Find your perfect contract.
Search tenders via companies instantly
HG Construction Ire
Construction
Matching Tenders
●University of Limerick_1124
The proposed project involves the establishment of Architecture Services including Exhibition Design Consultant, Fire and DAC Consultant for LISB1 (Library) Refurbishment University of Limerick. The objective is to appoint suitably qualified consultants to support the delivery of the project in a structured, efficient and compliant manner.
Location
Limerick, Ireland
Service Period
18 Months
Deadline
09.09.2026 • 10:00
27
Days
Multi Party Framework for Project Supervisor for the Design Process PSDP Services
●Dublin Port Company_411
●Dublin Port Company_411
Provide PSDP Services for DPC's capital programme projects in accordance with the Safety, Health and Welfare at Work Construction Regulations 2013 as amended and support DPC in fulfilling its statutory duties as a client in respect of health and safety coordination during the design process, across a range of civil, structural, marine, building and infrastructure projects throughout the framework term. The successful Framework Members must demonstrate the capacity and expertise to fulfil the statutory PSDP role across all project phases, from inception and feasibility through to detailed design, tender support, and handover of the completed Health and Safety File, as required under individual call-off contracts. DPC requires firms with strong health and safety design coordination experience across a range of construction project types, including civil engineering, marine structures, port infrastructure, buildings, and utilities works.
Location
Dublin, Ireland
Service Period
72 Months
Max Value
500.000 €
Deadline
11.09.2026 • 10:00
29
Days
Construction of MUGA for Coolaney/Mullinabreena GAA Club at Achonry
●Coolaney/Mullinabreena GAA club
●Coolaney/Mullinabreena GAA club
Turnkey delivery encompassing all aspects of site preparation, civil works, specialist sports surfacing, perimeter infrastructure, and related ancillary installations. The successful contractor will act as the Project Supervisor Construction Stage (PSCS) and will be responsible for delivering the project in full compliance with current building regulations, health and safety legislation, and relevant sports governing body standards. The scope includes: Site Preparation (Excavation, topsoil removal, earthworks, and sub-grade preparation), Installation of a comprehensive sub-base drainage network, Supply and compaction of standard geotextile membranes and graded stone aggregate layers, Supply and installation of a high-durability, all-weather synthetic sports surface (e.g., 3G synthetic turf or polymeric surfacing) complete with multi-sport line markings, Installation of a heavy-duty, rebound-style twin-wire mesh perimeter fence (typically 3m–4m high) including integrated access/maintenance gates and upper-level ball-stop netting, Provision of a perimeter concrete kerb, concrete access pathways, and floodlighting.
Location
Achonry, Tubbercurry, Co Sligo, Ireland
Service Period
6 Months
Max Value
220.000 €
Deadline
04.09.2026 • 15:00
22
Days
Framework for Engineering and Environmental Consultancy Services
●Inland Fisheries Ireland
●Inland Fisheries Ireland
Engineering Consultancy and Design Services for Civil/Structural/Hydraulic Engineering
Location
Dublin, Ireland
Service Period
4 Years
Deadline
11.09.2026 • 13:00
29
Days
Contractor for Heating Services Upgrade and Gas Conversion Emergency Works Project 2026 at Scariff Community College, Drewsborough, Scariff, Co. Clare
●Limerick and Clare Education and Training Board
●Limerick and Clare Education and Training Board
Contractor for Heating Services Upgrade and Gas Conversion Emergency Works Project 2026 at Scariff Community College, Drewsborough, Scariff, Co. Clare
Location
Scariff, Co. Clare, Ireland
Service Period
12 Months
Max Value
560.000 €
Deadline
21.08.2026 • 10:00
8
Days
Engineering Technical Consultancy Services for the Thurles Inner Relief Road
●Tipperary County Council
●Tipperary County Council
Tipperary County Council benötigt technische Beratungsleistungen von einem multidisziplinären Team für die Fortsetzung der Thurles Inner Relief Road. Dies umfasst die Überprüfung bestehender Dokumente und die Fertigstellung ausstehender Auslieferungen für die Phasen 3 und 4 sowie die Vorbereitung aller Auslieferungen für die Phasen 5 bis 7 gemäß den Infrastrukturrichtlinien und dem technischen Bewertungsrahmen.
