Najděte svou dokonalou zakázku.
Vyhledávejte zakázky prostřednictvím společností okamžitě
Barry Transportation
Doprava
Odpovídající zakázky
Celbridge Hazelhatch Mobility Corridor (Phase 5 to 7)
●Kildare County Council_385
●Kildare County Council_385
Detailed Design, Construction Administration and Project Handover of all scheme works, as approved or modified by An Coimisiún Pleanála. Approximately 2.0 km of new single carriageway mobility corridor extending from the R403 Clane Road to the R405 Hazelhatch Road, incorporating high quality active travel provision throughout. A new 66m long clear span bridge crossing of the River Liffey, designed in accordance with relevant Eurocodes and OPW requirements, with no in stream works required. Segregated footpaths and cycle facilities provided along the full length of the route, including: 2.0m wide one way cycle tracks and 2.0 m wide footpaths on both sides of the carriageway for the majority of the corridor; and a 3.0 m wide two way cycle track and footpath on constrained sections approaching Hazelhatch and Celbridge Train Station. New and upgraded junctions including signalised junctions at the R403 Clane Road, Newtown Road and R405 Hazelhatch Road, together with a priority junction at Simmonstown Manor Road and improvements to the Loughlinstown Road roundabout. Public lighting, drainage and SuDS infrastructure, including roadside drainage systems and attenuation features designed to limit discharge to greenfield run off rates and improve existing flood risk conditions. Landscaping, planting and biodiversity measures, including native species woodland and hedgerow planting, tree planting and integration of sustainable drainage features, delivering a net biodiversity gain along the corridor. Utility diversions, protections and accommodation works, including foul and surface water drainage infrastructure, watermains, ESB, Gas Networks and telecommunications assets, as required to facilitate delivery of the scheme. The Consultant shall undertake an Infrastructure Review in conjunction with Kildare County Council, relevant utility providers and other key stakeholders. All environmental mitigation, monitoring and reporting required under the Appropriate Assessment process, Natura Impact Statement, Flood Risk Assessment, and associated environmental and technical assessments accompanying the Section 177AE application.
Místo
Ireland
Období Služby
39 Months
Maximální Hodnota
300.000 €
Termín
25.08.2026 • 14:00
27
Dny
Multi-Party Framework for Bridge Rehabilitation Consultancy Services, Assessment, Design and Inspection for Offaly County Council - Initial Contract - Boyne Bridge and Raheenakeeran Bridge Co. Offaly
●Offaly County Council_448
●Offaly County Council_448
Multi-Party Framework for Bridge Rehabilitation Consultancy Services, Assessment, Design and Inspection for Offaly County Council - Initial Contract - Boyne Bridge and Raheenakeeran Bridge Co. Offaly. Design Consultancy Services (Stages ii to v)
Místo
Ireland
Období Služby
60 Months
Maximální Hodnota
2.000.000 €
Termín
14.08.2026 • 14:00
16
Dny
BE3703C UL RFT for the Provision of Hard and Soft Landscaping Maintenance
●Education Procurement Service (EPS)
●Education Procurement Service (EPS)
Installation, reinstatement and repair of Campus landscape hard works including paving/kerbing, traffic management, fencing, bollards, seating, bicycle racks, signage, gates, excavation, trench work, repair of underground services, construction of access chambers, slabs, mini-pillars, sourcing materials, and assistance with top soiling and grading.
Místo
Limerick, Ireland
Období Služby
60 Months
Maximální Hodnota
3.750.000 €
Termín
01.09.2026 • 12:00
34
Dny
Request for Tender for Architect Led Multi-Disciplinary Design and Cost Management Team for New Airfield Vehicle Entry Screening Post, Associated Infrastructure and Ancillary Works at Shannon Airport
●Shannon Airport Authority DAC
●Shannon Airport Authority DAC
Architectural and related services, engineering design, cost management for new airfield vehicle entry screening post, associated infrastructure and ancillary works at Shannon Airport.
Místo
Shannon, Ireland
Období Služby
28 Months
Termín
24.08.2026 • 11:00
26
Dny
Intelligent Transport Systems Equipment Frameworks Generation 2
●Transport Infrastructure Ireland (TII)
●Transport Infrastructure Ireland (TII)
Procurement of ITS equipment, installation services and associated civil works required to maintain, renew and expand the network of roadside Intelligent Transport Systems (ITS) equipment.
Místo
Dublin, Ireland
Období Služby
4 Years
Maximální Hodnota
48.000.000 €
Termín
21.08.2026 • 10:00
23
Dny
Procurement of an Integrated Design Team for New DV Refuge at Tailteann Drive, Navan, Co Meath for Meath Women's Aid Housing Association CLG
●Meath Women’s Aid Housing Association CLG
●Meath Women’s Aid Housing Association CLG
Beschaffung eines integrierten Design-Teams bestehend aus Projektmanager, Architekt mit Landschaftsdesign-Dienstleistungen, Vertretung des Auftraggebers, Projektüberwacher für den Designprozess, Brandschutz- und DAC-Ingenieur, Design- und Zertifizierungsbeauftragte, Bauingenieur für Zivil- und Tragwerksbau, Gebäudeanlagentechniker und Kostenplaner für ein neues DV-Refugium an der Tailteann Drive, Navan, Co Meath.
Místo
Navan, Irland
Období Služby
42 Monate
Maximální Hodnota
750.000 €
Termín
14.08.2026 • 10:00
16
Dny
TEN2600112 - cFT for Integrated Design Team for the Development of the Bailieborough Town Centre Regeneration Scheme (Stages (i) to (ii) for Cavan County Council
●Cavan County Council
●Cavan County Council
Zivilingenieurberatungsleistungen und architektonische Dienstleistungen für die Entwicklung des Regenerierungsschemas für das Bailieborough Town Centre (Stufen i und ii).
Místo
Cavan, Irland
Období Služby
18 Monate
Termín
07.08.2026 • 10:00
9
Dny
FCC/320/25 Establishment of a Single-Supplier Framework Agreement for Traffic Control Equipment Maintenance and Emergency General Works, including an Initial Contract of 12 months for Fingal Co Co
●Fingal County Council_371
●Fingal County Council_371
Establishment of a Single-Supplier Framework Agreement for Traffic Control Equipment Maintenance and Emergency General Works, including an Initial Contract of 12 months for Fingal County Council. The framework is for the maintenance and emergency repair works for Fingal County Council's traffic infrastructure network. The contractor will be providing more energy efficient parts whilst carrying out maintenance works.
Místo
Dublin, Irland
Období Služby
4 Years
Maximální Hodnota
9.000.000 €
Termín
11.08.2026 • 10:00
13
Dny
Související Zakázky v Doprava
Objevte další příležitosti ve stejném odvětví