Find your perfect contract.
Search tenders via companies instantly
P.J. Brett & Associates
Construction
Matching Tenders
Wayside Celtic Renewable Energy Project
●Wayside Celtic Football Club CLG
●Wayside Celtic Football Club CLG
The works comprise the removal of existing domestic hot water tanks and associated equipment and the installation of a new heat pump domestic hot water system together with a two-pipe VRF air conditioning system. The successful contractor will be responsible for the supply, installation, controls, commissioning, certification and warranty of all systems, as well as the disposal of existing equipment. All works are to be completed in accordance with the attached tender specification, relevant Irish and EU regulations, and the manufacturers' standards and recommendations.
Location
Kilternan, Ireland
Service Period
12 Months
Max Value
50.000 €
Deadline
28.08.2026 • 16:00
16
Days
Civil Engineering Led Consultancy Team
●Roscommon County Council_424
●Roscommon County Council_424
For the provision of a Preliminary Design and Part 8 Planning for a proposed greyway connection between Drumsna and Jamestown with the option to extending the service, subject to funding, to include stages (ii)c detailed design (iii) construction tender, (iv) construction contract and (v) Project closeout and handover
Location
Roscommon, Ireland
Service Period
24 Months
Max Value
216.000 €
Deadline
04.09.2026 • 14:00
23
Days
Civil Engineering Led Consultancy Team - Drumsna and Jamestown
●Roscommon County Council_424
●Roscommon County Council_424
For the provision of a preliminary design and Part 8 Planning for a proposed greyway connection between Drumsna and Jamestown with the option of extending the service, subject to funding, to include stages (ii) c Detailed Design (iii) Construction tender (iv) Construction contract and (v) Project closeout and handover
Location
Roscommon, Ireland
Service Period
24 Months
Deadline
27.08.2026 • 14:00
15
Days
Engineering and Environmental Consultancy Services for Nenagh Flood Relief Scheme
●Tipperary County Council
●Tipperary County Council
Identification, design and submission for planning consent of a Flood Relief Scheme to alleviate the risk of flooding in the community of Nenagh. Tasks include completing the detailed design and procuring, managing and overseeing the construction of the Scheme. The Consultant will progress both the Engineering and Environmental elements of the Tender Specification.
Location
Nenagh, Ireland
Service Period
108 Months
Max Value
2.750.000 €
Deadline
02.09.2026 • 10:00
21
Days
CFT 3991 - Transport Led Multidisciplinary Consultancy Services
●South Dublin County Council
●South Dublin County Council
Area Based Transport Assessment, District Level Transport Plan and Local Level Transport Plans for Western Side of South Dublin County.
Location
Dublin, Ireland
Service Period
33 Months
Deadline
14.09.2026 • 14:00
33
Days
Bogganfin/Tuam Road Link Road, Monksland Strategic Road Project - Engineering Consultancy Service
●Roscommon County Council_424
●Roscommon County Council_424
Engineering Consultancy Services for the delivery of Stages 1 to 4 of the Monksland Strategic Road Project linking the R362 to the N61 at Monksland, Co. Roscommon
Location
Roscommon, Ireland
Service Period
3 Years
Max Value
300.000 €
Deadline
14.08.2026 • 14:00
2
Days
Framework for Engineering and Environmental Consultancy Services
●Inland Fisheries Ireland
●Inland Fisheries Ireland
Engineering Consultancy and Design Services for Civil/Structural/Hydraulic Engineering
Location
Dublin, Ireland
Service Period
4 Years
Deadline
11.09.2026 • 13:00
30
Days
The Connection of Letterbrick to the Public Water Supply
●Donegal County Council_1193
●Donegal County Council_1193
Donegal County Council wishes to appoint an Engineering Services Provider (ESP) for the design of interconnector watermains for households and private Group Water Schemes (GWSs) located in Letterbrick to the closest point on the Public Water Supply, or other suitable location as determined by UÉ. The service is to include for all Civil and Hydraulic Design services as required; any environmental / ecological evaluations required; preparation and submission of any planning applications required; preparation of construction tender docs, administration of tender process (publication, clarifications, evaluation, etc.); award and management of construction contract. The ESP will also be required to act as PSDP for the Project.
Location
Lifford, Ireland
Service Period
48 Months
Deadline
09.09.2026 • 10:30
28
Days
Engineering Technical Consultancy Services for the Thurles Inner Relief Road
●Tipperary County Council
●Tipperary County Council
Tipperary County Council benötigt technische Beratungsleistungen von einem multidisziplinären Team für die Fortsetzung der Thurles Inner Relief Road. Dies umfasst die Überprüfung bestehender Dokumente und die Fertigstellung ausstehender Auslieferungen für die Phasen 3 und 4 sowie die Vorbereitung aller Auslieferungen für die Phasen 5 bis 7 gemäß den Infrastrukturrichtlinien und dem technischen Bewertungsrahmen.
Location
Clonmel, Irland
Service Period
50 Monate
Max Value
2.000.000 €
Deadline
27.08.2026 • 14:00
15
Days
●Health Service Executive (HSE)
Multi-Party Framework agreement for Energy Efficient Design (EED) on an established design team framework for services awarded on a cascade or mini competitions at sole discretion of the Client for Enabling Works projects an indicative value of typically €1.5m to €20m at University Hospital Galway and off campus.
Location
Galway, Irland
Service Period
4 Monate
Max Value
15.000.000 €
Deadline
21.08.2026 • 15:00
9
Days
Related Tenders in Construction
Discover other opportunities in the same industry