Najděte svou dokonalou zakázku.
Vyhledávejte zakázky prostřednictvím společností okamžitě
Abbey Mobility
Výroba
Abbey Mobility působí v oboru Výroba.
Zakázky pro Výroba
Oborové shody
Tyto zakázky odpovídají odvětví a zemi společnosti. Uživatelé Premium mohou tuto společnost nárokovat a doplnit chybějící údaje pro přesnější shody. See plan details
Multi-Party Framework Agreement for Civil Engineering Works at Dublin Port
●Dublin Port Company_411
●Dublin Port Company_411
Deliver a broad range of civil engineering and associated capital works at Dublin Port and other DPC-controlled lands, including marine and quay works, dredging, roads, bridges, drainage, utilities, remediation, buildings and port electrification. Framework members must be capable of delivering the full range, individually or as a consortium.
Místo
Dublin, Ireland
Období Služby
72 months
Hodnota zakázky
250 000 000 €
Termín
12.11.2026 • 12:00
5
Dny
ET2607 - Provision of an Interactive and Connected Breathalyser Terminal Service
●Road Safety Authority (RSA)
●Road Safety Authority (RSA)
Provide an interactive, connected breathalyser terminal service for the Road Safety Authority, as detailed in the tender requirements.
Místo
Ireland
Období Služby
84 months
Hodnota zakázky
1 500 000 €
Termín
04.12.2026 • 10:00
27
Dny
●Midland Agri Consultants Ltd.
Supply, deliver, install and commission four multi-purpose machinery training simulators with associated software and licences. Provide initial training, warranty, maintenance, technical support and after-sales service.
Místo
Granard, County Longford, Ireland
Období Služby
24 months
Hodnota zakázky
269 000 €
Termín
13.11.2026 • 17:00
6
Dny
TENDER FOR THE SUPPLY AND DELIVERY OF HYUNDAI SPARE PARTS
●Irish Defence Forces_1144
●Irish Defence Forces_1144
Supply and deliver Hyundai spare parts for the Defence Forces.
Místo
Dublin, Ireland
Období Služby
48 months
Hodnota zakázky
200 000 €
Termín
22.11.2026 • 12:00
15
Dny
●South Dublin County Council
Provide signage design and procure the manufacture and installation of signage through a multiparty framework. The initial contract covers 15 signs at County Hall and South Dublin County Council Libraries.
Místo
Dublin, Ireland
Období Služby
4 years
Hodnota zakázky
550 000 €
Termín
09.11.2026 • 16:00
2
Dny
Supply of Truck Body Conversions to the Irish Defence Forces.
●Irish Defence Forces_1144
●Irish Defence Forces_1144
Provide high-quality truck conversions and fit-outs for Irish Defence Forces trucks.
Místo
Ireland
Období Služby
48 months
Hodnota zakázky
900 000 €
Termín
20.11.2026 • 12:00
13
Dny
Multi-Party Framework Agreement for the Provision of Logistics and Transport Services to Trinity College Dublin, the University of Dublin
●Trinity College Dublin the University of Dublin_336
●Trinity College Dublin the University of Dublin_336
Provide logistics and transport services for Trinity College Dublin through a multi-party framework agreement. Up to eight contractors may be appointed.
Místo
Dublin, Ireland
Období Služby
48 months
Hodnota zakázky
3 000 000 €
Termín
12.11.2026 • 13:00
5
Dny
Purchase of a new Welfare Van
●Department of Housing Local Government and Heritage
●Department of Housing Local Government and Heritage
The National Parks and Wildlife Service at Glenveagh National Park have a requirement for a Welfare Van a specialized commercial vehicle equipped to transport a small team typically up to 7 people while providing self contained rest and sanitation facilities on mobile or remote work sites
Místo
Wexford, Ireland
Období Služby
3 Months
Hodnota zakázky
95 000 €
Termín
11.11.2026 • 12:00
4
Dny
Second Hand 12 ton Tipper Lorry
●Department of Housing Local Government and Heritage
●Department of Housing Local Government and Heritage
The department has a requirement for a second-hand 12 ton lorry.
Místo
Wexford, Ireland
Období Služby
3 Months
Hodnota zakázky
60 000 €
Termín
10.11.2026 • 12:00
3
Dny
●Bus Eireann/Irish Bus
Supply, Installation and Annual Maintenance of EV Chargers for Buses. Turnkey solution for the supply and installation of electric vehicle charging infrastructure including complete project management, electrical and civil works, transformers, chargers and charging points, back-office support protocols and training of relevant Bus Éireann staff. Provision of suitable energy storage systems or other sustainable backup systems. Services provided on a novated basis to a lead contractor for larger depot construction projects. Compliance with all relevant Irish and European statutory regulations and international standards. Charging protocols: 150kW IEC 61851 Mode 4 DC (CCS 2.0 Combo 2), 3 phase DC EV Charger 120kW-180kW (CCS 2.0 Combo 2), 3 phase DC EV Charger 30kW-60kW (CCS 2.0 Combo 2), 3 phase AC EV Charger 22kW (IEC 61851 Mode 3), 1 phase AC EV Charger 22kW (IEC 61851 Mode 3), 1 phase AC EV Charger 7kW (IEC 61851 Mode 3).
Místo
Dublin, Ireland
Období Služby
not less than 5 years
Termín
29.08.2027 • 15:00
295
Dny
Související Zakázky v Výroba
Objevte další příležitosti ve stejném odvětví