Najděte svou dokonalou zakázku.

Vyhledávejte zakázky prostřednictvím společností okamžitě

RE

Reynolds Surveying

Stavebnictví

Navan, Meath, Irsko
GP PracticeGeneral PracticeMedical Card

Odpovídající zakázky

Celbridge Hazelhatch Mobility Corridor (Phase 5 to 7)

Kildare County Council_385

Detailed Design, Construction Administration and Project Handover of all scheme works, as approved or modified by An Coimisiún Pleanála. Approximately 2.0 km of new single carriageway mobility corridor extending from the R403 Clane Road to the R405 Hazelhatch Road, incorporating high quality active travel provision throughout. A new 66m long clear span bridge crossing of the River Liffey, designed in accordance with relevant Eurocodes and OPW requirements, with no in stream works required. Segregated footpaths and cycle facilities provided along the full length of the route, including: 2.0m wide one way cycle tracks and 2.0 m wide footpaths on both sides of the carriageway for the majority of the corridor; and a 3.0 m wide two way cycle track and footpath on constrained sections approaching Hazelhatch and Celbridge Train Station. New and upgraded junctions including signalised junctions at the R403 Clane Road, Newtown Road and R405 Hazelhatch Road, together with a priority junction at Simmonstown Manor Road and improvements to the Loughlinstown Road roundabout. Public lighting, drainage and SuDS infrastructure, including roadside drainage systems and attenuation features designed to limit discharge to greenfield run off rates and improve existing flood risk conditions. Landscaping, planting and biodiversity measures, including native species woodland and hedgerow planting, tree planting and integration of sustainable drainage features, delivering a net biodiversity gain along the corridor. Utility diversions, protections and accommodation works, including foul and surface water drainage infrastructure, watermains, ESB, Gas Networks and telecommunications assets, as required to facilitate delivery of the scheme. The Consultant shall undertake an Infrastructure Review in conjunction with Kildare County Council, relevant utility providers and other key stakeholders. All environmental mitigation, monitoring and reporting required under the Appropriate Assessment process, Natura Impact Statement, Flood Risk Assessment, and associated environmental and technical assessments accompanying the Section 177AE application.

Civil EngineeringHighways ConsultancyBridge Design

Místo

Ireland

Období Služby

39 Months

Maximální Hodnota

300.000 €

Termín

25.08.202614:00

25

Dny

LiDAR and orthoimagery services for National Parks and Wildlife Service (NPWS), Department of Housing, Local Government and Heritage NPWS (DHLGH)

Department of Housing Local Government and Heritage

Bereitstellung von LiDAR- und Orthofotodiensten für den National Parks and Wildlife Service (NPWS) der Department of Housing, Local Government and Heritage, für Zwecke der ökologischen und ingenieurtechnischen Kartierung für eine Reihe von Überwachungs- und Managementprojekten und -programmen.

LiDAROrthofotografieKartierung

Místo

Dublin, Irland

Období Služby

4 Jahre

Maximální Hodnota

4.600.000 €

Termín

05.08.202613:00

5

Dny

Asbestos Surveys in PMVT buildings/locations

Peter McVerry Trust_121127

By understanding the volume of asbestos present in properties, PMVT can proactively manage and hold an up to date register of known asbestos within our stock while also giving the ability to put in place appropriate safeguards and plan for future safety works to manage the issue if and when required.

AsbestosSurveyingSafety

Místo

Ireland

Období Služby

48 Months

Termín

19.08.202615:30

19

Dny

Engineering and Environmental Consultancy Services for Nenagh Flood Relief Scheme

Tipperary County Council

Identification, design and submission for planning consent of a Flood Relief Scheme, completion of detailed design, and procurement, management and oversight of the construction of the Scheme. Tasks include engineering and environmental consultancy services.

EngineeringEnvironmentalFlood Relief

Místo

Ireland

Období Služby

108 Months

Maximální Hodnota

3.000.000 €

Termín

02.09.202610:00

33

Dny

TEN2600112 - cFT for Integrated Design Team for the Development of the Bailieborough Town Centre Regeneration Scheme (Stages (i) to (ii) for Cavan County Council

Cavan County Council

Zivilingenieurberatungsleistungen und architektonische Dienstleistungen für die Entwicklung des Regenerierungsschemas für das Bailieborough Town Centre (Stufen i und ii).

