Намерете вашия идеален договор.

Търсете обществени поръчки чрез компании мигновено

Експертно Търсене
MA

MarkomTech

Строителство

Ирландия

MarkomTech работи в сектора Строителство.

Поръчки за Строителство

Съвпадения по отрасъл

Тези поръчки са съпоставени въз основа на отрасъла и държавата на компанията. Потребителите с Premium абонамент могат да заявят тази компания и да добавят липсващите данни за по-точни съвпадения. See plan details

●Electricity Supply Board ( ESB )

Multi-supplier framework for commercial services supporting the delivery of ESB’s capital programmes and providing services across ESB Group, including Engineering and Major Projects, ESB Networks, and ESB Generation and Trading. Services are to be delivered in accordance with the RFT scope, framework agreement and associated schedules.

commercial servicescapital programmesframework agreement

Местоположение

Ireland

Период на Услугата

8 years; five (5) years with an option to extend, at the Contracting Entity’s discretion, for a further period or periods of up to three years, in increments of two plus one year basis (i.e. for a further 2+1 years)

Стойност на поръчката

50 000 000 €

Краен Срок

09.11.2026 • 14:00

2

Дни

●Stewarts Care Ltd.

Provision of fully qualified plumber and fully qualified carpenter for 5 days per week/52 weeks per year

plumbingcarpentrymaintenance

Местоположение

Dublin, Ireland

Период на Услугата

36 Months

Стойност на поръчката

770 000 €

Краен Срок

11.11.2026 • 13:00

3

Дни

●Iarnród Eireann-Irish Rail

Design and Build Contractor to complete the design and deliver capacity enhancement and transformation works at Connolly Station. The project will create a new entrance from Preston Street and a passenger concourse within the historic Victorian undercroft, together with new lifts, escalators and staircases providing improved access to Platforms 5, 6 and 7. The works will also include additional emergency escape routes, public-realm improvements, retail, operational and back-of-house spaces, heritage refurbishment, structural alterations and the installation or modification of station and railway systems. The successful Contractor will be required to review and develop the reference design through detailed design to Approved for Construction status and subsequently construct, test and commission the works. The Contractor will also be responsible for providing complete as-built and handover information. The project will be delivered within a constrained, live operational railway environment. The Contractor will be required to manage passenger circulation, railway access, construction phasing, safety assurance, stakeholder engagement, heritage requirements and interfaces with other DART+ contracts. The appointed Contractor will undertake the role of Project Supervisor for the Construction Stage.

ConstructionRailway StationDesign and Build

Местоположение

Dublin, Ireland

Период на Услугата

42 Months

Стойност на поръчката

34 000 000 €

Краен Срок

20.11.2026 • 12:00

12

Дни

●Raheen Group Water Scheme

The project involves the replacement of circa 2.3km of existing watermain, together with installation of new booster pump station and ancillary works

watermainconstructioncivil engineering

Местоположение

Tuamgraney, Ireland

Период на Услугата

4 Months

Стойност на поръчката

900 000 €

Краен Срок

17.11.2026 • 12:00

9

Дни

Garden Design for Knockreer Gardens Killarney National Park

●Department of Housing Local Government and Heritage

Tenders are being sought for the preparation of a Conservation Design and Development Plan (CDDP) focused on the long-term practice of conservation horticulture at Knockreer House Gardens. The CDDP will be guided by best international practice in conservation design and interpretation.

landscape architectureconservation designhorticulture

Местоположение

Wexford, Ireland

Период на Услугата

12 Months

Стойност на поръчката

70 000 €

Краен Срок

27.01.2027 • 15:00

81

Дни

Supply, Installation and Annual Maintenance of EV Chargers for Buses. Turnkey solution for the supply and installation of electric vehicle charging infrastructure including complete project management, electrical and civil works, transformers, chargers and charging points, back-office support protocols and training of relevant Bus Éireann staff. Provision of suitable energy storage systems or other sustainable backup systems. Services provided on a novated basis to a lead contractor for larger depot construction projects. Compliance with all relevant Irish and European statutory regulations and international standards. Charging protocols: 150kW IEC 61851 Mode 4 DC (CCS 2.0 Combo 2), 3 phase DC EV Charger 120kW-180kW (CCS 2.0 Combo 2), 3 phase DC EV Charger 30kW-60kW (CCS 2.0 Combo 2), 3 phase AC EV Charger 22kW (IEC 61851 Mode 3), 1 phase AC EV Charger 22kW (IEC 61851 Mode 3), 1 phase AC EV Charger 7kW (IEC 61851 Mode 3).

