Najděte svou dokonalou zakázku.
Vyhledávejte zakázky prostřednictvím společností okamžitě
O'Carroll Engineering působí v oboru Stavebnictví. Sídlo: Killarney, County Kerry.
Produkty a služby
- Listy (stavebnictví)
- Schodiště
- Instalace a montáž zábradlí
- Práce na fasádách
- Poradenství v oblasti pozemního stavitelství
- Projektování nosných konstrukcí
Odpovídající zakázky
Provide an architect-led multidisciplinary team for pyrite remediation and other building and surrounding-area works at Darndale Regional Youth Facility. Lead preliminary design through handover, including certification, employer representation, health and safety coordination, engineering, fire safety and quantity surveying. Design and coordinate temporary decant accommodation required to maintain youth services during construction.
Místo
Dublin 17, Ireland
Období Služby
42 months
Hodnota zakázky
300 000 €
Termín
20.10.2026 • 12:00
4
Dny
Procurement for an Integrated Design Team to deliver a 5 bedroom Community Dwelling at Milepost, Slieverue, Co Kilkenny
●Belmont Park Housing Association
●Belmont Park Housing Association
Provide an integrated design team for a five-bedroom community bungalow on a greenfield site in Milepost, Slieverue. Deliver full services from stage (ii) Design through stage (v) Handover, progressing the project through construction.
Místo
Kilkenny, Ireland
Období Služby
34 months
Hodnota zakázky
90 000 €
Termín
13.11.2026 • 12:00
28
Dny
●Fingal County Council_371
Design and build 21 units, including associated site works at Fortlawn Estate, Blanchardstown, Dublin 15.
Místo
Blanchardstown, Dublin, Ireland
Období Služby
32 months
Hodnota zakázky
7 500 000 €
Termín
10.11.2026 • 12:00
25
Dny
●Health Service Executive (HSE)
Provide building services (mechanical and electrical) consultancy for decentralizing the campus central heating system at University Hospital Galway, through the existing Zone B Enabling Works Framework.
Místo
Galway, Ireland
Období Služby
42 months
Hodnota zakázky
160 000 €
Termín
02.11.2026 • 12:00
17
Dny
●Health Service Executive (HSE)
Provide civil and structural engineering consultancy for decentralizing the campus central heating system at University Hospital Galway, under the existing Zone B Enabling Works Framework.
Místo
University Hospital Galway, Galway, Ireland
Období Služby
42 months
Hodnota zakázky
160 000 €
Termín
02.11.2026 • 12:00
17
Dny
●Health Service Executive (HSE)
MULTI-PARTY FRAMEWORK AGREEMENT FOR HSE DESIGN TEAM SERVICES FRAMEWORK 2024 – FRAMEWORK 02: ACUTE HEALTHCARE CAPITAL WORKS – PROJECT VALUE €1M -€15M EXCL. VAT. This framework will include the following design team disciplines (Lots): Lot 1: Architect(AR) as Principal Service Provider with the following Specialists domestic sub-consultants, or in-house specialisms: a. Planner (PL), b. Project Supervisor Design Process (PSDP), c. Fire Safety Consultant (FSC) and d. BIM Information Manager(BIM). The Health Services Executive (HSE) invites expressions of interest, under the Restricted Procedure, from suitably qualified services providers for the provision of design team services (including Specialist Skills Providers) per the above Lot listing for which it is proposed to establish a Multi-Party Framework Agreement for each Lot type to award call-off contracts for Acute Healthcare Capital Works – project value €1M-€15M excl. VAT within HSE North West Area Please note that the INITIAL project forming Framework 02 for this regional / sub¬regional office NW West Area will be: Proposed Microbiology Lab incorporating ancillary site works, plus enabling work to divert existing services at Sligo University Hospital.
