Najděte svou dokonalou zakázku.

Vyhledávejte zakázky prostřednictvím společností okamžitě

HG

HG Construction Ire

Stavebnictví

Watergrasshill, Cork, Irsko
construction servicespharmaceuticalhealthcare

Odpovídající zakázky

Emergency Works (Co. Wicklow Schools)

Kildare and Wicklow Education and Training Board

Architectural Consultancy Services projects comprising of * Improving Disability Access to the Main Entrance in Glenart College, Arklow, Co. Wicklow. * Roof repair works on the main school building and sports hall in Avondale Community College, Rathdrum, Co. Wicklow.

ArchitekturNotfallmaßnahmenSchulen

Místo

Dublin, Irland

Období Služby

18 Monate

Maximální Hodnota

85.000 €

Termín

23.08.202621:45

23

Dny

Emergency Works (Co. Kildare Schools)

Kildare and Wicklow Education and Training Board

Architectural Consultancy Services for emergency works including: repair of defective render at Athy Community College, replacement and automation of doors at Ard Scoil Rath Iomghain, and roof repair works to prefabricated buildings and the PE hall at Ard Scoil Rath Iomghain.

Architectural servicesEmergency worksSchools

Místo

Ireland

Období Služby

18 Months

Maximální Hodnota

47.000 €

Termín

23.08.202621:45

23

Dny

9840 Design and Build Enabling Works at the DART+ and MetroLink Interface at Glasnevin

Iarnród Eireann-Irish Rail

Design and Build of Enabling Works at the DART+ and MetroLink Interface at Glasnevin, Dublin, to facilitate the construction of MetroLink. Includes detailed design and construction of key enabling works such as site preparation, demolition, excavation, earthmoving, drainage, railway construction works, and associated civil engineering tasks.

ConstructionRailwayDesign and Build

Místo

Dublin, Ireland

Období Služby

5 Years

Maximální Hodnota

200.000.000 €

Termín

25.08.202610:00

25

Dny

Celbridge Hazelhatch Mobility Corridor (Phase 5 to 7)

Kildare County Council_385

Detailed Design, Construction Administration and Project Handover of all scheme works, as approved or modified by An Coimisiún Pleanála. Approximately 2.0 km of new single carriageway mobility corridor extending from the R403 Clane Road to the R405 Hazelhatch Road, incorporating high quality active travel provision throughout. A new 66m long clear span bridge crossing of the River Liffey, designed in accordance with relevant Eurocodes and OPW requirements, with no in stream works required. Segregated footpaths and cycle facilities provided along the full length of the route, including: 2.0m wide one way cycle tracks and 2.0 m wide footpaths on both sides of the carriageway for the majority of the corridor; and a 3.0 m wide two way cycle track and footpath on constrained sections approaching Hazelhatch and Celbridge Train Station. New and upgraded junctions including signalised junctions at the R403 Clane Road, Newtown Road and R405 Hazelhatch Road, together with a priority junction at Simmonstown Manor Road and improvements to the Loughlinstown Road roundabout. Public lighting, drainage and SuDS infrastructure, including roadside drainage systems and attenuation features designed to limit discharge to greenfield run off rates and improve existing flood risk conditions. Landscaping, planting and biodiversity measures, including native species woodland and hedgerow planting, tree planting and integration of sustainable drainage features, delivering a net biodiversity gain along the corridor. Utility diversions, protections and accommodation works, including foul and surface water drainage infrastructure, watermains, ESB, Gas Networks and telecommunications assets, as required to facilitate delivery of the scheme. The Consultant shall undertake an Infrastructure Review in conjunction with Kildare County Council, relevant utility providers and other key stakeholders. All environmental mitigation, monitoring and reporting required under the Appropriate Assessment process, Natura Impact Statement, Flood Risk Assessment, and associated environmental and technical assessments accompanying the Section 177AE application.

Civil EngineeringHighways ConsultancyBridge Design

Místo

Ireland

Období Služby

39 Months

Maximální Hodnota

300.000 €

Termín

25.08.202614:00

25

Dny

Piltown Town Centre Regeneration, Co. Kilkenny

Kilkenny County Council_1185

Provision of EV charging and Parking bays and urban renewal enhancement over c.340m of road corridor and 2 no. minor arm approaches. Includes drainage, paving, footpath construction, installation of street furniture, and electrical installation work for EV chargers.

ConstructionEV ChargingRoad Works

Místo

Kilkenny, Ireland

Období Služby

12 Months

Termín

01.09.202610:00

32

Dny

Development of a New NPWS Visitor Park Centre for The Burren National Park

Department of Housing Local Government and Heritage

Provision of Architect or Engineer led Design Team Consultancy Services for development at 1-2 Riverview, Church Street, Newtown, Corofin, Co Clare V95 ANP8. The development will consist of: The demolition of 1-2 Riverview buildings and associated outbuildings and boundary wall and the development of a single storey NPWS Visitor Centre for The Burren National Park, 3 storey NPWS office building, car parking facilities with associated vehicle access points and ramp and all associated site development, boundary and landscaping works.