Electric Vehicle ChargersInstallationCommissioning

Местоположение

Dublin, Ireland

Период на Услугата

not less than 5 years

Краен Срок

29.08.2027 • 15:00

295

Дни

●Gas Networks Ireland

Commercial advisory services for the procurement and contract management of Liquefied Natural Gas (LNG) and other gas commodities.

LNGProcurementContract Management

Местоположение

Ireland

Период на Услугата

180 Days

Краен Срок

05.05.2036 • 12:00

3466

Дни

Engineering, procurement, and construction works and services to complete infrastructure assets, including but not limited to: marine jetty structure, marine piling, floating pontoon, mooring & breasting dolphins, fender, trestle, HP gas unloading systems, on-shore gas receiving facility, utility systems, metering, odourisation, venting, pipeline and pig traps, high pressure gas grid connection, connection to existing natural gas network, utility connections for power, water and telecom, integration with FSRU, onshore terminal systems, pre commissioning and commissioning services, and management of nominated subcontractor(s).

Marine constructionGas infrastructureEPC works

Местоположение

Ireland

Период на Услугата

28.07.2026 г. - 27.07.2036 г.

Краен Срок

25.07.2036 • 12:00

3547

Дни

9884 Qualification System for Surveys

●Iarnród Eireann-Irish Rail

Vergabe eines Qualifikationssystems (QS) für intrusive Untersuchungsleistungen zur Überwachung der Eisenbahninfrastruktur, Küstengebiete und Gebäudeanlagen von Iarnród Éireann.

Intrusive SurveysEisenbahninfrastrukturBodenuntersuchung

Местоположение

Irland

Период на Услугата

7 Jahre

Краен Срок

21.08.2033 • 12:00

2478

Дни

●Iarnród Eireann-Irish Rail

Qualifikationssystem für Baumfällung und Vegetationsbeseitigung, einschließlich planmäßiger Arbeiten (Baumpflege) und Notfallarbeiten bei sicherheitskritischen Situationen. Ancilläre Dienstleistungen können erforderlich sein.

BaumfällungVegetationsbeseitigungQualifikationssystem

Местоположение

Irland

Период на Услугата

8 Jahre

Краен Срок

04.09.2031 • 12:00

1761

Дни

Свързани Търгове в Строителство

Открийте други възможности в същия сектор

Bealach Seanadh Mhach- Phase 2

County Donegal, Ireland

boardwalkgeogrid walkwaybridge crossings

Краен Срок

09.12.2026

31

Дни

10105 - FUEL TANK INSPECTIONS

Dublin, Ireland

Краен Срок

04.12.2026

26

Дни

Provision of Site Assessment Services to the Abbey Theatre

Dublin, Ireland

Building Condition Surveysite assessmentaccessibility

Краен Срок

09.12.2026

32

Дни

Lisnamult Access Road N63

Roscommon, Ireland

Краен Срок

03.12.2026

26

Дни

Ardsallagh More Access Road

Roscommon, Ireland

Краен Срок

02.12.2026

25

Дни

Mechanical Works to Salesian College Celbridge, Co. Kildare (Heating Upgrade)

Celbridge, County Kildare, Ireland

space heatingheating centerheating upgrade

Краен Срок

24.11.2026

17

Дни

Dunsallagh/Killernan GWS Civil Engineering works to upgrade infrastructure

County Clare, Ireland

Краен Срок

16.11.2026

9

Дни

1300m of 2.4m Height Palisade fencing at Ard Gaoithe Clonmel

Clonmel, County Tipperary, Ireland

Краен Срок

07.12.2026

29

Дни

14 Tullyglass Hill

Shannon, County Clare, Ireland

Краен Срок

03.12.2026

26

Дни

EWS 2no. Boiler Plant Replacement

Cork, Ireland

boiler replacementboiler plantpipework

Краен Срок

24.11.2026

16

Дни

Lisnamult Access Road

Lisnamult, County Roscommon, Ireland

Краен Срок

02.12.2026

25

Дни

Bunscoil Ris, Castlemoyle, New Ross - Special Education Needs Unit Works

New Ross, County Wexford, Ireland

Краен Срок

03.12.2026

25

Дни