Find your perfect contract.

Search tenders via companies instantly

Expert Search
CT

CTS Group ( IRE )

Construction

Portlaw, Co. Waterford, Ireland
mechanical and electrical fit-outbuilding serviceselectrical installation

Matching Tenders

The project includes for the disconnection, removal and replacement of the 3 No Airconditioning AHU units on the roof plant area of the building, including the associated ductwork, attenuators, fittings, weathered upstands etc. The scope also includes modifications and additions to the existing ductwork installation on the ground floor to serve additional modular offices hat were originally part of an open plan arrangement.

ventilationair-conditioninginstallation

Location

Galway, Ireland

Service Period

36 Months

Max Value

288.000 €

Deadline

11.09.202611:00

29

Days

Údarás Na Gaeltachta_289

Energy Upgrade Works to Unit 1I – Scioból na bhFear, Gaoth Dobhair, comprising construction of a protected stairway and accessible toilet, removal of redundant mechanical and electrical services, and upgrades to ventilation, heating, lighting, insulation and airtightness, together with all associated builders' works.

Building installation workHeatingventilation and air-conditioning installation work

Location

Galway, Ireland

Service Period

36 Months

Deadline

11.09.202611:00

29

Days

Coolaney/Mullinabreena GAA club

Turnkey delivery encompassing all aspects of site preparation, civil works, specialist sports surfacing, perimeter infrastructure, and related ancillary installations. The successful contractor will act as the Project Supervisor Construction Stage (PSCS) and will be responsible for delivering the project in full compliance with current building regulations, health and safety legislation, and relevant sports governing body standards. The scope includes: Site Preparation (Excavation, topsoil removal, earthworks, and sub-grade preparation), Installation of a comprehensive sub-base drainage network, Supply and compaction of standard geotextile membranes and graded stone aggregate layers, Supply and installation of a high-durability, all-weather synthetic sports surface (e.g., 3G synthetic turf or polymeric surfacing) complete with multi-sport line markings, Installation of a heavy-duty, rebound-style twin-wire mesh perimeter fence (typically 3m–4m high) including integrated access/maintenance gates and upper-level ball-stop netting, Provision of a perimeter concrete kerb, concrete access pathways, and floodlighting.

ConstructionSports FacilitiesMUGA

Location

Achonry, Tubbercurry, Co Sligo, Ireland

Service Period

6 Months

Max Value

220.000 €

Deadline

04.09.202615:00

23

Days

Wayside Celtic Renewable Energy Project

Wayside Celtic Football Club CLG

The works comprise the removal of existing domestic hot water tanks and associated equipment and the installation of a new heat pump domestic hot water system together with a two-pipe VRF air conditioning system. The successful contractor will be responsible for the supply, installation, controls, commissioning, certification and warranty of all systems, as well as the disposal of existing equipment. All works are to be completed in accordance with the attached tender specification, relevant Irish and EU regulations, and the manufacturers' standards and recommendations.

Heat pumpsMechanical installationsAir conditioning

Location

Kilternan, Ireland

Service Period

12 Months

Max Value

50.000 €

Deadline

28.08.202616:00

16

Days

EWS at Mountmellick FET Mountmellick Co Laois

Laois and Offaly Education and Training Board (Offaly)

EWS 2026 - Electrical Upgrade Works to Mountmellick FET Mountmellick Co Laois. The works entail replacement of the existing electrical services throughout the building.

Electrical installationElectrical wiringMechanical engineering

Location

Mountmellick, Ireland

Service Period

2 Months

Max Value

200.000 €

Deadline

18.08.202613:00

6

Days

Ballycoolin Bus Depot Design and Build

National Transport Authority_1149

Design and build of a bus depot facility for electric buses, including administrative offices, vehicle washing and cleaning building, maintenance bays, workshops, security facilities, vehicle inspection bays, electrical substation compound, transformer buildings, car parking facilities, cycle parking facilities, and all associated ancillary works.