ArchitekturBauentwurfPlanung

Místo

Corofin, Irland

Období Služby

50 Monate

Termín

21.08.202610:00

21

Dny

Multi-Party Framework for Bridge Rehabilitation Consultancy Services, Assessment, Design and Inspection for Offaly County Council - Initial Contract - Boyne Bridge and Raheenakeeran Bridge Co. Offaly

Offaly County Council_448

Multi-Party Framework for Bridge Rehabilitation Consultancy Services, Assessment, Design and Inspection for Offaly County Council - Initial Contract - Boyne Bridge and Raheenakeeran Bridge Co. Offaly. Design Consultancy Services (Stages ii to v)

Bridge rehabilitationStructural engineeringDesign consultancy

Místo

Ireland

Období Služby

60 Months

Maximální Hodnota

2.000.000 €

Termín

14.08.202614:00

14

Dny

Assigned Certifier Services for the Department of Education and Youth Lot 09 Design and Build projects

Department of Education and Youth

Zertifizierungsdienstleistungen für das Ministerium für Bildung und Jugend für Projekte im Rahmen des Design-and-Build-Schulen-Mehrpartei-Auftragsrahmens Nummer 1 2020-2021 gemäß den Vorschriften zur Baugenehmigung (Änderung).

ZertifizierungsdienstleistungenBauarbeitenDesign and Build

Místo

Dublin, Irland

Období Služby

24 Monate

Termín

20.08.202610:00

20

Dny

Request for Tender for Architect Led Multi-Disciplinary Design and Cost Management Team for New Airfield Vehicle Entry Screening Post, Associated Infrastructure and Ancillary Works at Shannon Airport

Shannon Airport Authority DAC

Architectural and related services, engineering design, cost management for new airfield vehicle entry screening post, associated infrastructure and ancillary works at Shannon Airport.

ArchitekturIngenieurwesenInfrastruktur

Místo

Shannon, Ireland

Období Služby

28 Months

Termín

24.08.202611:00

24

Dny

Air Handling Unit and Chiller Installation at Beaumont Hospital

Beaumont Hospital_403

Installation and commissioning of a new air handling unit and chiller within the Hospital's existing V6b plantroom and chiller compound. The appointed contractor will act as PSCS for the project.

Mechanical EngineeringHVAC InstallationChiller Installation

Místo

Dublin, Ireland

Období Služby

24 Months

Termín

10.08.202610:00

10

Dny

1 / 2

Související Zakázky v Stavebnictví

Objevte další příležitosti ve stejném odvětví

FIN-21 - Architectural and Project Management Services

Dublin, Irland

ArchitekturProjektmanagementBüroumbau

Termín

28.08.2026

28

Dny

SCOIL CROINE NATIONAL SCHOOL

Donegal, Irland

EntwässerungSportplatzSanierung

Termín

19.08.2026

19

Dny

Fit out of Roanmore unit in Waterford for Corlann

Waterford, Irland

BauausführungInnenausbauTagesservice

Termín

03.09.2026

34

Dny

IDA Parkmore Biodiversity Enhancement Proje

Oranmore, County Galway, Irland

LandschaftsgestaltungBiodiversitätPflanzung

Termín

28.08.2026

28

Dny

Daisy Building Enhancement carried out by Donegal County Council

Carndonagh, Irland

BauarbeitenSanierungZäune

Termín

28.08.2026

28

Dny

26/034 - A Qualification System for the provision of Engineering, Procurement, Construction, Operation and Maintenance Services for the Strategic Gas Emergency Reserve

Ireland

Marine constructionGas infrastructureEPC works

Termín

25.07.2036

3647

Dny

Enabling works for new glasshouse at Glenveagh National Park

West, Irland

BauarbeitenNeubauSanierung

Termín

03.09.2026

34

Dny

Fire Compliance Works to 82 number apartments over two phases at Rochdale, Claremount Avenue, Honey Park, Dun Laoghaire, Dublin.

Dublin, Irland

FeuerwehrBauarbeitenMehrfamilienhaus

Termín

01.09.2026

32

Dny

Works Contractor PSCS and PSDP - Contractor Design and Build (PWCF2) - Development of 36no. homes and community centre at Mill Lane, Leixlip, Co. Kildare

Leixlip, Irland

BauarbeitenWohnungsbauGemeinschaftszentrum

Termín

04.09.2026

35

Dny

Arranmore/Árainn Mhór Slipway Repairs 2026 - Donegal County Council

Arranmore Island, Ireland

Pier constructionSlipway repairsMarine works

Termín

20.08.2026

20

Dny

Dublin City Council - Contract for Dodder Greenway Milltown Road - Dodder Walk to Dundrum Road Active Travel Scheme

Dublin, Irland

BauarbeitenRadinfrastrukturFußwege

Termín

27.08.2026

27

Dny

Ballycoolin Bus Depot Design and Build

Dublin, Ireland

Bus DepotConstructionDesign and Build

Termín

28.08.2026

28

Dny

Design, Construction and Delivery of Cherry Orchard (Affordable for Sale) Housing Development (Pro405)

Dublin, Irland

BauWohnungsbauNeubau

Termín

25.08.2026

25

Dny

DCC - Home Building Programme Contractor Multi Party Framework Agreement in 2 Lots A and B

Dublin, Ireland

Housing ConstructionDesign and BuildSocial Housing

Termín

26.08.2026

26

Dny

Construction of SEN Extension to Clarecastle National School

Clarecastle, Irland

SchulbauSEN-ErweiterungNeubau

Termín

28.08.2026

28

Dny