaly, Ireland

constructiontraining workshopplumbing

Termín

27.10.2026

19

Dny

Dublin City Council Contract for a Reserved Specialist to carry out Pitch Installation for Dalymount Park Redevelopment

Dublin, Ireland

hybrid natural grass pitchpitch installationirrigation system

Termín

04.11.2026

27

Dny

Baltinglass Town Centre Refurbishment Project Phase 1A

Baltinglass, County Wicklow, Ireland

cobble stone footpathssustainable urban drainageunderground utilities

Termín

19.11.2026

42

Dny

WCC472026 Tender for the construction of two new fire stations at Baltinglass and Dunlavin Co. Wicklow

Baltinglass and Dunlavin, County Wicklow, Ireland

fire stationsconstructionmain contractor

Termín

12.11.2026

35

Dny

Sport Ireland Minor Capital Works Multiparty Framework - Call off Competition for Lot 2 Lot 2 Civil Engineering Works

Dublin, Ireland

pedestrian gatewaycyclist connectiondrainage infrastructure

Termín

28.10.2026

20

Dny

Schools Energy Pathfinder 2025 - Biomass Programme - Heating Upgrade and Building Enabling Works Package - Bundle 4 (CMETB)

Border, Ireland

ConstructionHeating UpgradeBiomass Installation

Termín

22.10.2026

14

Dny