Místo
Sligo, Ireland
Období Služby
48 Months
Hodnota zakázky
4 200 000 000 €
Termín
30.10.2026 • 12:00
14
Dny
●Dublin City Council
The Contracting Authority, Dublin City Council, intends to establish a Single Party Framework Agreement with a Integrated Design Team to deliver planning, engineering, environmental, stakeholder engagement and other specialist consultancy services for the Clontarf Flood Defence and Public Realm Project (CFDPRP). The Project is located along the Clontarf waterfront in Dublin and encompasses a highly sensitive coastal environment adjoining designated European sites, including Special Areas of Conservation (SAC) and Special Protection Areas (SPA). The Project has been initiated to address existing and future coastal and surface water flood risks while delivering a coordinated programme of public realm enhancement, active travel improvements and environmental benefits. The scheme shall be developed through an integrated design approach that balances flood resilience, climate adaptation, biodiversity, heritage, placemaking, sustainable mobility, environmental protection and stakeholder aspirations. The initial call-off contract under the Framework will require the successful Applicant to undertake all services necessary to develop the Project from commencement through option identification, scheme development, environmental assessment, statutory consent processes and detailed design. This shall include the preparation of all technical studies, surveys, modelling, assessments, reports, designs and application documentation required to secure the necessary approvals and to progress the Project to a stage suitable for procurement and construction. The Framework Agreement may subsequently be utilised by the Contracting Authority to procure additional related services, including procurement support, construction-stage services, post-consent services and other specialist consultancy services associated with the delivery of the Project. The successful Applicant shall be required to develop a fully integrated and coordinated scheme that delivers flood protection, surface water management, active travel and public realm objectives within a single coherent design solution that is environmentally sensitive, climate resilient and appropriate to the strategic importance of the Clontarf waterfront.
Místo
Dublin, Ireland
Období Služby
7 Years
Hodnota zakázky
7 500 000 €
Termín
30.10.2026 • 12:00
14
Dny
9843 Design and Build Capacity Enhancement Works at Connolly Station
●Iarnród Eireann-Irish Rail
●Iarnród Eireann-Irish Rail
Design and Build Contractor to complete the design and deliver capacity enhancement and transformation works at Connolly Station. The project will create a new entrance from Preston Street and a passenger concourse within the historic Victorian undercroft, together with new lifts, escalators and staircases providing improved access to Platforms 5, 6 and 7. The works will also include additional emergency escape routes, public-realm improvements, retail, operational and back-of-house spaces, heritage refurbishment, structural alterations and the installation or modification of station and railway systems. The successful Contractor will be required to review and develop the reference design through detailed design to Approved for Construction status and subsequently construct, test and commission the works. The Contractor will also be responsible for providing complete as-built and handover information. The project will be delivered within a constrained, live operational railway environment. The Contractor will be required to manage passenger circulation, railway access, construction phasing, safety assurance, stakeholder engagement, heritage requirements and interfaces with other DART+ contracts. The appointed Contractor will undertake the role of Project Supervisor for the Construction Stage.
Místo
Dublin, Ireland
Období Služby
42 Months
Hodnota zakázky
34 000 000 €
Termín
20.11.2026 • 12:00
35
Dny
Killeen and Feenune Bridge Barrier Mitigation Project
●Inland Fisheries Ireland
●Inland Fisheries Ireland
Inland Fisheries Ireland is seeking to procure multidisciplinary consultancy services to assist with the delivery of two Barrier Mitigation Projects: Killeen Bridge and Feenune Bridge near Louisburgh in Co. Mayo, through the completion of Phases 1 to 3. The appointed Consultant will undertake all necessary engineering, environmental and planning services required to progress the project through feasibility, option selection, and statutory consent stages in accordance with the Planning and Development Acts 2000–2023, the Capital Works Management Framework, and Infrastructure Guidelines 2023. The Barrier Mitigation Projects aim to mitigate the impacts of the identified barriers on fish passage and restore more natural river processes along the associated rivers. The commission forms a specific action under Ireland’s Water Action Plan 2024 and supports implementation of the National Barrier Mitigation Programme to deliver improved ecological status under the EU Water Framework Directive. The Consultant will act as the Designer, Project Supervisor Design Process during Phases 1 to 3 of the project and carry out all related necessary duties.
Místo
Galway, Mayo, Ireland
Období Služby
10 Months
Hodnota zakázky
75 000 €
Termín
21.10.2026 • 12:00
5
Dny
Multidisciplinary Services for Castletroy Link Road, Limerick Scheme - NTA Stages 5-7
●Limerick City and County Council_103432
●Limerick City and County Council_103432
Construct a new distributor road of approximately 680m in length with a cross-section consisting of 9.7m wide carriageway (consisting of 2 x 3.1m traffic lanes) including a 3.5m wide bus lane, footpaths, segregated cycletrack, planted verges with 1 in 2 road embankment side slopes. Upgrading of both the Schoolhouse Road/Golf Links Road junction and the Kilbane roundabout to a signalised protected junction arrangement.
Místo
Limerick, Ireland
Období Služby
40 Months
Hodnota zakázky
1 500 000 €
Termín
23.10.2026 • 12:00
7
Dny
Související Zakázky v Stavebnictví
Objevte další příležitosti ve stejném odvětví