Location
Clonmel, Irland
Service Period
50 Monate
Max Value
2.000.000 €
Deadline
27.08.2026 • 14:00
14
Days
Emergency Works (Co. Wicklow Schools)
●Kildare and Wicklow Education and Training Board
●Kildare and Wicklow Education and Training Board
Architectural Consultancy Services projects comprising of * Improving Disability Access to the Main Entrance in Glenart College, Arklow, Co. Wicklow. * Roof repair works on the main school building and sports hall in Avondale Community College, Rathdrum, Co. Wicklow.
Location
Dublin, Irland
Service Period
18 Monate
Max Value
85.000 €
Deadline
23.08.2026 • 21:45
10
Days
Emergency Works (Co. Kildare Schools)
●Kildare and Wicklow Education and Training Board
●Kildare and Wicklow Education and Training Board
Architectural Consultancy Services for emergency works including: repair of defective render at Athy Community College, replacement and automation of doors at Ard Scoil Rath Iomghain, and roof repair works to prefabricated buildings and the PE hall at Ard Scoil Rath Iomghain.
Location
Ireland
Service Period
18 Months
Max Value
47.000 €
Deadline
23.08.2026 • 21:45
10
Days
9840 Design and Build Enabling Works at the DART+ and MetroLink Interface at Glasnevin
●Iarnród Eireann-Irish Rail
●Iarnród Eireann-Irish Rail
Design and Build of Enabling Works at the DART+ and MetroLink Interface at Glasnevin, Dublin, to facilitate the construction of MetroLink. Includes detailed design and construction of key enabling works such as site preparation, demolition, excavation, earthmoving, drainage, railway construction works, and associated civil engineering tasks.
Location
Dublin, Ireland
Service Period
5 Years
Max Value
200.000.000 €
Deadline
25.08.2026 • 10:00
12
Days
Celbridge Hazelhatch Mobility Corridor (Phase 5 to 7)
●Kildare County Council_385
●Kildare County Council_385
Detailed Design, Construction Administration and Project Handover of all scheme works, as approved or modified by An Coimisiún Pleanála. Approximately 2.0 km of new single carriageway mobility corridor extending from the R403 Clane Road to the R405 Hazelhatch Road, incorporating high quality active travel provision throughout. A new 66m long clear span bridge crossing of the River Liffey, designed in accordance with relevant Eurocodes and OPW requirements, with no in stream works required. Segregated footpaths and cycle facilities provided along the full length of the route, including: 2.0m wide one way cycle tracks and 2.0 m wide footpaths on both sides of the carriageway for the majority of the corridor; and a 3.0 m wide two way cycle track and footpath on constrained sections approaching Hazelhatch and Celbridge Train Station. New and upgraded junctions including signalised junctions at the R403 Clane Road, Newtown Road and R405 Hazelhatch Road, together with a priority junction at Simmonstown Manor Road and improvements to the Loughlinstown Road roundabout. Public lighting, drainage and SuDS infrastructure, including roadside drainage systems and attenuation features designed to limit discharge to greenfield run off rates and improve existing flood risk conditions. Landscaping, planting and biodiversity measures, including native species woodland and hedgerow planting, tree planting and integration of sustainable drainage features, delivering a net biodiversity gain along the corridor. Utility diversions, protections and accommodation works, including foul and surface water drainage infrastructure, watermains, ESB, Gas Networks and telecommunications assets, as required to facilitate delivery of the scheme. The Consultant shall undertake an Infrastructure Review in conjunction with Kildare County Council, relevant utility providers and other key stakeholders. All environmental mitigation, monitoring and reporting required under the Appropriate Assessment process, Natura Impact Statement, Flood Risk Assessment, and associated environmental and technical assessments accompanying the Section 177AE application.
Location
Ireland
Service Period
39 Months
Max Value
300.000 €
Deadline
25.08.2026 • 14:00
12
Days
Related Tenders in Construction
Discover other opportunities in the same industry