Намерете вашия идеален договор.

Търсете обществени поръчки чрез компании мигновено

Експертно Търсене
SO

Sorensen Civil Engineering Ltd

Строителство

Cork, County Cork, Ирландия
civil engineeringmarine constructionconstruction

Съвпадащи обществени поръчки

9840 Design and Build Enabling Works at the DART+ and MetroLink Interface at Glasnevin

Iarnród Eireann-Irish Rail

Design and Build of Enabling Works at the DART+ and MetroLink Interface at Glasnevin, Dublin, to facilitate the construction of MetroLink. Includes detailed design and construction of key enabling works such as site preparation, demolition, excavation, earthmoving, drainage, railway construction works, and associated civil engineering tasks.

ConstructionRailwayDesign and Build

Местоположение

Dublin, Ireland

Период на Услугата

5 Years

Максимална Стойност

200.000.000 €

Краен Срок

25.08.202610:00

24

Дни

Refurbishments and Extension at Cape Clear Heritage Centre at Oileán Chléire, Co. Corcaigh

Údarás Na Gaeltachta_289

Refurbishments and Extension at Cape Clear Heritage Centre at Oileán Chléire, Co. Corcaigh, Athchóirithe agus Síneadh ar Ionad Oidhreachta Oileán Chléire, Oileán Chléire, Co. Chorcaí

RefurbishmentExtensionConstruction

Местоположение

Cape Clear, Ireland

Период на Услугата

18 Months

Максимална Стойност

300.000 €

Краен Срок

28.08.202611:00

27

Дни

Celbridge Hazelhatch Mobility Corridor (Phase 5 to 7)

Kildare County Council_385

Detailed Design, Construction Administration and Project Handover of all scheme works, as approved or modified by An Coimisiún Pleanála. Approximately 2.0 km of new single carriageway mobility corridor extending from the R403 Clane Road to the R405 Hazelhatch Road, incorporating high quality active travel provision throughout. A new 66m long clear span bridge crossing of the River Liffey, designed in accordance with relevant Eurocodes and OPW requirements, with no in stream works required. Segregated footpaths and cycle facilities provided along the full length of the route, including: 2.0m wide one way cycle tracks and 2.0 m wide footpaths on both sides of the carriageway for the majority of the corridor; and a 3.0 m wide two way cycle track and footpath on constrained sections approaching Hazelhatch and Celbridge Train Station. New and upgraded junctions including signalised junctions at the R403 Clane Road, Newtown Road and R405 Hazelhatch Road, together with a priority junction at Simmonstown Manor Road and improvements to the Loughlinstown Road roundabout. Public lighting, drainage and SuDS infrastructure, including roadside drainage systems and attenuation features designed to limit discharge to greenfield run off rates and improve existing flood risk conditions. Landscaping, planting and biodiversity measures, including native species woodland and hedgerow planting, tree planting and integration of sustainable drainage features, delivering a net biodiversity gain along the corridor. Utility diversions, protections and accommodation works, including foul and surface water drainage infrastructure, watermains, ESB, Gas Networks and telecommunications assets, as required to facilitate delivery of the scheme. The Consultant shall undertake an Infrastructure Review in conjunction with Kildare County Council, relevant utility providers and other key stakeholders. All environmental mitigation, monitoring and reporting required under the Appropriate Assessment process, Natura Impact Statement, Flood Risk Assessment, and associated environmental and technical assessments accompanying the Section 177AE application.

Civil EngineeringHighways ConsultancyBridge Design

Местоположение

Ireland

Период на Услугата

39 Months

Максимална Стойност

300.000 €

Краен Срок

25.08.202614:00

24

Дни

Piltown Town Centre Regeneration, Co. Kilkenny

Kilkenny County Council_1185

Provision of EV charging and Parking bays and urban renewal enhancement over c.340m of road corridor and 2 no. minor arm approaches. Includes drainage, paving, footpath construction, installation of street furniture, and electrical installation work for EV chargers.

ConstructionEV ChargingRoad Works

Местоположение

Kilkenny, Ireland

Период на Услугата

12 Months

Краен Срок

01.09.202610:00

31

Дни

Civil and Structural Engineering Consultancy Services (Design) and PSDP Consultancy for Monaghan Blackwater Sluices Access Design

Office of Public Works (OPW)

To design improved access infrastructure to 22no sluices (non-return valves) located within the Monaghan Blackwater Arterial Drainage Flood Relief Scheme in Co. Monaghan.

Civil EngineeringStructural DesignFlood Defences

Местоположение

Border, Ireland

Период на Услугата

18 Months

Максимална Стойност

145.000 €

Краен Срок

17.08.202613:00

16

Дни

Request for Tender for Architect Led Multi-Disciplinary Design and Cost Management Team for New Airfield Vehicle Entry Screening Post, Associated Infrastructure and Ancillary Works at Shannon Airport

Shannon Airport Authority DAC

Architectural and related services, engineering design, cost management for new airfield vehicle entry screening post, associated infrastructure and ancillary works at Shannon Airport.

ArchitekturIngenieurwesenInfrastruktur

Местоположение

Shannon, Ireland

Период на Услугата

28 Months

Краен Срок

24.08.202611:00

23

Дни

TEN2600112 - cFT for Integrated Design Team for the Development of the Bailieborough Town Centre Regeneration Scheme (Stages (i) to (ii) for Cavan County Council

Cavan County Council

Zivilingenieurberatungsleistungen und architektonische Dienstleistungen für die Entwicklung des Regenerierungsschemas für das Bailieborough Town Centre (Stufen i und ii).

ZivilingenieurwesenArchitekturStadtplanung

Местоположение

Cavan, Irland

Период на Услугата

18 Monate

Краен Срок

07.08.202610:00

6

Дни