Najděte svou dokonalou zakázku.

Vyhledávejte zakázky prostřednictvím společností okamžitě

DR

DriveX

Energie, veřejné služby a nakládání s odpady

Irsko

DriveX působí v oboru Energie, veřejné služby a nakládání s odpady.

Zakázky pro Energie, veřejné služby a nakládání s odpady

Oborové shody

Tyto zakázky odpovídají odvětví a zemi společnosti. Uživatelé Premium mohou tuto společnost nárokovat a doplnit chybějící údaje pro přesnější shody. See plan details

Provide integrated planning, engineering, environmental, stakeholder-engagement and specialist consultancy services for the Clontarf Flood Defence and Public Realm Project. Initial call-off services cover option identification, scheme development, environmental assessment, statutory consent processes and detailed design, including technical studies, surveys, modelling, assessments, reports, designs and application documentation. The framework may also be used for procurement support, construction-stage, post-consent and other related specialist consultancy services.

integrated design teamflood defenceenvironmental assessment

Místo

Clontarf, Dublin, Ireland

Období Služby

7 years

Hodnota zakázky

7 500 000 €

Termín

15.10.2026 • 12:30

8

Dny

●Transport Infrastructure Ireland (TII)

Provide Soft Facilities Management services for MetroLink, including two reception staff and two facilities assistants for the Coopers Cross office; cleaning and consumables; coffee-machine rental, servicing and maintenance and coffee supplies; stationery and office supplies; courier, taxi, postal and franking services; canteen supplies; confidential shredding; facilities equipment maintenance; fire extinguisher and first-aid equipment maintenance and smoke-detector servicing in MetroLink-controlled areas; Zip Tap maintenance and CO2 supply; and further Soft FM support for future MetroLink site offices.

Soft Facilities Managementcleaning servicesfacilities assistants

Místo

Dublin, Ireland

Období Služby

72 months

Hodnota zakázky

2 860 000 €

Termín

03.11.2026 • 12:00

27

Dny

Design and install a solar photovoltaic system, battery energy storage system and two electric vehicle charging points at the National Bioeconomy Pilot Plant in Lisheen.

Solar PVBattery energy storageEV charging points

Místo

Lisheen, County Tipperary, Ireland

Období Služby

8 months

Hodnota zakázky

400 000 €

Termín

30.10.2026 • 14:00

23

Dny

Provision Of CCTV services for the purposes Of prevention, detection and prosecution under the Litter Pollution Acts 1997 (as amended) Waste Management Act 1996 (as amended), and the Circular Economy.

CCTVSecuritySurveillance

Místo

Wexford, Ireland

Období Služby

2 Years

Termín

22.10.2026 • 16:00

15

Dny

●Gas Networks Ireland

Supply and Rental of Cylinder Gases. The objective is to qualify Applicants onto the Qualification System for the supply of gases including Helium, Methane, and Hydrogen.

Industrial gasesCylinder GasesSupply

Místo

Dublin, Ireland

Období Služby

120 Months

Termín

21.04.2034 • 12:00

2753

Dny

●Department of Housing Local Government and Heritage

This CfT seeks a suitably qualified contractor to develop a nature restoration framework for studying how a new, predominantly state-funded approach, administered by an entity/Department other than the Department of Agriculture, Food and the Marine (DAFM), could provide genuine additionality to relevant current land use policies and programmes, e.g. CAP. How should a new framework to support nature restoration and conservation be designed, structured, and administered to provide genuine additionality and complementarity to the Common Agricultural Policy 2028-2034, and other relevant national funding streams, while ensuring seamless delivery for farmers and public and private landowners whilst safeguarding public and European funding accountability.

nature restorationresearch servicesland use programmes

Místo

Wexford, Ireland

Období Služby

18 Months

Hodnota zakázky

55 000 €

Termín

02.11.2026 • 15:00

26

Dny

The Contracting Authority, Dublin City Council, intends to establish a Single Party Framework Agreement with a Integrated Design Team to deliver planning, engineering, environmental, stakeholder engagement and other specialist consultancy services for the Clontarf Flood Defence and Public Realm Project (CFDPRP). The Project is located along the Clontarf waterfront in Dublin and encompasses a highly sensitive coastal environment adjoining designated European sites, including Special Areas of Conservation (SAC) and Special Protection Areas (SPA). The Project has been initiated to address existing and future coastal and surface water flood risks while delivering a coordinated programme of public realm enhancement, active travel improvements and environmental benefits. The scheme shall be developed through an integrated design approach that balances flood resilience, climate adaptation, biodiversity, heritage, placemaking, sustainable mobility, environmental protection and stakeholder aspirations. The initial call-off contract under the Framework will require the successful Applicant to undertake all services necessary to develop the Project from commencement through option identification, scheme development, environmental assessment, statutory consent processes and detailed design. This shall include the preparation of all technical studies, surveys, modelling, assessments, reports, designs and application documentation required to secure the necessary approvals and to progress the Project to a stage suitable for procurement and construction. The Framework Agreement may subsequently be utilised by the Contracting Authority to procure additional related services, including procurement support, construction-stage services, post-consent services and other specialist consultancy services associated with the delivery of the Project. The successful Applicant shall be required to develop a fully integrated and coordinated scheme that delivers flood protection, surface water management, active travel and public realm objectives within a single coherent design solution that is environmentally sensitive, climate resilient and appropriate to the strategic importance of the Clontarf waterfront.

