Намерете вашия идеален договор.
Търсете обществени поръчки чрез компании мигновено
Service Master Ireland | Service Gas Boilers & Heat Pumps
Управление на съоръжения
Съвпадащи обществени поръчки
Wayside Celtic Renewable Energy Project
●Wayside Celtic Football Club CLG
●Wayside Celtic Football Club CLG
The works comprise the removal of existing domestic hot water tanks and associated equipment and the installation of a new heat pump domestic hot water system together with a two-pipe VRF air conditioning system. The successful contractor will be responsible for the supply, installation, controls, commissioning, certification and warranty of all systems, as well as the disposal of existing equipment. All works are to be completed in accordance with the attached tender specification, relevant Irish and EU regulations, and the manufacturers' standards and recommendations.
Местоположение
Kilternan, Ireland
Период на Услугата
12 Months
Максимална Стойност
50.000 €
Краен Срок
28.08.2026 • 16:00
16
Дни
Свързани Търгове в Управление на съоръжения
Открийте други възможности в същия сектор