ZivilingenieurwesenArchitekturStadtplanung

Místo

Cavan, Irland

Období Služby

18 Monate

Termín

07.08.202610:00

7

Dny

The provision of Technical and Regulatory Consultancy Support for Gas Energy Safety

Commission for Regulation of Utilities

Die Bereitstellung von technischer und regulatorischer Beratung für die Gasenergiesicherheit, einschließlich technischer Unterstützung für die Teams GSF, SSB Operations und P and P zur effizienten und effektiven Funktionsweise des Gas-Sicherheitsrahmens und der Überwachung der GSSB.

Regulatorische BeratungGasenergieTechnische Analyse

Místo

Dublin, Irland

Období Služby

48 Monate

Maximální Hodnota

2.400.000 €

Termín

31.07.202610:00

12

Hodiny

Související Zakázky v Stavebnictví

Objevte další příležitosti ve stejném odvětví

Works Contractor PSCS and PSDP - Contractor Design and Build (PWCF2) - Development of 36no. homes and community centre at Mill Lane, Leixlip, Co. Kildare

Leixlip, Irland

BauarbeitenWohnungsbauGemeinschaftszentrum

Termín

04.09.2026

35

Dny

Enabling works for new glasshouse at Glenveagh National Park

West, Irland

BauarbeitenNeubauSanierung

Termín

03.09.2026

34

Dny

Dublin City Council - Contract for Dodder Greenway Milltown Road - Dodder Walk to Dundrum Road Active Travel Scheme

Dublin, Irland

BauarbeitenRadinfrastrukturFußwege

Termín

27.08.2026

28

Dny

Arranmore/Árainn Mhór Slipway Repairs 2026 - Donegal County Council

Arranmore Island, Ireland

Pier constructionSlipway repairsMarine works

Termín

20.08.2026

20

Dny

Daisy Building Enhancement carried out by Donegal County Council

Carndonagh, Irland

BauarbeitenSanierungZäune

Termín

28.08.2026

28

Dny

26/034 - A Qualification System for the provision of Engineering, Procurement, Construction, Operation and Maintenance Services for the Strategic Gas Emergency Reserve

Ireland

Marine constructionGas infrastructureEPC works

Termín

25.07.2036

3647

Dny

Fire Compliance Works to 82 number apartments over two phases at Rochdale, Claremount Avenue, Honey Park, Dun Laoghaire, Dublin.

Dublin, Irland

FeuerwehrBauarbeitenMehrfamilienhaus

Termín

01.09.2026

33

Dny

Construction of SEN Extension to Clarecastle National School

Clarecastle, Irland

SchulbauSEN-ErweiterungNeubau

Termín

28.08.2026

28

Dny

Design, Construction and Delivery of Cherry Orchard (Affordable for Sale) Housing Development (Pro405)

Dublin, Irland

BauWohnungsbauNeubau

Termín

25.08.2026

25

Dny

DCC - Home Building Programme Contractor Multi Party Framework Agreement in 2 Lots A and B

Dublin, Ireland

Housing ConstructionDesign and BuildSocial Housing

Termín

26.08.2026

26

Dny

Ballycoolin Bus Depot Design and Build

Dublin, Ireland

Bus DepotConstructionDesign and Build

Termín

28.08.2026

28

Dny

St. Ciaran's Community School Kells

Kells, Irland

Elektrische InstallationNotbeleuchtungFeueralarm

Termín

13.08.2026

13

Dny

Carrick on Shannon Parks Project (Transformation of 4 Urban Green Areas) in Carrick on Shannon, Co Leitrim

Carrick on Shannon, Irland

ArchitekturLandschaftsplanungStadtentwicklung

Termín

07.09.2026

38

Dny

Construction of extensions at Mooncoin Junior and Senior Schools Scoil Mhuire NS Mooncoin Co. Waterford

Mooncoin, Irland

SchulbauErweiterungBauarbeiten

Termín

21.08.2026

21

Dny

Refurbishment and Extension of New Ross Library

Ireland

BauarbeitenSanierungErweiterung

Termín

17.08.2026

17

Dny