Civil engineering consultancyFlood defencePublic realm

Místo

Dublin, Ireland

Období Služby

7 Years

Hodnota zakázky

7 500 000 €

Termín

30.10.2026 • 12:00

23

Dny

●Gas Networks Ireland

Supply and maintenance of instrumentation calibration equipment. The objective of this QSQ is to qualify Applicants onto the Qualification System.

calibrationinstrumentationmaintenance

Místo

Dublin, Ireland

Období Služby

120 Months

Termín

09.11.2033 • 12:00

2590

Dny

●IDA Ireland

IDA Ireland supports eligible client sustainability investments through its Green Capital programme. As part of IDA Ireland's investment approval process for Green Capital projects, an independent technical assessment is required to review the technical basis of each project and to validate or re-quantify its expected environmental impact. To date, technical assessments have been completed by a number of different assessors. As the volume and range of Green Capital investments increase, IDA Ireland requires a more consistent and scalable framework to support these technical reviews. IDA Ireland is seeking to appoint one service provider with the capability to manage and deliver all IDA Green Capital Technical Assessment services covered by this RFT. These will cover pre-investment technical assessments and post-investment Measurement and Verification (M and V) assessments.

Environmental indicators analysisTechnical assessmentsGreen Capital

Místo

Dublin, Ireland

Období Služby

48 Months

Hodnota zakázky

700 000 €

Termín

02.11.2026 • 12:00

26

Dny

●Inland Fisheries Ireland

Inland Fisheries Ireland is seeking to procure multidisciplinary consultancy services to assist with the delivery of two Barrier Mitigation Projects: Killeen Bridge and Feenune Bridge near Louisburgh in Co. Mayo, through the completion of Phases 1 to 3. The appointed Consultant will undertake all necessary engineering, environmental and planning services required to progress the project through feasibility, option selection, and statutory consent stages in accordance with the Planning and Development Acts 2000–2023, the Capital Works Management Framework, and Infrastructure Guidelines 2023. The Barrier Mitigation Projects aim to mitigate the impacts of the identified barriers on fish passage and restore more natural river processes along the associated rivers. The commission forms a specific action under Ireland’s Water Action Plan 2024 and supports implementation of the National Barrier Mitigation Programme to deliver improved ecological status under the EU Water Framework Directive. The Consultant will act as the Designer, Project Supervisor Design Process during Phases 1 to 3 of the project and carry out all related necessary duties.

Engineering servicesBarrier MitigationFish passage

Místo

Galway, Mayo, Ireland

Období Služby

10 Months

Hodnota zakázky

75 000 €

Termín

21.10.2026 • 12:00

14

Dny

Související Zakázky v Energie, veřejné služby a nakládání s odpady

Objevte další příležitosti ve stejném odvětví

Dublin City Council Single Party Framework Agreement for an Integrated Design Team for the Clontarf Flood Defence and Public Realm Project

Clontarf, Dublin, Ireland

integrated design teamflood defenceenvironmental assessment

Termín

15.10.2026

8

Dny

Green Capital Grant - Technical Assessments

Dublin, Ireland

Environmental indicators analysisTechnical assessmentsGreen Capital

Termín

02.11.2026

26

Dny

To provide a Wildfire-Resilient Landscape Assessment plan in Killarney National

Ireland

WildfireLandscape AssessmentKillarney National Park

Termín

26.10.2026

19

Dny

Waste Management 2026

Ireland

waste collectionrecyclingdisposal services

Termín

30.10.2026

23

Dny

Servicing, Collection, Transportation and Recycling of Glass and Aluminium Can Bring Banks for Leitrim County Council

Leitrim, Ireland

Refuse recyclingGlass collectionAluminium recycling

Termín

16.10.2026

9

Dny

Collection and Disposal of Category 1 Waste from Dublin Airport Passenger Terminals and Airside Stables

Dublin, Ireland

waste disposalcategory 1 wastedublin airport

Termín

23.10.2026

16

Dny

Dublin City Council Single Party Framework Agreement for an Integrated Design Team for the Clontarf Flood Defence and Public Realm Project

Dublin, Ireland

Civil engineering consultancy servicesIntegrated Design TeamFlood Defence

Termín

15.10.2026

8

Dny