Намерете вашия идеален договор.

Търсете обществени поръчки чрез компании мигновено

Експертно Търсене
KB

KB Construction - Low Energy Homes

Строителство

Castlecomer, Kilkenny, Ирландия
Low Energy HomesEnergy Efficient ConstructionInsulation Specifications

Съвпадащи обществени поръчки

Ballycoolin Bus Depot Design and Build

National Transport Authority_1149

Design and build of a bus depot facility for electric buses, including administrative offices, vehicle washing and cleaning building, maintenance bays, workshops, security facilities, vehicle inspection bays, electrical substation compound, transformer buildings, car parking facilities, cycle parking facilities, and all associated ancillary works.

Bus DepotConstructionDesign and Build

Местоположение

Dublin, Ireland

Период на Услугата

36 Months

Максимална Стойност

80.000.000 €

Краен Срок

28.08.202610:00

27

Дни

DCC - Home Building Programme Contractor Multi Party Framework Agreement in 2 Lots A and B

Dublin City Council

Delivery of a significant programme of housing projects (social and affordable housing) utilising primarily the Design and Build (DB) delivery model. Includes building construction, multi-dwelling buildings, electrical installation, mechanical installations, and development of residential real estate.

Housing ConstructionDesign and BuildSocial Housing

Местоположение

Dublin, Ireland

Период на Услугата

48 Months

Максимална Стойност

1.750.000.000 €

Краен Срок

26.08.202610:00

25

Дни

26-108 St. Mary's Primary School Dungarvan - Climate Action and Fabric Defects Works

St. Mary’s Primary School (Dungarvan)

Remedial works to the external building facade to resolve water ingress issues and to restore the integrity of the external facade against further water ingress. Works include external wall treatments, remedial detailing, works to roof overhangs, fascias and soffits, associated internal remedial and repair works. Additionally, installation of attic insulation and pumped cavity wall insulation, and supply and installation of a bike rack.

BauarbeitenSanierungDämmung

Местоположение

Dungarvan, Ireland

Период на Услугата

2 Months

Краен Срок

12.08.202613:00

12

Дни

Alterations of an existing building to form new handball alley with associated development works at Lavey GAA grounds

Lavey GAA

Umbau eines bestehenden Gebäudes zu einer modernen Handballbahn und Innenbereich für Spiele, zusammen mit einem Gemeinschaftsbereich zur Unterstützung von Sport, Freizeit, Gesundheit und Wohlbefinden. Dazu gehören die Entwicklung von Gemeinschaftsflächen und zugehörige Bauarbeiten.

HandballbahnUmbauBauarbeiten

Местоположение

Cavan, Irland

Период на Услугата

3 Monate

Максимална Стойност

250.000 €

Краен Срок

12.08.202610:00

11

Дни

Connolly Dry Canteen DFTC Curragh Camp

Irish Defence Forces_1144

Bauarbeiten am Connolly Dry Canteen, DFTC, Curragh, Co. Kildare. Bezugnahme auf die mechanischen und elektrischen Zeichnungen gemäß dieser Spezifikation. Hauptklassifikation: Bauarbeiten (CPV 45000000), Gebäudebau (45210000), Fenster, Türen und verwandte Artikel (44221000), Sanierungsarbeiten (45453100), Elektrische Installationen (45310000), Mechanische Installationen (45350000).

BauarbeitenSanierungElektrische Installationen

Местоположение

Kildare, Irland

Период на Услугата

6 Monate

Максимална Стойност

600.000 €

Краен Срок

11.08.202610:00

10

Дни

Conference Room Plunkett Mess DFTC Curragh Camp

Irish Defence Forces_1144

Bauarbeiten im Conference Room Plunkett Mess, DFTC Curragh Camp, Co. Kildare. Dazu gehören: 45210000 Baubauarbeiten, 44221000 Fenster, Türen und verwandte Artikel, 45442100 Malerarbeiten, 45453100 Sanierungsarbeiten, 45310000 Elektroinstallationen, 45350000 Mechanische Installationen.

