Find your perfect contract.

Search tenders via companies instantly

Expert Search
O'

O'Connor Sutton Cronin

Construction

Dublin, Dublin, Ireland
Structural EngineeringCivil EngineeringConsulting Engineering

Matching Tenders

TR5679 - Mechanical and Electrical Professional Services

Electricity Supply Board ( ESB )

Mechanical and Electrical Professional Services to support the delivery of capital and minor works projects in Dublin region in the Republic of Ireland.

Mechanical EngineeringElectrical EngineeringDesign Services

Location

Dublin, Ireland

Service Period

84 Months

Max Value

1.200.000 €

Deadline

24.08.202610:00

26

Days

HSE Estates SW: Regional Design Team Major Framework (€50M - €400M) 2025 for HSE South West Region

Health Service Executive (HSE)

Regionales Rahmenabkommen für HSE Design Team Services 2025 für Hauptkapitalmaßnahmen mit Projektwerten zwischen 50 Mio. und 400 Mio. EUR (exkl. MwSt.). Rahmen für Architektenleistungen (einschließlich Planer und BIM-Information Manager), Mengenverwalter, Gebäudeingenieur, Bauingenieur für zivil- und strukturelle Arbeiten, Brandschutzberater, Projektüberwachungs-Design-Prozess (PSDP), Auftraggebervertreter, energieeffizientes Design-Facilitator und Zuweisender Zertifikatgeber.

ArchitekturBauingenieurwesenRahmenabkommen

Location

Irland

Service Period

48 Monate

Max Value

800.000.000 €

Deadline

31.08.202610:00

33

Days

Celbridge Hazelhatch Mobility Corridor (Phase 5 to 7)

Kildare County Council_385

Detailed Design, Construction Administration and Project Handover of all scheme works, as approved or modified by An Coimisiún Pleanála. Approximately 2.0 km of new single carriageway mobility corridor extending from the R403 Clane Road to the R405 Hazelhatch Road, incorporating high quality active travel provision throughout. A new 66m long clear span bridge crossing of the River Liffey, designed in accordance with relevant Eurocodes and OPW requirements, with no in stream works required. Segregated footpaths and cycle facilities provided along the full length of the route, including: 2.0m wide one way cycle tracks and 2.0 m wide footpaths on both sides of the carriageway for the majority of the corridor; and a 3.0 m wide two way cycle track and footpath on constrained sections approaching Hazelhatch and Celbridge Train Station. New and upgraded junctions including signalised junctions at the R403 Clane Road, Newtown Road and R405 Hazelhatch Road, together with a priority junction at Simmonstown Manor Road and improvements to the Loughlinstown Road roundabout. Public lighting, drainage and SuDS infrastructure, including roadside drainage systems and attenuation features designed to limit discharge to greenfield run off rates and improve existing flood risk conditions. Landscaping, planting and biodiversity measures, including native species woodland and hedgerow planting, tree planting and integration of sustainable drainage features, delivering a net biodiversity gain along the corridor. Utility diversions, protections and accommodation works, including foul and surface water drainage infrastructure, watermains, ESB, Gas Networks and telecommunications assets, as required to facilitate delivery of the scheme. The Consultant shall undertake an Infrastructure Review in conjunction with Kildare County Council, relevant utility providers and other key stakeholders. All environmental mitigation, monitoring and reporting required under the Appropriate Assessment process, Natura Impact Statement, Flood Risk Assessment, and associated environmental and technical assessments accompanying the Section 177AE application.

Civil EngineeringHighways ConsultancyBridge Design

Location

Ireland

Service Period

39 Months

Max Value

300.000 €

Deadline

25.08.202614:00

28

Days

TR5679 - Mechanical and Electrical Professional Services

Electricity Supply Board ( ESB )

Mechanical and Electrical Professional Services to support the delivery of capital and minor works projects in the Dublin Region.

Engineering designMechanical servicesElectrical services

Location

Dublin, Ireland

Service Period

7 Months

Max Value

1.200.000 €

Deadline

17.08.202610:00

19

Days

Bogganfin/Tuam Road Link Road, Monksland Strategic Road Project - Engineering Consultancy Service

Roscommon County Council_424

Engineering Consultancy Services for the delivery of Stages 1 to 4 of the Monksland Strategic Road Project linking the R362 to the N61 at Monksland, Co. Roscommon

EngineeringCivil EngineeringHighways

Location

Roscommon, Ireland

Service Period

3 Years

Deadline

07.08.202614:00

10

Days

Architect or Engineer Led Integrated Multidisciplinary Design Team Consultancy services for the National Biorefinery Pilot Project (NBPP) Infrastructure Upgrade and Expansion Works

Tipperary County Council

The Project comprises the upgrade and expansion of the NBPP building, including all associated design, coordination, statutory approvals, and construction supervision services. The works will be carried out within an operational (live) facility and shall include the integration of new and existing building elements, services, and systems. The Consultant's Services shall address all relevant site constraints, including continuity of operations, health and safety requirements, phasing of works, and coordination with stakeholders. The scope includes multidisciplinary design services to deliver a compliant, functional, and cost-effective solution in accordance with the Client's requirements and applicable statutory standards.