Bus DepotConstructionDesign and Build

Location

Dublin, Ireland

Service Period

36 Months

Max Value

80.000.000 €

Deadline

28.08.202610:00

15

Days

Delivery of a significant programme of housing projects (social and affordable housing) utilising primarily the Design and Build (DB) delivery model. Includes building construction, multi-dwelling buildings, electrical installation, mechanical installations, and development of residential real estate.

Housing ConstructionDesign and BuildSocial Housing

Location

Dublin, Ireland

Service Period

48 Months

Max Value

1.750.000.000 €

Deadline

26.08.202610:00

13

Days

Piltown Town Centre Regeneration, Co. Kilkenny

Kilkenny County Council_1185

Provision of EV charging and Parking bays and urban renewal enhancement over c.340m of road corridor and 2 no. minor arm approaches. Includes drainage, paving, footpath construction, installation of street furniture, and electrical installation work for EV chargers.

ConstructionEV ChargingRoad Works

Location

Kilkenny, Ireland

Service Period

12 Months

Deadline

01.09.202610:00

19

Days

Related Tenders in Construction

Discover other opportunities in the same industry

Refurbishment works to 2no. Science labs, prep room and existing rooms at Stanhope Secondary School, Manor St, Stoneybatter, Dublin 7.

Dublin 7, Ireland

RefurbishmentScience labsConstruction

Deadline

04.09.2026

22

Days

72 Inpatient Bed Ward Expansion at University Hospital Limerick

Limerick, Ireland

constructionhospitalexpansion

Deadline

11.09.2026

30

Days

GLENMORE TEA ROOMS - RENOVATION AND ALTERATIONS

Kilkenny, Ireland

renovationalterationstea room

Deadline

28.08.2026

15

Days

Mary Immaculate College - Tailteann T2 Building Gym

Limerick, Ireland

Building construction workGym renovationElectrical works

Deadline

07.09.2026

26

Days

TR5227 Maintenance of Fire Safety Systems in Substations

Dublin, Ireland

fire safetymaintenancesubstations

Deadline

09.09.2026

27

Days

Mountmellick Flood Relief Scheme - Site Investigation

Mountmellick, County Laois, Ireland

site investigationflood reliefground investigation

Deadline

09.09.2026

27

Days

Multi-Party Framework Agreement for Suppliers of Concrete for Dublin City Council

Dublin, Ireland

ConcreteFramework AgreementDublin City Council

Deadline

11.09.2026

29

Days

Thermal Upgrade Works at St. Colmcille’s National School, The Quay, Westport, County Mayo

Westport, Ireland

Thermal UpgradeInsulationConstruction

Deadline

28.08.2026

15

Days

Westmeath Non-National Bridge Rehabilitation Works 2026

Mullingar, Ireland

Bridge renewalConstruction workRehabilitation

Deadline

26.08.2026

14

Days

CASWS26 Glanmire CC - Upgrade to Science Labs and Insulation throughout the college

Glanmire Community College, Cork, Ireland

school constructionscience labsinsulation

Deadline

18.08.2026

5

Days

Single Party Framework for The Execution of Fire Stopping Works

Dublin, Ireland

fire-preventionfire-stoppingconstruction

Deadline

04.09.2026

22

Days

The supply, Delivery and installation of Water Wall LEV System for Stone Dust

Dublin, Ireland

Extraction ventilatorsWater Wall LEV SystemStone Dust

Deadline

27.08.2026

14

Days

Consultancy Services for Main Pier Repair Works at An Daingean Fishery Harbour Centre, Dingle, Co. Kerry, Ireland

Kerry, Ireland

Engineering servicesCivil engineeringStructural repairs

Deadline

04.09.2026

22

Days

Minor Building and Carpentry Works

Dublin, Ireland

carpentrybuilding workshealthcare

Deadline

11.09.2026

30

Days

Fenor National School (Co. Waterford)

Fenor, Tramore, Co Waterford, Ireland

constructionschool extensionwastewater treatment

Deadline

28.08.2026

15

Days