BauarbeitenSanierungElektroinstallation

Местоположение

Ireland

Период на Услугата

6 Months

Краен Срок

10.08.202610:00

9

Дни

Internal alterations, cabin lift, landing, internal fire doors, glazed screen, mechanical and electrical at Ballyconnell Community Centre, Ballyconnell, Co.Cavan Eircode H14 AY24

Ballyconnell Community Centre

Internal alterations, form new youth hub on first floor, cabin lift, landing, internal fire doors, glazed screen, sliding partition wall, floor finishes, fire alarm upgrade, mechanical and electrical installation at Ballyconnell Community Centre

RefurbishmentBauarbeitenMechanical

Местоположение

Ballyconnell, Irland

Период на Услугата

2 Months

Краен Срок

05.08.202615:30

5

Дни

Air Handling Unit and Chiller Installation at Beaumont Hospital

Beaumont Hospital_403

Installation and commissioning of a new air handling unit and chiller within the Hospital's existing V6b plantroom and chiller compound. The appointed contractor will act as PSCS for the project.

Mechanical EngineeringHVAC InstallationChiller Installation

Местоположение

Dublin, Ireland

Период на Услугата

24 Months

Краен Срок

10.08.202610:00

9

Дни

Refurbishment of Cottage No.16 (Mulligan’s Cottage) in Killarney National Park

Department of Housing Local Government and Heritage

Full architectural/mechanical/electrical refurbishment of Cottage No.16 at Muckross, on the N71, Killarney Kenmare route. Competent building contractors with experience in restoration of old buildings of historical and architectural merit are invited.

RefurbishmentBuilding ConstructionRestoration

Местоположение

Killarney, Irland

Период на Услугата

12 Months

Краен Срок

12.08.202610:00

11

Дни

Свързани Търгове в Строителство

Открийте други възможности в същия сектор

FIN-21 - Architectural and Project Management Services

Dublin, Irland

ArchitekturProjektmanagementBüroumbau

Краен Срок

28.08.2026

28

Дни

SCOIL CROINE NATIONAL SCHOOL

Donegal, Irland

EntwässerungSportplatzSanierung

Краен Срок

19.08.2026

19

Дни

Fit out of Roanmore unit in Waterford for Corlann

Waterford, Irland

BauausführungInnenausbauTagesservice

Краен Срок

03.09.2026

34

Дни

IDA Parkmore Biodiversity Enhancement Proje

Oranmore, County Galway, Irland

LandschaftsgestaltungBiodiversitätPflanzung

Краен Срок

28.08.2026

28

Дни

Daisy Building Enhancement carried out by Donegal County Council

Carndonagh, Irland

BauarbeitenSanierungZäune

Краен Срок

28.08.2026

27

Дни

26/034 - A Qualification System for the provision of Engineering, Procurement, Construction, Operation and Maintenance Services for the Strategic Gas Emergency Reserve

Ireland

Marine constructionGas infrastructureEPC works

Краен Срок

25.07.2036

3646

Дни

Works Contractor PSCS and PSDP - Contractor Design and Build (PWCF2) - Development of 36no. homes and community centre at Mill Lane, Leixlip, Co. Kildare

Leixlip, Irland

BauarbeitenWohnungsbauGemeinschaftszentrum

Краен Срок

04.09.2026

34

Дни

Enabling works for new glasshouse at Glenveagh National Park

West, Irland

BauarbeitenNeubauSanierung

Краен Срок

03.09.2026

33

Дни

Dublin City Council - Contract for Dodder Greenway Milltown Road - Dodder Walk to Dundrum Road Active Travel Scheme

Dublin, Irland

BauarbeitenRadinfrastrukturFußwege

Краен Срок

27.08.2026

27

Дни

Arranmore/Árainn Mhór Slipway Repairs 2026 - Donegal County Council

Arranmore Island, Ireland

Pier constructionSlipway repairsMarine works

Краен Срок

20.08.2026

20

Дни

Fire Compliance Works to 82 number apartments over two phases at Rochdale, Claremount Avenue, Honey Park, Dun Laoghaire, Dublin.

Dublin, Irland

FeuerwehrBauarbeitenMehrfamilienhaus

Краен Срок

01.09.2026

32

Дни

Design, Construction and Delivery of Cherry Orchard (Affordable for Sale) Housing Development (Pro405)

Dublin, Irland

BauWohnungsbauNeubau

Краен Срок

25.08.2026

25

Дни

Construction of SEN Extension to Clarecastle National School

Clarecastle, Irland

SchulbauSEN-ErweiterungNeubau

Краен Срок

28.08.2026

27

Дни

Emergency Works (Co. Wicklow Schools)

Dublin, Irland

ArchitekturNotfallmaßnahmenSchulen

Краен Срок

23.08.2026

23

Дни

Integrated Design Team Services for New Municipal Cemetery at Letterkenny, County Donegal

Ireland

Architectural ServicesCemetery ConstructionDesign Team

Краен Срок

23.08.2026

22

Дни