Architectural DesignEngineering ConsultancyConstruction Supervision

Location

Mid-West, Ireland

Service Period

18 Months

Deadline

20.08.202610:00

22

Days

Multi-Party Framework for Bridge Rehabilitation Consultancy Services, Assessment, Design and Inspection for Offaly County Council - Initial Contract - Boyne Bridge and Raheenakeeran Bridge Co. Offaly

Offaly County Council_448

Multi-Party Framework for Bridge Rehabilitation Consultancy Services, Assessment, Design and Inspection for Offaly County Council - Initial Contract - Boyne Bridge and Raheenakeeran Bridge Co. Offaly. Design Consultancy Services (Stages ii to v)

Bridge rehabilitationStructural engineeringDesign consultancy

Location

Ireland

Service Period

60 Months

Max Value

2.000.000 €

Deadline

14.08.202614:00

17

Days

Civil and Structural Engineering Consultancy Services (Design) and PSDP Consultancy for Monaghan Blackwater Sluices Access Design

Office of Public Works (OPW)

To design improved access infrastructure to 22no sluices (non-return valves) located within the Monaghan Blackwater Arterial Drainage Flood Relief Scheme in Co. Monaghan.

Civil EngineeringStructural DesignFlood Defences

Location

Border, Ireland

Service Period

18 Months

Max Value

145.000 €

Deadline

17.08.202613:00

20

Days

Request for Tender for Architect Led Multi-Disciplinary Design and Cost Management Team for New Airfield Vehicle Entry Screening Post, Associated Infrastructure and Ancillary Works at Shannon Airport

Shannon Airport Authority DAC

Architectural and related services, engineering design, cost management for new airfield vehicle entry screening post, associated infrastructure and ancillary works at Shannon Airport.

ArchitekturIngenieurwesenInfrastruktur

Location

Shannon, Ireland

Service Period

28 Months

Deadline

24.08.202611:00

26

Days

Engineering and Environmental Consultancy Services for Nenagh Flood Relief Scheme

Tipperary County Council

Identification, design and submission for planning consent of a Flood Relief Scheme, completion of detailed design, and procurement, management and oversight of the construction of the Scheme. Tasks include engineering and environmental consultancy services.

EngineeringEnvironmentalFlood Relief

Location

Ireland

Service Period

108 Months

Max Value

3.000.000 €

Deadline

02.09.202610:00

35

Days

1 / 2

Related Tenders in Construction

Discover other opportunities in the same industry

St. Ciaran's Community School Kells

Kells, Irland

Elektrische InstallationNotbeleuchtungFeueralarm

Deadline

13.08.2026

15

Days

Construction of extensions at Mooncoin Junior and Senior Schools Scoil Mhuire NS Mooncoin Co. Waterford

Mooncoin, Irland

SchulbauErweiterungBauarbeiten

Deadline

21.08.2026

23

Days

Integrated Design Team Services for New Municipal Cemetery at Letterkenny, County Donegal

Ireland

Architectural ServicesCemetery ConstructionDesign Team

Deadline

23.08.2026

25

Days

Carrick on Shannon Parks Project (Transformation of 4 Urban Green Areas) in Carrick on Shannon, Co Leitrim

Carrick on Shannon, Irland

ArchitekturLandschaftsplanungStadtentwicklung

Deadline

07.09.2026

41

Days

Refurbishment and Extension of New Ross Library

Ireland

BauarbeitenSanierungErweiterung

Deadline

17.08.2026

20

Days

Emergency Works (Co. Kildare Schools)

Ireland

Architectural servicesEmergency worksSchools

Deadline

23.08.2026

26

Days

Emergency Works (Co. Wicklow Schools)

Dublin, Irland

ArchitekturNotfallmaßnahmenSchulen

Deadline

23.08.2026

26

Days

Fit-Out, Landscaping and Equipment Supply

Inis Meáin, Irland

KüchengeräteLieferungGastronomie

Deadline

21.08.2026

23

Days

TEN2600141 - CfT for Construction of 44 Units at Lios na Ri, Cootehill, Co. Cavan for Cavan County Council

Cavan, Irland

WohnbauMehrfamilienhausBauarbeiten

Deadline

31.08.2026

33

Days

26-108 St. Mary's Primary School Dungarvan - Climate Action and Fabric Defects Works

Dungarvan, Ireland

BauarbeitenSanierungDämmung

Deadline

12.08.2026

15

Days

Deer fencing of 1.7 Ha yew woodland, Killarney National Park.

Killarney, Irland

ZaunbauEibenwaldNaturschutz

Deadline

12.08.2026

15

Days

Employers representative, technical advisory and assigned certifier services for the Project Barrow Social Housing Design and Build Contract

Dublin, Irland

ArchitekturBauberatungÜberwachung

Deadline

27.08.2026

30

Days

Cassan Sound Pier/Breakwater Structural Repairs 2026 - Donegal County Council

Ireland

Pier constructionStructural repairsConcrete works

Deadline

14.08.2026

17

Days

9840 Design and Build Enabling Works at the DART+ and MetroLink Interface at Glasnevin

Dublin, Ireland

ConstructionRailwayDesign and Build

Deadline

25.08.2026

27

Days

Refurbishments and Extension at Cape Clear Heritage Centre at Oileán Chléire, Co. Corcaigh

Cape Clear, Ireland

RefurbishmentExtensionConstruction

Deadline

28.08.2026

30

Days